Effective with the December 2018 Letting 401 2019 Standard Spec ifications Section 631 Sodding
631.1Description
designated locations, and constructing sod ditch checks or simi lar structures as the plans show, the contract specifies or as the engineer directs.
631.2Materials
631.2.1 Sod
to the general locality it is to be placed, that is practicably free from weeds or undesirable grasses. When cutting the sod, the grass should be approximately 2 inches long. If longer, cut the grass to approximately this length and ra ke the sod free of debris.
nature of the sod, so that pract icably all of the dense root sy stem is retained, but exposed, in the sod strip and so that handling the so d causes no undue tearing or breaking.
least 12 hours before cutting, apply water to it in sufficient quantities to provide a well-moistened sod throughout the depth it is cut.
texture, and be bright in color throughout. The sod shall not c ontain blade widths of 1/4 inch or greater. Provide a weed free sod that cont ains no more than 3/8 inch of thatch over the base soil. The sod shall consist of a blend or mix of at least 4 fine-leafed turf grasses. At least 2/3 of the grasses by weight, as determined by initial seeding proportions, consists of improved/elite type Kentucky bluegrass varieties.
texture. Provide a sod free of noxious weeds and that contains a combined total of 3 percent or less grassy weeds, sedges, broadleaf weeds, or coarse grasses. The s od shall consist of a blend or mix of at least 4 fine-leafed turf gra sses. At least 70 percent of the grasses by weight, as determined by initial seeding proportions, shall consist of acceptable low maintenanc e varieties or species as listed by the UW Extension. The contractor may obtain this list from the UW Madison, horticulture department, turf grass extension.
and shall be commercially produced on soil having 10 percent or less organic matter by mass. 631.2.2 Water
sod.
631.3Construction
the following criteria:
including mowing, fertilizing, a nd watering, and where the primary objective is for aesthetics. Do not use in urban or suburban areas where main tenance is limited to mowing by the property owner or municipality.
vegetation is needed for erosion control purposes, or in urban or suburban areas where the primary objective is aesthetics, but wher e maintenance is limited to mo wing.
where sandy or gravelly soils predominate. 631.3.1 Preparing the Earth Bed
tops and bottoms of the slopes to a minimum 4-foot radius curve . Ensure that the sodded areas are free from stones, roots, or other undesirable foreign material. Loosen the soil on the sodded area to at least one inch deep and bring it to a reasonably fine granular texture by equipment or hand methods adapted to the purpose. 631.3.2 Placing the Sod
moist. Do not place frozen sod, n or place sod on frozen soil. P lace the sod on the bed within
Effective with the December 2018 Letting 402 2019 Standard Spec ifications approximately 24 hours after cutti ng. Lay the sod so that the j oints at abutting ends of sod strips are not continuous. Lay eac h sod strip to abut snugly against the p reviously laid strip.
18 inches by 24 inches. When laying the sod, roll it or firmly but lightly tamp with suitable wooden or metal tampers to set or press the sod into the underlying soil.
below the adjacent area and place a layer of earth over this juncture. Compact the earth thoroughly so surface water flows over the upper edge of the sod.
ends of the strips in and treat as described above. 631.3.3 Staking and Cleanup
of plasterers’ lath or equival ent stakes, at least 6 inches lon g, spaced as the soil nature and slope steepness dictate, from 18 to 36 inches apart a long the length of the sod strip. If possible, place stakes near the top edge of the s od strip and drive plumb throu gh the sod. After in stalling, stakes should hold the sod firmly in place and present no danger to pe destrians or mowing crews.
water is expected, regardless of the slope. After completing th e surface staking, c lear the surface of loose sod, excess soil, or other foreign material. 631.3.4 Fertilizer
unless otherwise specified. 631.3.5 Watering
moisten the sod thoroughly by s prinkling with water. Keep all s odded areas thoroughly moist by watering or sprinkli ng if rainfall is not sufficient to achieve sod rooting to the earth bed. Water for 30 days after placement or as the engineer directs. Apply water in a manner to preclude washing or erosion. 631.4 Measurement
the square yard acceptably completed.
will determine volume by engineer-approved meters or from tanks of known capacity.
631.5Payment
items: ITEM NUMBER DESCRIPTION UNIT
631.0300 Sod Water MGAL
631.1000 Sod Lawn SY
631.1100 Sod Erosion Control SY
631.1200 Sod Erosion C ontrol Sandy Soil SY
for preparing the earth bed; and for furnishing, placing, staki ng, and rolling the sod. Payment also includes watering if the contra ct does not contain the Sod Wate r bid item.
Effective with the December 2018 Letting 403 2019 Standard Spec ifications Section 632 Furnishing and Planting Plant Materials
632.1Description
includes furnishing all necessary materials, excavating plant h oles, salvaging topsoil, transplanting, backfilling, pruning, mulching, w atering, heeling in, fertilizi ng, wrapping, guying and bracing, protecting against rodents and applying anti- desiccant, disposing of surpl us and waste materials, and necessary care and required replacements pending acceptance.
632.2Materials
632.2.1 General
below. 632.2.2 Plant Materials 632.2.2.1 General
more times according to the kind and size of plants.
from injurious insects, plant diseases, or other plant pests. U se plants hardy unde r the climatic conditions at the work site. Fur nish plants free from the follo wing defects:
632.2.2.2 Collected and Plantation Grown Stock
Nursery Stock recommended for gen eral use and adoption by the American Association of Nurserymen, Inc.
allows collected plant stock, the contractor shall notify the e ngineer of the source of supply or growing site at least 10 days before digging the plants. Dig all collec ted plants with a ro ot spread, or ball of earth, at least 1/3 greater than t hat required for nursery-grow n plants of the same species, variety, and size.
unless the engineer approves otherwise. 632.2.2.3 Lining Out Stock
Nursery Stock. 632.2.2.4 Substitution
substitution, only with the engineer’s approval. The engineer may approve the use of larger plants than those specified. The ball or container size or the root sp read of the larger size shall be increased proportionally, relative to the specified size. 632.2.2.5 Grading Standards
632.2.2.6 Plant Inspection and Legal Requirements
including Wisconsin administra tive code, chapter ATCP 21 governing the inspection, shipping, selling, and handling of plant stock. Attach a tag or label bearing the name and address of the licensed dealer or nurseryman and a certification that the material is from an officially inspected source to each shipment or delivery of plant material. File it with the engineer upon arrival of the plant material at the project site.