Part 1 — General
1.1 Section Includes
A.Final cleanup and restoration of all areas disturbed by construction.
1.2 RELATED SECTIONS Not Used
1.3 REFERENCES Not Used
1.4 DEFINITIONS Not Used
1.5 SUBMITTALS Not Used
Part 2 — PRODUCTS Not Used
Part 3 — Execution
3.1 Cleaning Procedures
A.Do not damage the final pavement surface.
B.Only use equipment with rubber tread on the final pavement surface.
C.Clean and finish disturbed areas as follows:
1.Remove protrusions or depressions greater than 3 inches such as rocks, boulders, and ridges.
D.Clean drainage facilities of debris and obstructions caused by construction.
1.Dispose of material removed.
E.Remove or cover with fine material from roadway excavation or borrow, large rocks or boulders on fill slopes with the following exception:
1.Large rocks and boulders protruding from the final graded surface six inches or less, on slopes steeper than 3:1 or beyond the clear zone.
F.Do not undercut the slope on cut slopes.
1.Remove all overhanging rocks.
2.Solid ledge rock or partially buried boulders 0.33 yd3 or more may be left in place on slopes steeper than 4:1 beyond the clear zone.
G.Dispose of project related trash, debris, and spoils from the project site and other project related areas such as office sites and staging areas.
Final Cleanup in other states
Get an email when 01741 changes
Utah revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.
Source: Utah Standard Specifications for Road and Bridge Construction, 2027 Edition. Pages 232–233 of 1,343. View official source ↗