Article 1 — Description
Apply water for dust control, earthwork, or base construction.
Article 2 — Materials
Furnish water free of industrial wastes and other objectionable matter.
Article 3 — Equipment
Use sprinklers and spray bars equipped with positive and rapidly working cut -off valves.
Article 4 — Construction
Apply water at a uniform rate and in the required quantity, or as directed.
Article 5 — Measurement
This Item will be measured by the 1,000 gal. (TGL) of water as applied.
Article 6 — Payment
Unless sprinkling is specified as a pay item, the work performed and materials furnished in accordance with this Item will not be measured or paid for directly , but will be subsidiary to pertinent Items. When sprinkling is specified on the plans as a pay item, the work performed and water furnished will be paid for at the unit price bid for “Sprinkling (Base),” “Sprinkling (Earthwork),” or “Sprinkling (Dust Control).” This price is full compensation for furnishing and applying water; furnishing and operating sprinklers and measuring devices; and hauling, equipment, labor, fuel, materials, tools, and incidentals.