227—STEEL GRID FLOORING

VA · 2020 Standard SpecificationsBook pages 254253View official source ↗

226 c. All bolts, nuts, and washers shall be furnished with a marking that readily identifies their manufacturer. The Contractor shall provide the Engineer with an example of such marking and the manufacturer’ s certification for each bolt, nut, and washer supplied to the project. The Contractor shall ensure that two samples from each rota - tional capacity lot, each sample consisting of one bolt, nut, washer, and DTI (if used on the project), are submitted to the Department for testing, and are accompanied by all documentation. Documentation shall indicate the results of all tests and processes performed on the hardware, the name of the testing facility, address where the tests were performed and the date of testing. Test results of bolts and nuts shall also indicate the lot num - ber of the product. Bolts, nuts, and washers from different rotational-capacity lots shall not be shipped in the same container. In addition, shipping containers shall be marked with the rotational-capacity test lot number of the product supplied. SECTION 227—STEEL GRID FLOORING

227.01 Description

These specifications cover plant-fabricated steel for use as a portion of a bridge deck.

227.02 Materials

a.Steel shall conform to ASTM A709, Grade 36, except that material which is not galvanized shall have a copper content of at least 0.2 percent.
b.Concrete for filling steel grid floors shall conform to Section 217 for Class A3, maximum aggregate size No. 7.

227.03 Detail Requirements

a.Open flooring shall be galvanized in accordance with ASTM A123.
b.Painting, when specified or permitted by the Engineer, shall be performed in accordance with Section 411 except that the Department will allow dipping to coat the flooring. SECTION 228—STEEL PILES

228.01 Description

These specifications cover steel fabricated to a shape that will act as a foundation for a structure. The Contractor shall ensure one copy of each applicable mill analysis accompanies the corresponding steel piles shipped to the project and shall supply the Engineer three additional copies of the mill analysis.226.02

Source: Virginia Road and Bridge Specifications, 2020 Edition. Pages 254253 of 1,065.