Minnesota Department of Transportation (MnDOT) · 2025 Standard Specifications for Construction
Section 1407 — Final Cleanup
Minnesota 2025 Standard Specifications for Construction, Section 1407. Full text, cross-references and related pay items on BuildSpec.
1407 FINAL CLEANUP Before requesting final inspection in accordance with 1516.2, “Project Acceptance,” the Contractor shall remove the following from the Project Site and other locations outside of the Project Site used in performing the Work: (1) Surplus and discarded Materials (2) Equipment (3) Rubbish (4) Temporary Structures (5) Other items not on the Project Site before execution of the Contract The Contractor shall also leave the Project Site, including borrow pits, in a condition acceptable to the Engineer. The cost of final cleanup is included in the Contract Unit Prices of the…
The rest of Section 1407 — Final Cleanup is for members
You're reading the opening of Section 1407 — Final Cleanup. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.
- Complete section text with subsections and tables
- Search across every state DOT standard specification
- Prior editions and related products