708.01 710 SECTION 708 – MONUMENTS AND MARKERS
708.01 Description ................................ ................................ ................... 710
708.02 Materials ................................ ................................ ...................... 710
708.03 Equipm ent ................................ ................................ .................... 711
708.04 Foundation Preparation ................................ ................................ 711
708.05 Manufacture and Erection of Monuments and Markers ............... 711
708.06 Final Finishing and Cleanup ................................ ........................ 712
708.07 Method of Measurement ................................ .............................. 712
708.08 Basis of Payment ................................ ................................ .......... 713
DESCRIPTION
708.01 Description
This work consists of furnishing and erecting monuments or markers composed of Portland cement concrete or other materials approved by the Engineer. Monuments and Markers shall be of the kind, size, dimensions, shapes, and markings as shown on the Plans. MATERIALS
708.02 Materials
Furnish monuments and markers manufactured of Class A concrete, composed of materials including reinforcement meeting 604.02. Provide c oncrete right-of-way markers that have a smooth finish and are fabricated as shown on the Plans. Stone for monuments and markers shall meet 921.07. Metal materials shall conform to the requirements shown on the Plans or specified in the Special Provisions. Provide paint, if required, that meets 910 for the kind and type of paint called for on the Plans. 708.03 711 EQUIPMENT
708.03 Equipment
Provide hoisting equipment, rollers, skids, protecting mats, and other equipment necessary to handle monuments or markers without damage. CONSTRUCTION REQUIREMENTS
708.04 Foundation Preparation
708.05 Manufacture and Erection of Monuments and Markers
Concrete monuments and markers may be precast or cast -in-place. The concrete shall meet the requirements of 604.03 for Class A concrete. 708.06 712 Manufacture monuments and markers in accordance with the applicable provisions of 604. Cut stone monuments and markers from stone conforming to 921.07 and to be of the size and shape and to contain such other details as shown on the Plans or as directed by the Engineer. Place markers in the prepared excavation, and hold firmly in place, true to line and grade, until backfilled. Place backfill in 6 -inch layers, and thoroughly tamp each layer. Install or erect stone or precast monuments on the prepared foundation, set accurately at the proper elevation, and in a manner that will ensure they will remain firmly in place. Set the monuments on blocks or shims to line and grade. Fill the excavation below the bottom of the monument with Class A concrete. Work the concrete in, under, and around the base of the monument until all voids are filled. After the concrete has set, backfill the remainder of the excavation to the natural ground line with suitable m aterial. Perform painting, if called for on the Plans, as specified in 603.
708.06 Final Finishing and Cleanup
The Engineer will inspect monuments or markers after they have been placed in their final position. Remove all defects and scars. Neatly shape the surface of the ground immediately around each installation to the established grade. Dispose of all excess material as directed by the Engineer. Perform f inal cleanup as specified in 104.10. COMPENSATION
708.07 Method of Measurement
The Department will measure Monuments and Markers for payment by the number of individual units furnished, placed, and accepted, complete in place. 708.08 713 The Department will consider e xcavation and foundation preparation, and the backfill material and concrete used in preparing foundations or backfilling the excavation, to be incidental to the work.
708.08 Basis of Payment
The Department will pay for accepted quantities, complete in p lace, at the contract prices as follows: Item Pay Unit Monuments (Description) Each Markers (Description) Each Such payment is full compensation for all labor, materials, equipment, and all other incidentals necessary to complete the work. 709.01 714 SECTION 709 – RIPRAP AND SLOPE PAVEMENT
709.01 Description ................................ ................................ ................... 714
709.02 Materials ................................ ................................ ...................... 714
709.03 Classi fication ................................ ................................ ................ 716
709.04 Equipment ................................ ................................ .................... 717
709.05 Foundation Preparation ................................ ................................ 717
709.06 Rubble -Stone Riprap (Grouted) ................................ ................... 717
709.07 Sacked Sand -Cement Riprap ................................ ........................ 719
709.08 Reinforced Concrete Slope Pavement ................................ .......... 719
709.09 Machined Riprap ................................ ................................ .......... 720
709.10 Final Cleanup ................................ ................................ ............... 720
709.11 Method of Measurement ................................ .............................. 721
709.12 Basis of Payment ................................ ................................ .......... 721
DESCRIPTION
709.01 Description
Riprap consist s of furnishing and setting or placing rubble stones, crushed stone, sacked sand -cement, machined riprap, and embedded riprap. Slope Pavement consist s of constructing a reinforced concrete mat on prepared slopes. MATERIALS
709.02 Materials
To construct riprap and slope pavement, provide materials that meet the following: