4-55 SECTIO N 410 – MATERIA L TRANSFE R VEHICLE 410.0 1 DESCRIPTION . This work shall consist of furnishing and using an approved material transfer vehicle (MTV) in bituminous concrete paving operations. 410.0 2 CONSTRUCTIO N REQUIREMENTS . An approved MTV shall be used to transfer the bituminous material from the hauling equipment to the paver . The MTV shall operate independently from the paver and shall be a commercially manufactured unit specifically designed for the transfer of mix from the hauling equipment to the paver without depositing the mix on the roadway surface . The MTV or separate hopper shall be designed such that the deposited mix is remixed prior to placement on the roadway . The minimum storage capacity of the MTV, not including any separate hopper, shall be 12 tons. The MTV shall be capable of swing ing or offsetting the material transfer delivery system to side discharge into the paver. If the MTV and associated actions do not effectively eliminate mat segregation as determined by the Engineer, the Engineer may require a hopper insert with remixing c apabilities or other measures . When the MTV traverses a bridge that is not a buried structure, it shall be as near to empty as possible and shall not exceed 5 mph while on any structure . 410.0 3 METHO D OF MEASUREMENT . The quantit y of Material Transfer Vehicle to be measured for payment will be the number of tons of bituminous pavement transferred by the MTV to the paver in the completed and accepted work , as determined by the weigh slips. 410.0 4 BASIS OF PAYMENT . The accepted quan tity of Material Transfer Vehicle will be paid for at the Contract unit price per ton . Payment will be full compensation for the equipment as specified and for furnishing all labor, tools, equipment , and incidentals necessary to complete the work . Payment will be made under: Pay Item Pay Unit
410.10 00 Material Transfer Vehicle ................................ ................................ ......... Ton
4-56 SECTION 413 – HOT IN -PLACE RECYCLING
413.01 DESCRIPTION . This work shall consist of hot in -place recycling (HIR) of the existing pavement
surface, including heating the pavement surface using specialized equipment causing the asphalt to soften, scarifying the softened pavement surface in a continuous process to the depth specified in the Plans, mixing the scarified asphalt pavement with a recycling agent that rejuvenates the asphalt, and placing and compacting the mix back onto the roadway. Excess recycled material not used in the HIR process will become the property and responsibility of the Contractor.
413.02 MATERIALS . Materials shall meet the requirements of the following subsections:
Hot Recycling Agents ................................ ................................ ................................ 702.05 The HIR mixture shall be free of any materials not generally considered to be asphalt pavement.