780SECTION 606—ROLLED EROSION CONTROL PRODUCTS (RECP)
606.01 Description
This work shall consist of furnishing and placing Rolled Erosion Control Products (RECP) (Standard EC-2 or EC-3 protective coverings) on construction slopes, in drainage channels or concentrated flow areas to facilitate vegetation establishment according to these Specifications and in conformity to the dimensions, lines, and grades shown on the Plans or as established by the Engineer.
606.02 Materials
Materials shall conform to Section 244.02(l). Determination of the type of RECP will be as designated in the Contract and installation shall be at the locations shown on the Plans in accordance with the usage criteria shown in Section 244 and Section 603.
606.03 Procedures
606.04 Measurement and Payment
Rolled Erosion Control Product (Type) installed in drainage channels will be measured in square yards of area covered, complete-in-place, in accordance with the nominal plan dimensions and will be paid for at the contract unit price per square yard for the type specified. Overlaps, overwidths, and cut slots will not be measured for payment. This price shall include furnishing, installing, smoothing, and shaping ditch channels and waterways; preparing seed beds; and furnishing and applying lime, seed, fertilizer, mulch for seeding, and water. Rolled Erosion Control Product (Type) installed on slopes will be measured in square yards of area covered, complete-in-place, in accordance with the nominal plan dimensions and will be paid for at the contract unit price per square yard for the type specified. Overlaps, overwidths, and cut slots will not be measured for separate payment. This price shall include furnishing, installing, preparing seed beds; and furnishing and applying lime, seed, fertilizer, mulch for seeding and watering. The cost of RECP installed at the Contractor’ s option as a HECP component in accordance with Section
603.03 (f) shall be included in the HECP contract unit price.
Sediment Retention Rolls will be measured and paid for in accordance with Section 603. Payment will be made under: ————————————————————————————— Pay Item Pay Unit————————————————————————————— Rolled Erosion Control Product, EC-2 (Type ) Square yard Rolled Erosion Control Product, EC-3 (Type) Square yard————————————————————————————— SECTION 607—HERBICIDE SPRAYING
607.01 Description
This work shall consist of applying an approved herbicide for the control of weeds in turfed areas as indicated on the Plans or as designated by the Engineer.
607.02 Materials
Herbicide shall conform to Section 244.02.607.02