1407Final Cleanup

MN · 2025 Standard Specifications✓ Full text on BuildSpecBook pages 53–0 Save this section

Ask about Section 1407

Get a cited answer from the section text. Click the citation to check it.

One cited answer a day is free. Start a 14-day trial for unlimited, no card required.

Before requesting final inspection in accordance with 1516.2, “Project Acceptance,” the Contractor shall remove the following from the Project Site and other locations outside of the Project Site used in performing the Work:

(1)Surplus and discarded Materials
(2)Equipment
(3)Rubbish
(4)Temporary Structures
(5)Other items not on the Project Site before execution of the Contract

The Contractor shall also leave the Project Site, including borrow pits, in a condition acceptable to the Engineer. The cost of final cleanup is included in the Contract Unit Prices of the Contract Items.

Get an email when 1407 changes

Minnesota revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: Minnesota Standard Specifications for Construction, 2025 Edition. Pages 53–0 of 1,081. View official source ↗

Ask about this section

Scoped to Minnesota 2025 Standard Specifications for Construction, Section 1407 — Final Cleanup. Every answer cites the section it came from, with a verification date — don’t trust a percentage, click the citation.