Earthwork (Items 200-299)

251Reworking Base Courses

TX · 2024 Standard SpecificationsBook pages 183186View official source ↗

Article 1 — Description

Refinish or rework existing base material with or without asphaltic concrete pavement. Incorporate new base material when shown on the plans.

Article 2 — Materials

Furnish uncontaminated materials of uniform quality that meet the requirements shown on the plans and in conformance with specifications. Notify the Engineer of the proposed material sources and of changes to material sources. The Engineer will verify that the specification requirements are met before the sources may be used. The Engineer may sample and test project materials at any time before compaction. Use Tex -100-E for material definitions.

2.1 Flexible Base. Furnish new base material that meets the requirements of Item 247, “Flexible Base,” for the

type and grade shown on the plans.

2.2 Water . Furnish water free of industrial wastes and other objectionable matter.

Article 3 — Equipment

Provide machinery, tools, and equipment necessary for proper execution of the work.

3.1 Compaction Equipment . Provide rollers in accordance with Item 210, “Rolling.” Provide rollers in

accordance with Item 216, “Proof Rolling,” when required.

3.2 Pulverization Equipment . Provide pulverization equipment that:

 cuts and pulverizes material uniformly to the proper depth using cutters that plane to a uniform surface over the entire width of the cut,  provides a visible indication of the depth of cut at all times, and  uniformly mixes the materials.

Article 4 — Construction

Perform work to the width and depth shown on the typical sections for the type of work shown on the plans. Construct and shape exposed subgrade to conform to typical sections shown on the plans or as directed. Proof roll in accordance with Item 216 when shown on the plans. Correct soft spots as directed. Before scarifying, clean the existing base of objectionable materials by blading, brooming, or other approved methods, unless otherwise shown on the plans. Perform this work in accordance with applicable Items.

4.1 Types of Work .

4.1.1 Type A . Scarifying only.

4.1.2 Type B . Scarifying, salvaging, and re- laying.

4.1.3 Type C . Scarifying and reshaping.

174 4.1.4. Type D . Refinishing.

4.2 Performance of Work.

4.2.1 Scarifying . Loosen and break existing base material, with or without existing asphaltic concrete pavement.

Remo ve asphalt concrete pavement, surface treatment, plant mix seal, and micro- surfacing when shown on the plans and in conformance with applicable Items. Prevent contamination of asphalt material during and after removal. When the existing pavement consists of only a surface treatment, do not remove before scarifying. Scarify existing material for its full width and depth unless otherwise shown on the plans. Do not disturb the underlying subgrade. Break material into particles of not more than 2- 1/2 in., unles s otherwise shown on the plans.

4.2.2 Salvaging . Remove the existing base material and stockpile. Windrow if allowed. Perform salvage

operations without interfering with traffic, proper drainage, or the general requirements of the work. Remove scarified material using an approved method. Keep material free of contamination.

4.2.3 Re-Laying . Prepare subgrade as shown on the plans or as directed before relaying salvaged material. Proof

roll in accordance with Item 216, when shown on the plans. Correct soft spots as directed. Return and rework salvaged base material, with or without additional new base material, on the prepared roadbed. Place salvaged material on the prepared subgrade and sprinkle, blade, and shape the base to conform to the typical sections shown on the plans or as directed. Place new base material and uniformly mix with salvaged material when shown on the plans. Correct, or remove and replace, segregated material with satisfactory material , as directed.

4.2.4 Reshaping . Rework scarified base material with or without additional new base material. Mix and shape

scarified base to conform to the typical sections shown on the plans. When shown on the plans, furnish new base material and uniformly mix with scarified material before shaping. Do not disturb the underlying subgrade. Correct, or remove and replace, segregated material with satisfactory material as directed.

4.2.5 Refinishing . Blade existing base surface to remove irregularities. Cure before placing the pavement on the

refinished base, as shown on the plans or as directed.

4.3 Compaction. Compact using ordinary compaction or density control as shown on the plans. Bring each layer to the moisture content directed. When necessary, sprinkle the material in accordance with Item 204,

“Sprinkling.” Ma intain moisture during compaction within ±2 % of the optimum moisture content as determined in accordance with Tex -113-E . Begin rolling longitudinally at the sides and proceed toward the center, overlapping on successive trips by at least one- half the width of the roller unit. On superelevated curves, begin rolling at the low side and progress toward the high side. Offset alternating trips of the roller. Operate rollers at a speed between 2 and 6 mph, as directed. Rework, recompact, and refinish material that fails to meet or that loses required moisture, density, stability, or finish before the next course is placed or the project is accepted. Continue work until specification requirements are met. Perform the work at no additional expense to the Department.

4.3.1 Ordinary Compaction. Roll using approved compaction equipment as directed. Correct irregularities, depressions, and weak spots immediately by scarifying the areas affected, adding or removing approved material as required, reshaping, and recompacting.

4.3.2 Density and Moisture Control . Compact to a minimum of 98% of the maximum dry density and within ±2%

of the optimum moisture content as determined in accordance with Tex-113-E , unless otherwise shown on the plans. Provide the Engineer with the beginning and ending station numbers of the area completed for testing. The Engineer will determine roadway density and moisture content of completed sections in accordance with Tex-115-E , Part I. The Engineer will determine random locations for testing in accordance with Tex-115-E , Part IV. Do not achieve density by drying the material after compaction. 175 When the density is less than 98% of the maximum dry density, the Engineer may perform additional testing to determine the extent of the area to correct. The Engineer may accept the section if no more than one of the five most recent density tests is below the specified density and the failing test is no more than 3 pcf below the specified density.

4.4 Miscellaneous and Small Areas . Miscellaneous areas are those that typically involve handwork or

discontinuous paving operations, such as temporary detours, driveways, mailbox turnouts, crossovers, gores, spot level -up areas, and other similar areas. Miscellaneous and small areas are not subject to density testing but may be tested as directed.

4.5 Finishing. Immediately after completing compaction, clip, skin, or tight -blade the surface using a maintainer

or subgrade trimmer to a depth of approximately 1/4 in. Remove and dispose of loosened material at an approved location. Seal the clipped surface immediately by rolling using a pneumatic tire roller until a smooth surface is attained. Add small amounts of water as needed during rolling. Shape and maintain the course and surface in conformance with the typical sections, lines, and grades shown on the plans or as directed. In areas where surfacing is to be placed, correct grade deviations in excess of 1/4 in. in 16 ft. measured longitudinally for the entire width of the cross -section. Correct by loosening, adding, or removing material. Reshape and recompact in accordance with Section 251.4.3., “Compaction.”

4.6 Curing. Cure the finished section until the moisture content is at least 2% below optimum or as directed before applying the next successive course or prime coat.

Article 5 — Measure Ment

This Item will be measured by the station, square yard, cubic yard, or ton. Square yard and cubic yard in original position measurement will be established by the widths and depths shown on the plans and the lengths measured in the field. When material is measured in trucks, the weight of the material will be determined on certified scales, or the Contractor must provide a set of standard platform truck scales at a location approved. Scales must meet the requirements of Item 520, “Weighing and Measuring Equipment.” Measurement is further defined for payment as follows.

5.1 Station . By the 100- ft. station measured along the centerline of each roadbed.

5.2 Square Yard . By the square yard of existing base or pavement in its original position. When square yard

meas urement is used, limits of measurement will be as shown on the plans.

5.3 Cubic Yard in Vehicle . By the cubic yard of salvaged material in vehicles as delivered at the stockpile.

5.4 Cubic Yard in Stockpile . By the cubic yard of salvaged material in the final stockpile position by the method

of average end areas or as shown on the plans .

5.5 Cubic Yard in Original Position . By the cubic yard in its original position measured by the method of

average end areas or as shown on the plans .

5.6 Ton. By the ton of dry weight in the trucks as delivered at the stockpile. The dry weight is determined by

deducting the weight of the moisture in the material at the time of weighing from the gross weight of the material. The Engineer will determine the moisture content in the material in accordance with Tex -103-E from samples taken at the time of truck weighing. 176 6. PAYMENT The work performed and materials furnished in accordance with this Item and measured as provided under “Measurement” will be paid for at the unit price bid for “Reworking Base Material” for the type, scarified depth, and compaction method shown on the plans. For cubic yard measurements, the measur ement location (vehicle, stockpile, or original position) will be specified. No additional payment will be made for thickness or width exceeding that shown on the typical sections or provided on the plans for station, square yard, and cubic yard in the original position measurement. This price is full compensation for furnishing and disposing of materials, blading, brooming, scarifying, salvaging, replacing, stockpiling, reshaping, refinishing, compacting, finishing, curing, equipment, labor, tools, and inc identals. Furnishing and delivering new base will be paid for in accordance with Section 247.6.2., “Flexible Base (Roadway Delivery).” Mixing, spreading, blading, shaping, compacting, and finishing new or existing base material will not be paid for directly, but will be subsidiary to this Item. Sprinkling and rolling, except proof rolling, will not be paid for directly, but will be subsidiary to this Item, unless otherwise shown on the plans. When proof rolling is shown on the plans or directed, it will be paid for in accordance with Item 216. Where subgrade is constructed under this Contract, correction of soft spots in the subgrade or existing base will be at the Contractor’s expense. Where subgrade is not constructed under this Contract, correction of soft spots in the subgrade or existing base will be in conformance with pertinent Items or in accordance with Article 4.4., “Changes in the Work.” Removal of existing asphalt concrete pavement will be paid for in conformance with pertinent Items or in accordance with Article 4.4., “Changes in the Work.” Additional restrictions for measurement and payment are as follows.  Type A . Work will be restricted to station and square yard measurement.  Type B . Work will be restricted to station, square yard, and cubic yard in the original position measurement.  Type C . Work will be restricted to station, square yard, and cubic yard in the original position measurement.  Type D . Work will be restricted to station and square yard measurement.

Source: Texas Standard Specifications for Construction and Maintenance of Highways, Streets, and Bridges, 2024 Edition. Pages 183186 of 1,034.