9−11904.04.2 Post Holes in Ledge. “Post Holes in Ledge" will be m easured by the number of such holes actually installed in accordance with the Plans and/or as directed by the Engineer. Fence posts unsuitable for resetting through no fault of the Contractor shall be replaced with new posts and said new posts shall be measured for payment by the actual number of such posts furnished and installed. 904.05 BASIS OF PAYMENT .
904.05.1 Remove and Reset Fence. The accepted quantities of "Remove and Reset Fence" will
be paid for at the contract unit price per linear foot as listed in the Proposal. The price so-stated constitutes full and complete compensation for all labor, materials, equipment, backfill, pavement patch, and clearing, and all incidentals required to finish the work, complete and accepted by the Engineer. The accepted quantities of "Fence Posts Replaced" will be paid for at the contract unit price per each as listed in the Proposal. The price so-s tated constitutes full and complete compensation for all labor, materials, and equipment, and all incidentals required to finish the work, complete in place and accepted by the Engineer. 904.05.2 Post Holes in Ledge. The accepted quantities of "Post Holes in Ledge" will be paid for at the contract unit price per each as listed in the Proposal. The price so-s tated constitutes full and complete compensation for all labor, materials, equipment, including non-shrink grout or leadite backfill, and all incidentals required to finish the work, complete and accepted by the Engineer.
905.01 DESCRIPTION . This work consists of constructing sidewalks, wheel chair ramps, and
driveways on prepared gravel bases at the locations indicated on the Plans or as directed by the Engineer, all in accordance with these Specifications. Sidewalks and driveways may be constructed of either bituminous concrete or Portland cement concrete, as indicated on the Plans.
905.02 MATERIALS. 905.02.1 Portland Cement Concrete. Portland cement concrete for sidewalks, wheel chair ramps,
typical driveways and commercial dr iveways shall conform to the requirements as set forth in Subsections 601.01.1; Classification, and 601.03.1; Proportioning , of these Specifications. Concrete for sidewalk applications shall be modified by the addition of 10% to 20% ground granulated blast furnace slag (GGBFS) or fly as h as a replacement fo r Portland cement per Section 602 of these Specifications.
905.02.2 Bituminous Concrete. Bituminous concrete for sidewalks, wheel chair ramps, and
9−12 driveways shall be as noted on the plans and shall conform to the applicable requirements of Subsection 401.02 of these Specifications. Coarse and fine aggregates, mineral filler, and asphalt cement shall be combined to produce sidewalk and driveway pavements in accordance with the requirements listed under the column heading entitled, "CLASS I-2 or SIDEWALK" in Subsection
905.02.3 Other Materials.
905.03 Construction Methods.
905.03.1 Scheduling Sidewalk Construction . The Contractor shall schedule sidewalk
construction activities such that no areas are left without paved sidewalks for more than seven consecutive calendar days. This means that once the Contractor commences the removal of existing sidewalks at any location within the project, the construction of new sidewalks at that particular location must be completed within seven consecutive calendar days. Removal of sidewalks shall be performed in accordance with the provisions of Subsection
201.03.7 of these Specifications.
The Contractor may be required to saw cut and remove the existing sidewalk 2 feet behind the face of the curb and complete curb-related activities prior to removing the adjacent remaining sidewalk area. Should this work be noted on the plans and/or in the specifications, then saw cutting and any required temporary sidewalk patching material will be paid for under separate and appropriate pay items as noted in the contract’s proposal.
905.03.2 Compliance with the Americans with Disabilities Act. To comply with the requirements
of the Americans with Disabilities Act (ADA), sidewalks shall provide a minimum clearance of 36 inches of width at point of narrowing, excluding the curb width, and 48 inches of continuous width elsewhere. The Contractor shall verify with the Engineer that these requirements can be met prior to completing the construction of new sidewalks. Under no circumstances shall any sidewalks be constructed without prior approval of the Engineer if it is determined that these requirements cannot be attained.
905.03.3 Portland Cement Concrete Sidewalks and Driveways.
501.03 2; Para. c of these Specifications.
After installation of the concrete driveway, the contractor shall match bituminous pavement adjacent to parking areas, walkways, and driveways within 14 days.
905.03.4 Bituminous Sidewalks and Driveways.
905.04 Method of Measurement.
905.04.1 Portland Cement Sidewalks and Driveways. "Portland Cement Concrete Sidewalks and
Driveways" will be measured by the number of cubic yards of pavement actually placed in accordance with the Plans and/or as directed by the Engineer.
905.04.2 Bituminous Concrete Sidewalks and Driveways. "Bituminous Concrete Sidewalks and
Driveways" will be measured by t he number of tons of pavement material actually placed in accordance with the Plans and/or as directed by the Engineer.
905.05 BASIS OF PAYMENT. 905.05.1 Portland Cement Concrete Sidewalks and Driveways. The accepted quantities of
"Portland Cement Concrete Sidewalks and Driveways" will be paid for at the contract unit price per cubic yard as listed in the Proposal. A maximum 5 percent overrun of the calculated quantities based on the required thickness as shown on the Plans is permissible. The price so stated constitutes full and complete compensation for all labor, materials and equipment, including expansion joint material, reinforcement, and all inci dentals required to finish the work, complete and accepted by the Engineer. Excavation and gravel borrow subbase will be paid for separately under appropriate work items.