SECTION 417—DAMP-PROOFING
417.01 Description
This work shall consist of furnishing and applying damp-proofing material to concrete surfaces in accor- dance with the plans and these specifications.
417.02 Materials
Materials shall conform to Section 213 as applicable.
417.03 Procedures
417.04 Measurement and Payment
Damp-proofing, when a pay item, will be measured in square yards and will be paid for at the contract unit price per square yard. The price shall include damp-proofing materials, surface preparation, protective measures, and application. When not a pay item the cost of damp-proofing shall be included in the price for other appropriate pay items. Payment will be made under: ——————————————————Pay Item Pay Unit——————————————————Damp-proofing Square yard—————————————————— SECTION 418—TIMBER STRUCTURES
418.01 Description
This work shall consist of furnishing and erecting timber materials required to complete a structure in accordance with these specifications and in conformity with the lines and grades shown on the plans or as established by the Engineer. 418.01
Get an email when 417 changes
Virginia revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.