801.01 869 SECTION 801 – SEEDING
801.01 Description ................................ ................................ ................... 869
801.02 Materials ................................ ................................ ...................... 869
801.03 Reserv ed ................................ ................................ ....................... 870
801.04 General ................................ ................................ ......................... 870
801.05 Preparing the Seedbed ................................ ................................ .. 870
801.06 Seeding ................................ ................................ ......................... 871
801.07 Mulching ................................ ................................ ...................... 871
801.08 Care During Construction ................................ ............................ 872
801.09 Method of Measurement ................................ .............................. 872
801.10 Basis of Payment ................................ ................................ .......... 874
DESCRIPTION
801.01 Description
This work consists of furnishing and placing seed, commercial fertilizer, agricultural limestone, and mulch material on all newly graded earthen areas that are not to be paved, stabilized, or sodded. MATERIALS
801.02 Materials
Provide materials as specified in: Water ................................ ................................ ............... 802.02.B.5 Mulch Binder: Emulsified Asphalt, Type SS -1 or AE-3 ....... 904.03 Grass Seed ................................ ................................ ............. 918.01 Commercial Fertilizer ................................ ............................ 918.02 Agricultural Limestone ................................ .......................... 918.04 Mulch Material ................................ ................................ ...... 918.05 Inoculant for Legumes ................................ ........................... 918.06 Liquid Lime ................................ ................................ ............... QPL 801.03 870 801.03 Reserved CONSTRUCTION REQUIREMENTS
801.04 General
Perform seeding work as specified in 209. At the start of permanent seeding operations, prepare, shape, and dress the area to be seeded as specified in 203.08 and 801.05. Unless otherwise directed by the Engineer, do not sow the seed until after placing the topsoil as specified in 203.06. Use topsoil with all permanent seeding activities except where its use would be detrimental to effective erosion and siltation control, as determined by the Engineer . The Contractor may perform Temporary Seeding (with Mulch) or Temporary Seeding (without Mulch) without full preparation of the seedbed as specified in 801.05 , where approved by the Engineer, and application of permanent erosion and siltation control measures is not practicable. Perform all seeding and related operations as continuous operations. A unit in relation to seeding ar ea is 1,000 square feet. For purposes of measuring water, a unit is 1 M.G., which equals 1,000 gallons.
801.05 Preparing the Seedbed
When the soil is in a tillable and workable condition, prepare the seedbed in the following manner and se quence:
801.06 Seeding
The specific seed group will be shown on the Plans or as directed by the Engineer from those specified in 918.01. Sow the seed immediately after preparing the seedbed as specified in 801.05. Sow the seed uniformly using a rotary seeder, hydraulic equipment, or other satisfactory means, at the rate specified in Table 801.06 -1, unless otherwi se specified or directed. Table 801.06 -1: Seed Application Rates Seed Group Application Rate, Pounds per Unit (1,000 square feet) A, B, and C 2.5 B1 0.6 All other groups specified in 918.01 1.5 Before sowing, inoculate Group C seed and seeds of legumes, when sown alone, in accordance with the recommendations of the inoculant manufacturer and as directed by the Engineer. Do not perform any seeding during windy weather or when the ground surface is frozen, wet, o r otherwise non -tillable. Do not perform seeding during December and January unless otherwise allowed.
801.07 Mulching
When seeding with mulch is specified, use hay, straw, or other approved mulch materials. When using hay or straw as th e mulching material, spread it evenly over the seeded area, immediately following the seeding operations, at an approximate rate of 100 pounds per unit for straw and 150 pounds per unit for hay. The Engineer may vary this rate, depending on the texture an d condition of the mulch material and the characteristics of the area seeded. 801.08 872 To hold hay or straw mulch in place, apply an approved tackifier, listed on the QPL, as recommended by the manufacturer. When using wood fiber mulching material , apply it at a rate of 28 to 35 pounds per unit, using hydraulic mulching equipment . Spray the material uniformly on the surface of the prepared seedbed. Adjust the a pplication rate as directed by the Engineer.
801.08 Care During Construction
Maintain all seeded areas to the Engineer’s satisfaction until acceptance of the Work. Repair, as directed by the Engineer, all areas previously seeded and mulched in accordance with this Section but that incurred da mage or failed to successfully establish an acceptable stand of grasses or legumes. Furnish all material and labor required to repair seeded areas damaged due to Contractor negligence at no cost to the Department. The Department will measure and pay for repairs made to seeded areas, except temporary seeding, required through no fault of the Contractor, in accordance with 801.09 and 801.10. If the Engineer directs the Contractor to place additional fer tilizer on the area to be reseeded, apply additional liquid lime at a rate of 5 gallons per acre (15 ounces per 1,000 square feet) if the pH of the soil is below 5.5. After an acceptable stand of grass has been attained, top -dress seeded areas with not less than 10 pounds of fertilizer of Grade 10 -10-10, or equivalent, per unit at approximately 6 -month intervals, unless otherwise specified or directed. COMPENSATION
801.09 Method of Measurement
801.10 Basis of Payment
The Department will pay for accepted quantities, complete in place, at the contract prices as follows: Item Pay Unit Seeding (with Mulch) Unit Crown Vetch Mixture (with Mulch) Unit Temporary Seeding (with Mulch) Unit Seeding (without Mulch) Unit Crown Vetch Mixture (without Mulch) Unit Temporary Seeding (without Mulch) Unit Mulch Unit Seed (Supplemental Application) Pound Fertilizer (Supplemental Application) Ton Payment for Seeding, Crown Vetch Mixture, an d Temporary Seeding is full compensation for preparing the seed bed, furnishing and placing all materials, including fertilizer, agricultural limestone, seed, mulch materials and mulch binder where mulch is used, and inoculant, if specified. When the Contr act does not provide for a unit bid price for Seeding (without Mulch) and this item is used for temporary or permanent erosion control, the Department will make payment at a rate per unit equal to 0.45 times the unit price bid for Seeding (with Mulch). In addition, if the Contract does not provide a unit bid price for mulch and mulch alone is required, the Department will make payment at a rate per unit equal 0.60 times the unit price bid for Seeding (with Mulch). 801.10 875 The Department will pay for Water used to prepare the seed bed and for maintenance at the contract unit price per M.G. (1,000 gallons) of water, which payment is full compensation for furnishing and applying the water as specified. Payment for Seed (Supplemental Application) is full compensation f or minor seedbed repair, mulch materials and mulch binder, and inoculant, if specified. Payment for Fertilizer (Supplemental Application) and fertilizer applied after an acceptable stand of grass has been attained is full compensation for furnishing and applying fertilizer and , where required, liquid lime. 802.01 876 SECTION 802 – LANDSCAPE PLANTING
802.01 Description ................................ ................................ ................... 876
802.02 Materials ................................ ................................ ...................... 876
802.03 Reserved ................................ ................................ ....................... 880
802.04 Time and Condition of Planting ................................ ................... 880
802.05 Staking ................................ ................................ ......................... 880
802.06 Tree Planting ................................ ................................ ................ 880
802.07 Wr apping and Pruning of Trees ................................ ................... 881
802.08 Shrub Planting ................................ ................................ .............. 882
802.09 Seedling Planting ................................ ................................ ......... 882
802.10 Ground Cover Planting ................................ ................................ 883
802.11 Temporary Storage and Heeling -In ................................ .............. 883
802.12 Mulching ................................ ................................ ...................... 883
802.13 Final Cleanup ................................ ................................ ............... 883
802.14 Period of Establishment ................................ ............................... 884
802.15 Inspection and Replacement of Plants ................................ .......... 884
802.16 Method of Measurement ................................ .............................. 885
802.17 Basis of Payment ................................ ................................ .......... 886
DESCRIPTION
802.01 Description
This work consists of furnishing and planting trees, shrubs, seedlings, and ground cover of the kinds and at the locations shown on the Plans or where directed by the Engineer. MATERIALS