803.01 887 SECTION 803 – SODDING
803.01 Description ................................ ................................ ................... 887
803.02 Sod ................................ ................................ ............................... 887
803.03 Fertilizer Grade ................................ ................................ ............ 889
803.04 Ammonium Nitrate ................................ ................................ ...... 889
803.05 Agricultural Limestone ................................ ................................ 889
803.06 Reserved ................................ ................................ ....................... 889
803.07 Weather Limitations ................................ ................................ ..... 889
803.08 Removing and Storing Sod for Resetting ................................ ..... 889
803.09 Sodding ................................ ................................ ........................ 889
803.10 Period of Establishment ................................ ............................... 890
803.11 Disposal of Surplus Material ................................ ........................ 892
803.12 Method of Measurement ................................ .............................. 892
803.13 Basis of Payment ................................ ................................ .......... 892
DESCRIPTION
803.01 Description
This work consists of furnishing and placing sod at the locations show n on the Plans or where directed by the Engineer. Ordinarily, this work will consist of furnishing and placing new sod originating from sources outside the right -of-way. In some cases, however, the work will include removing sod from areas where the requi rements of the improvement would destroy existing sod, storing the sod so removed, and resetting it in areas shown on the Plans or designated by the Engineer. MATERIALS
803.02 Sod
803.04 Ammonium Nitrate
Provide ammonium nitrate conforming to 918.03.
803.05 Agricultural Limestone
Provide agricultural limestone conf orming to 918.04.
803.06 Reserved
CONSTRUCTION REQUIREMENTS
803.07 Weather Limitations
Set or reset sod only when the soil is moist and favorable to growth. Do not perform any setting or resetting between December 1 and February 1, unless weather and soil conditions are considered favorable and permission is granted by the Engineer.
803.08 Removing and Storing Sod for Resetting
Cut, handle, and store sod removed from such areas as lawns, yards, and lots so that the sod can be reset in the same locations from which it was removed. Do not substitute sod unless approved by the Engineer . Unless resetting s od immediately after cutting, stack the sod in piles, and keep it moist until reset. Reset sod within 7 days after removal, unless otherwise approved by the Engineer.
803.09 Sodding
Bring the area to be sodded to the lines and grad es shown on the Plans. Unless otherwise directed by the Engineer, place topsoil as specified in
203.06 before placing sod. When laying sod adjacent to structures, ditch
paving, sidewalks, and similar features, ensure that water will not pond and will flow as designed. Loosen the surface of the ground to be sodded to a depth of not less than 1 inch with a rake or other device. If necessary, sprinkle 803.10 890 the ground until saturated for a minimum depth of 1 inch, and keep moist until the sod is placed. Immediately before placing the sod, apply fertilizer and lime uniformly to the prepared surface of the ground. Apply fertilizer at the rate of 12 pounds of Grade 10 -10-10, or equivalent, per 1,000 square feet. Apply agricultural limes tone at the rate of 100 pounds per 1,000 square feet. Place sod as soon as practicable after removing from the point of origin and keep it in a moist condition during the interim. On urban projects, place the sod on all newly graded cut and fill slopes as work progresses to prevent damage to adjacent facilities and property due to erosion. Take care to retain the soil on the root system during excavating, hauling, and planting. Ensure that all sod is in an acceptable condition upon delivery and placement at the work site. Do not use sod damaged by heat or dry conditions. Carefully place the sod by hand on the prepared ground surface, with the edges set in close contact and, as far as possible, in a position to break joints. Lay and fit each strip of sod into place, thoroughly wet it, and roll with an approved roller or hand -tamp, as approved by the Engineer. On slopes of 2:1 or steeper, pinning or pegging may be required to hold the sod in place.
803.10 Period of Establishment
803.11 Disposal of Surplus Material
Dispose of all surplus material as directed by the Engineer. COMPENSATION
803.12 Method of Measurement
The Department will measure:
803.13 Basis of Payment
The Department will pay for accepted quantities, complete in place, at the contract prices as follows: Item Pay Unit Sodding (New Sod) Square Yard The Department will pay for water applied during the first 14 days after sodding work is complete, including the water used in the re -watering of the sod after the applic ation of the ammonium nitrate, at the contract unit price for Water per M.G. (1,000 gallons). Water applied after this period will not be paid for and will be considered incidental to other items. 805.01 893 SECTION 805 – EROSION CONTROL BLANKETS
805.01 Description ................................ ................................ ................... 893
805.02 Materials ................................ ................................ ...................... 893
805.03 Reserved ................................ ................................ ....................... 893
805.04 Surface Preparation and Blanket Placement ................................ 893
805.05 Maintenance ................................ ................................ ................. 894
805.06 Method of Measurement ................................ .............................. 894
805.07 Basis of Payment ................................ ................................ .......... 894
DESCRIPTION
805.01 Description
This work consists of furnishing and placing erosion control blankets, listed on the QPL, over previously prepared and seeded areas as shown on the Plans or as directed by the Engineer. MATERIALS
805.02 Materials
Provide ma terials as specified in: Erosion Control Blankets ................................ ....................... 920.01 Staples ................................ ................................ .................... 920.02
805.03 Reserved
CONSTRUCTION REQUIREMENTS
805.04 Surface Preparation and Blanket Placement
Shape, fertilize, and seed the areas to receive the erosion control blankets as shown on the Plans or as directed by the Engineer. The surface shall be smooth and free of depressions and eroded areas that would allow water to collect or flow under the bla nket.