Effective with the December 2018 Letting 188 2019 Standard Spec ifications Section 465 Asphaltic Surface
465.1Description
islands, curb, rumble strip, and flumes. This section also desc ribes using asphaltic surface for patching, detours, and temporar y construction. The department w ill designate work under the bid items in this section only if the QMP provisions specified for HMA pavements under 460 are not required.
465.2Materials
submit a mix design. Furnish asp haltic mixture meeting the requ irements specified for either type LT or MT mix under 460.2 ; except the engineer will not require the contractor to confor m to the quality management program specified under 460.2.8.
with a type AC asphaltic material. Use coarse and fine mineral aggregates uniformly coated and mixed with the asphaltic material i n an engineer-approved mixing plan t. The contractor may include reclaimed asphaltic pavement materials in the mixture. 465.3 Construction 465.3.1 General
items, the contractor may place material by engineer-approved h and methods. Regardless of the placement technique, spread and sh ape the material to the requi red contour without segregation.
compaction procedures as specified in 450.3.2.6 except as follows: - Compact safety islands as the engineer directs. - Compact flumes using compac tors, tampers, or rollers. - Compact curb as specified in 465.3.2 .
straightedge the surface. Provi de a finished surface with no variation greater than 1/4 inch in 10 feet. Remove and replace out-of-tolerance material or correct the surface using engineer-approved methods. 465.3.2 Asphaltic Curb
pavement surface area the curb will occupy to ensure a good bon d. Apply a tack coat to the area as the engineer directs.
- With an engineer-approved curb laying machine that places and compacts the mixture and finishes the curb to the required shape , grade, and d imensions. - In forms fabricated to the curb shape. Place and thoroughly compact the mixture with vibratory compactors or mechanical tampers and screed to a smooth finish. - For small quantities, by hand placing and shaping. Form the b ack of the curb. Place, tamp, and shape with hand tools. Provide a smooth-finished surface on the curb face and top. 465.3.3 Rumble Strips
with a cutting tip pattern that will produce a relatively smoot h cut of the size, shape, spacing, and smoothness the plans show. Cutti ng heads shall be on a suspensi on independent from the power unit to allow the heads to self-align with slopes and irregularities . The machine shall have a guidance system that consistently provi des the plan alignment of the rum ble strips.
surface inside each depression without tearing or snagging the asphaltic pavement or surfacing. Place rumble strips in the pattern and shape the plans show. For shou lders carrying temporary traffic during construction, do not install rumble strips until after routing traffic back to the mainline.
vacuum the traveled way pavement and shoulder areas. Sweep away or vacuum up milling debris
Effective with the December 2018 Letting 189 2019 Standard Spec ifications before opening adjacent lanes to traffic. Dispose of waste material as specified in 203.3.4 ; do not place on the finished shoulder surface. 465.3.4 Maintenance
465.4Measurement
the methods specified in 450.4 . The department will not measure as phaltic materials separately.
the base of the curb face.
square yard acceptably completed.
Rumble Strips 2-Lane Rural by the linear foot acceptably comple ted, measured as the length along each side of the traveled way, fr om the center of the first gro ove in a segment to the center of the last groove in that segment. A segment is a series of grooves including 50-foot and shorter gaps as well as skips the plans show. Gaps greater than 50 feet define a new se gment. The department will deduct for skips greater than the plans show.
465.5Payment
items: ITEM NUMBER DESCRIPTION UNIT
465.0105 Asphaltic Surface TON
10 Asphaltic Surface Patching TON
15 Asphaltic Surface Detours TON
20 Asphaltic Surface Driveways and Field Entrances TON
25 Asphaltic Surface Temporary TON
465.0305 Asphaltic Surface Safety Islands TON
10 Asphaltic Curb LF
15 Asphaltic Flumes SY
465.0400 Asphaltic Shoulder Rumble Strips LF
25 Asphaltic Shoulder Rumble Strips 2-Lane Rural LF
50 Asphaltic Intersection Rumble Strips SY
75 Asphaltic Centerline Rumble Strips 2-Lane Rural LF
design; for preparing the foundatio n; for providing the asphaltic mixture, including asphaltic material and reclaimed asphaltic pavement materials; and for compacting the mixture.
the contract specifies.
material and reclaimed asphaltic pavement materials; for compac ting the mixture; and for forming the curb.
asphaltic mixture, including asph altic material and reclaimed a sphaltic pavement materials; and for compacting the mixture.
Lane Rural, and Asphaltic Intersection Rumble Strips is full co mpensation for milling; for sweeping or vacuuming; and for disposing of waste materials.
Effective with the December 2018 Letting 190 2019 Standard Spec ifications Section 475 Seal Coat
475.1Description
surface.
475.2Materials
based on a 5:1 ratio.
fractured face.
SIEVE PERCENT PASSING BY WEIGHT 1/2-inch 100 No. 4 0-60 No. 16 0-5
475.3Construction
475.3.1 General
otherwise. Use asphaltic material of the type and grade the spe cial provisions designate. Apply at the plan rate.
Do not apply before impending ra ins if rain might damage the ma terial before placing and rolling the cover aggregates. Limit the surface area treated with asphaltic material in a single day to what can be covered with aggregate and rolled during daylight hours. 475.3.2 Equipment
455.3.2.2 .
- Power broom. - Mechanical spreader capable o f applying aggregat e uniformly a t the plan rate. - Self-propelled steel-wheel roller weighing between 6 and 9 to ns. - Self-propelled, pneumatic-tire roller.
other axle. Ensure that all tires are the same size and uniformly inflated. During roller operation, ensure that the wheel load and tire contact pressure is 30 psi or greater, unless t he contract specifies otherwise. If the engineer requests, furnish manufacturer docum entation showing the contact areas and contact pressures for various wheel loadings and tire inflation pressures.
and the operating mechanism allo ws for starting, stopping, or r eversing direction in a smooth manner, without loosening or distorti ng the surface being rolled.
475.3.3 Preparing the Surface
other suitable equipment to remov e dirt, clay, or other objecti onable matter. 475.3.4 Heating and Applying Asphaltic Material
applied material as required to c reate transverse joints withou t overlapping. Close treated areas to traffic until after applying the cover aggregate. 475.3.5 Applying and Rolling Aggregate
surface. Dry or moisten the aggregate to ensure that it is damp to surface dry. If t he engineer directs, moisten the aggregate to control dust. The engi neer will determ ine the appropriate application rate to