Article 1 — Description
Furnish and install, move, or remove guardrail end treatments.
Article 2 — Materials
Furnish new materials from the MPL of rail element manufacturers. Obtain materials at the location shown on the plans when furnished by the Department.
Article 3 — Construction
Install guardrail end treatments in conformance with manufacturer’s assembly and installation requirements and the details shown on the plans. Provide the Engineer with manufacturer’s installation and repair manuals specific to the guardrail end treatment . Move or remove guardrail end treatments as shown on the plans and as directed. Deliver salvageable materials as shown on the plans or as directed. Dispose of unsalvageable materials in conformance with federal, state, and local regulations.
Article 4 — Measurement
This Item will be measured by each guardrail end treatment.
Article 5 — Payment
The work performed and the materials furnished in accordance with this Item and measured as provided under “Measurement” will be paid for at the unit price bid for “Guardrail End Treatment (Install)” of the post and type specified where applicable, “Guardrail End Treatment (Move and Reset),” or “Guardrail End Treatment (Remove).” This price is full compensation for foundations, materials, stockpiling, disposal of unsalvageable materials, equipment, labor, tools, and incidentals. Payment for “Guardrail End Treatment (Move and Reset)” will include each guardrail end treatment removed from a stockpile or from an existing location and reset in a new location as shown on the plans or as directed. Payment for “Guardrail End Treatment (Remove)” will include each guardrail end treatment removed from an existing location and stockpiled at the location shown on the plans , or disposed of , or as otherwise directed