02981Grinding Pavement

UT · 2026 Standard Specifications✓ Full text on BuildSpecRev. September 12, 2024Book pages 872–874 Save this section

Ask about Section 02981

Get a cited answer from the section text. Click the citation to check it.

One cited answer a day is free. Start a 14-day trial for unlimited, no card required.

GRINDING PAVEMENT

PART 1 GENERAL

1.1SECTION INCLUDES

A.Grinding pavements.

1.2RELATED SECTIONS

A.Section 02701: Pavement Smoothness

1.3REFERENCES Not Used

1.4DEFINITIONS Not Used

1.5SUBMITTALS Not Used

PART 2 PRODUCTS

2.1CONCRETE GRINDING EQUIPMENT

A.Provide and operate equipment utilizing diamond blades mounted on a

self-propelled machine designed for grinding and texturing pavement.

B.Do not use equipment that causes damage to the transverse or

longitudinal joints.

2.2ASPHALT BUMP GRINDING EQUIPMENT

A.Use one of the following pieces of equipment:
1.Equipment utilizing diamond blades mounted on a self-propelled

machine designed for grinding and texturing pavement.

2.A mobile, self-contained machine utilizing diamond tipped teeth

specifically designed to improve longitudinal roadway smoothness with the following characteristics:

a.Independent dual parallel averaging arms with a minimum

length of 25 ft to hold and control the drum height

b.A minimum 8 ft wide cutting drum tapered on the outer

edges to eliminate a vertical edge

Grinding Pavement – 1 of 3

c.Capable of reading common profiler data in real time and

compensating for the roughness identified.

3.Equipment utilizing a hydraulically driven asphalt bump grinding

attachment with the following characteristics:

a.A rotatable housing with swivel casters capable of rotating

right to left and forward and backward.

b.An adjustable averaging ski with a minimum width of 1 ft and

a maximum length of 12 ft.

c.A manual device for setting depth.
d.An internal water system with the ability to flow water

through the center of the drum.

e.A double hit cutting drum designed specifically for

planing/shaving asphalt to close tolerances with a minimum of two wraps of flighting with a flat 0.75 inch carbide or diamond bit on each wrap with 0.05 inch overlap.

B.Do not use micro milling, fine milling or standard milling machines.

2.3VACUUMING EQUIPMENT

A.Use vacuuming equipment to remove residue and excess water.

PART 3 EXECUTION

3.1GRIND

A.Provide a uniform finished texture.
B.Perform grinding in a longitudinal direction.
1.Begin and end grinding at lines normal to the pavement centerline.
C.Do not cause damage to the underlying surface of the pavement.
D.Provide uniform transverse slope of the pavement, to maintain cross slope

drainage, with no depressions or misalignment of slope greater than 0.25 inch in 10 ft when tested with a 10 ft straightedge.

E.Do not grind structures.
F.All residue from the grinding process becomes property and responsibility

of the Contractor.

Grinding Pavement – 2 of 3

3.2CONCRETE GRINDING

A.Grind until the surface of both sides of the transverse joints are in the

same plane and smoothness requirements are met.

B.Provide a uniform finished texture with resultant surface in a parallel,

corduroy-type texture consisting of grooves between 0.090 and 0.150 inch wide.

1.Create a distance between the grooves of between 0.060 and 0.13

inch.

2.Make peaks of the ridges approximately 1/16 inch higher than the

bottom of the grooves

3.3SMOOTHNESS

A.Refer to Section 02701.

END OF SECTION

Grinding Pavement – 3 of 3

Get an email when 02981 changes

Utah revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: Utah Standard Specifications for Road and Bridge Construction, 2026 Edition. Pages 872–874 of 1,331. View official source ↗