General Provisions (00100-00999)

632Furnishing and Planting Plant Materials

WI · 2019 Standard SpecificationsBook pages 412420View official source ↗

Effective with the December 2018 Letting 403 2019 Standard Spec ifications Section 632 Furnishing and Planting Plant Materials

632.1Description

(1)This section describes furnis hing and planting plants of the s pecies, varieties and sizes specified, and

includes furnishing all necessary materials, excavating plant h oles, salvaging topsoil, transplanting, backfilling, pruning, mulching, w atering, heeling in, fertilizi ng, wrapping, guying and bracing, protecting against rodents and applying anti- desiccant, disposing of surpl us and waste materials, and necessary care and required replacements pending acceptance.

632.2Materials

632.2.1 General

(1)Unless specified otherwise, or the engineer approves, use mate rials conforming to the requirements

below. 632.2.2 Plant Materials 632.2.2.1 General

(1)Unless specified otherwise, for all plants use nursery growns tock, transplanted or root-trimmed 2 or

more times according to the kind and size of plants.

(2)Ensure all plants are typical of their species, have well formed tops and root systems, and are free

from injurious insects, plant diseases, or other plant pests. U se plants hardy unde r the climatic conditions at the work site. Fur nish plants free from the follo wing defects:

1.Damage to top, branches , trunk, bark, or roots.
2.Dried out roots.
3.Prematurely opened buds.
4.Thin or poor tops or root systems.
5.Evidence of mold.
6.Dry, loose, or broken ba ll of earth in B&B stock.
7.Dried out or damaged so il mass in B&P or CG stock.

632.2.2.2 Collected and Plantation Grown Stock

(1)Collected and plantation grown stock shall conform to the curr ent edition of the American Standard for

Nursery Stock recommended for gen eral use and adoption by the American Association of Nurserymen, Inc.

(2)The contractor shall furnish co llected and plantation grown plant stock only if specified. If the contract

allows collected plant stock, the contractor shall notify the e ngineer of the source of supply or growing site at least 10 days before digging the plants. Dig all collec ted plants with a ro ot spread, or ball of earth, at least 1/3 greater than t hat required for nursery-grow n plants of the same species, variety, and size.

(3)If collected stock is furnished, leave at least 50 percent of the species undisturbed at the collection site

unless the engineer approves otherwise. 632.2.2.3 Lining Out Stock

(1)Lining out stock and seedling tr ees shall conform to the curre nt edition of the American Standard for

Nursery Stock. 632.2.2.4 Substitution

(1)If the contractor submits written documentation that a specified plant is not obtainable it may make

substitution, only with the engineer’s approval. The engineer may approve the use of larger plants than those specified. The ball or container size or the root sp read of the larger size shall be increased proportionally, relative to the specified size. 632.2.2.5 Grading Standards

(1)Plant stock shall conform to t he current edition of the Americ an Standard for Nursery Stock.

632.2.2.6 Plant Inspection and Legal Requirements

(1)All plant material shipments and deliveries shall comply with State and Federal laws and regulations

including Wisconsin administra tive code, chapter ATCP 21 governing the inspection, shipping, selling, and handling of plant stock. Attach a tag or label bearing the name and address of the licensed dealer or nurseryman and a certification that the material is from an officially inspected source to each shipment or delivery of plant material. File it with the engineer upon arrival of the plant material at the project site.

Effective with the December 2018 Letting 404 2019 Standard Spec ifications 632.2.2.7 Plant Names and Labels

(1)The names and labels used in t he plans and specifications conf orms, with few exceptions, to the

current edition of Standardized Plant Names as adopted by the American Joint Committee on Horticultural Nomenclature.

(2)Ensure all plants are true to name, and secure a legible label to each bundle or plant indicating the

name and size of the plant material. 632.2.2.8 Plant Approval

(1)The contractor shall furnish to the engineer a written list of the sources from which the contractor

proposes to obtain plant materials. Furnish this list to the en gineer within 15 days of the award of the contract. Do not alter this lis t without the engineer’s approva l.

(2)The engineer shall approve all plants. The engineer may inspec t plants at the grower’s nursery or at

the place of collection, or a t the collector's holding site. Th e engineer may tag repr esentative plants at the grower’s nursery. Although the engineer may approve plants at the source, they may still reject plants at the project site.

(3)Replace all rejected plants with acceptable plants of the same species, variety, and size, unless the

engineer directs otherwise. 632.2.2.9 Digging, Handli ng, and Packing Plant Stock 632.2.2.9.1 General

(1)The contractor shall dig all pl ant stock and handle with care and skill to prevent injuries to the trunk,

branches, and roots, and shall pack in an engineer-approved man ner to ensure the plants arrival at the project site undamaged and in good condition.

(2)Transport the plant stock in enc losed vehicles or in a way tha t protects the plant tops from drying.
(3)Handle all plants furnished with earth balls or in containers by the ball or container.

632.2.2.9.2 Bare Root Stock (BR)

(1)If furnishing plant stock BR protect the roots against drying out during moving by using moist

sphagnum moss, straw, or others uitable material, and cover wit h canvas or other suitable covering in an engineer-approved manner. 632.2.2.9.3 Balled and Burlapped Stock (B&B)

(1)If furnishing plant stock B&B, move the plant with a freshly dug ball of earth so firmly wrapped in

burlap that on delivery the soil ball is still firm and compact around the small feeding roots. Ensure each ball is large enough to encompass all the fibrous feeding roots necessary to ensure successful recovery and development of the plant. The minimum sizes of bal ls, ball depth, and diameters, and increased ball sizes for collected stock shall co nform to recom mended balling and burlapping specifications, in the curren t edition of the American Standard for Nursery. 632.2.2.9.4 Balled and Potted Stock (B&P)

(1)If furnishing plant stock B&P, fu rnish plants dug from the gro wing site with the roots contained in a

compact unbroken ball of earth and placed in a plantable fiber container. The size and shape of the earth ball shall conform to the approximate size and shape of the container. Place the stock in the container so that the plant root collar is approximately one in ch below the top of t he container. Fill all voids at potting time with native soil. The minimum ball sizes hall equal the ball size for B&B stock in the current American Standard for Nursery Stock for the plants pecified. 632.2.2.9.5 Container Grown Stock (CG)

(1)If furnishing plant stock CG, furnish well-rooted stock established in containers. This means that when

the container is removed the roo t soil mass shall retain its sh ape but shall not have grown in the container long enough to become container bound. Use sufficiently rigid containers that retain their shape and protect the plant root system during shipping and han dling. For container size, conform to the specifications for CG stock as stated in the current edition of the American Standard for Nursery Stock. 632.2.2.9.6 Machine Transplanted Stock (MT)

(1)For plants furnished or transp lanted as MT stock, the contract or shall move plants from the growing

site to selected sites within t he right-of-way using a tree-tra nsplanting machine. Use a machine capable of digging and removing from the ground an unbroken mass of earth of the specified size and shape. It shall also lift and tran sport the mass of earth suppo rting the specified size plant and containing its roots in an undisturbed condition. The machine shall hold the soil mass and roots in the

Effective with the December 2018 Letting 405 2019 Standard Spec ifications undisturbed condition until the tr ee is lowered into position in a planting hole pre-dug by the same machine. 632.2.3 Backfill Material 632.2.3.1 Compost

(1)Provide an engineer-approved st andard commercial compost of cattle, sheep, or poultry manure or

other organic material. 632.2.3.2 Peat Moss

(1)Peat moss shall consist of at l east 75 percent of partially de composed stems and leaves of sphagnum,

hypnum, polytrichum, and other mosses in which the fibrous and cellular structure is still recognizable. Provide peat moss that is brow n to black in color and nearly fr ee of decomposed colloidal residue, wood, and other foreign matter. The engineer will not accept hu mus peat. Peat moss shall have the following characteristics:

1.Moisture content shall not exceed 60 percent by weight.
2.Ash content shall not excee d 20 percent, based on the oven dry weight of the material.
3.The pH value shall not excee d 7.0 or be less than 3.2 at 77 F.
4.Water holding capacity sha ll at least equal 400 percent, by weight, on an oven dry basis.
(2)Upon request, the contractor shall furnish the engineer with a representative sample of peat moss for

testing according to the Federal specification Q-P-166e for pea t moss, peat humus, and peat reed- sedge.

(3)The contractor shall furnish t he engineer with a certificate stating the type of peat moss, the brand

name and the country o r place of origin. If packed in bales and if using bale size to determine quantities for mixing, the certificate shall also contain the c ubic feet of compressed bale size, the compression ratio, and the appr oximate weight of the bales. The engineer will not require a certificate if this information is marked on the bales. 632.2.3.3 Topsoil

(1)For topsoil, conform to the topsoil specified in 625.2 and to the gradation requirements specified in

625.3.3 .

(2)Salvage topsoil from the plant hole excavation if it conforms to the above requirem ents. The contractor

may use the sod from the plant hole excavation for backfill, to gether with topsoil, provided it is thoroughly broken into small pi eces and used in limited quantit ies near the bottom of the plant hole in a way that does not place it in contact with the small feeder r oots. 632.2.3.4 Planting Mixture

(1)The planting mixture consists o f a blend of peat moss, topsoil, and sand in a ratio of 1:1:1 by volume.

Blend fertilizer into the mixtur e at the rate of 4 pounds of fe rtilizer to each cubic yard of mixture.

(2)The peat moss shall conform to 632.2.3.2 and topsoil to 632.2.3.3 . and have 100 percent passing a

3/8-inch sieve. Obtain the engineer's approval for the sand. 632.2.4 Fertilizer

(1)Fertilizer shall conform to 629 and to the following:

632.2.4.1 Fertilizer for Planting Mixtures

(1)Unless specified otherwise, use a superpho sphate fertilizer co nforming to the following minimum

requirements: Nitrogen ...................................................... ............................................................... ...................................... 0% Phosphoric Acid ............................................... ............................................................... ............................... 20% Potash ........................................................ ............................................................... ...................................... 0% 632.2.4.2 Fertilizer for Plant Holes

(1)For fertilizer used in plant holes, provide water soluble fert ilizer contained in a micropore slow release

polyethylene packet. Each packet shall contain a minimum of one ounce of fertilizer.

(2)The fertilizer shall conform to the following minimum requirem ents:

Nitrogen, not l ess than ....................................... ............................................................... ............................. 16% Phosphoric Acid, not less than ................................ ............................................................... ......................... 8% Potash, not l ess than ......................................... ............................................................... ............................. 16% 632.2.4.3 Fertilizer for Wood Chip Mulch

(1)If using fertilizer on areas receiving wood chip mulch, use a slow release ureaform fertilizer having at

least 38 percent nitrogen.

Effective with the December 2018 Letting 406 2019 Standard Spec ifications 632.2.5 Water

(1)Provide water that is free from i mpurities or substances that might injure the plant.

632.2.6 Mulch

(1)Mulch, if specified, consists o f shredded bark, wood chips, pe at moss, or other suitable material, that

is substantially free of noxious weed seeds and objectionable foreign material. Wood chips are the type obtained from any standard wo od or brush-chipping machine. Obtain the engineer's approval for the type of mulch used. 632.2.7 Wrapping

(1)Wrapping, if specified, consists of a 2-ply waterproofed crepe tree wrapping paper, laminated with a

layer of pliable asphaltic material. 632.2.8 Wound Dressing

(1)Wound dressing, if required, consists of asphalt base tree pai nt or other acceptable material suitable

for applying by brushing, or spraying on bruised or cut surfaces of plants. 632.2.9 Rodent Protection

(1)Rodent protection consists of aluminum or other metal commercial window screening material.

632.2.10 Bracing and Guying Materials

(1)If specified, these materials consist of the wood or steel sta kes, wire, soft rope or straps, turnbuckles,

and other material needed to per form the work. Provide stakes o f solid durable wood approximately 2 inches by 2 inches and of the required length, except that the contractor may use engineer-approved steel posts of the required length for bracing stakes.

(2)For trees of 4 inches or less in diameter use a good quality 1 1 or 12 gauge diameter steel wire and 9

or 10 gauge diameter steel wire fo r trees over 4 inches in diam eter. Use a suitabl e turnbuckle for adjusting the wire tension with the larger wire. 632.2.11 Anti-Desiccant

(1)Anti-desiccant, if specified, shall consist of an engineer-app roved emulsion that provides a film over

plant surfaces permeable enough to allow transpiration. 632.2.12 Vegetation Control Herbicide

(1)Vegetation control herbicide, i f specified, consists of a post -emergence herbicide that, if applied to

leaves and stems of vegetation, i s absorbed and translocated to all parts of the plant including roots and underground stems and is by this means capable of killing t he entire plant. Provide a water- soluble herbicide that deactivates on contact with soil, and le aves no harmful residue. 632.2.13 Selective Pre-emergence Herbicide

(1)The selective pre-emergence he rbicide, if specified, shall control plants emerging from seed, but have

no harmful effect on established plants if applied at recommended rates. The material shall resist leaching and remain effective throughout one growing season. Pr ovide the selective pre-emergence herbicide in liquid or wettable powder form. 632.2.14 Weed Barrier Fabric

(1)Furnish geotextile for weed barrier conforming to the followin g:

TEST METHOD VALUE Minimum weight ASTM D3776 0.328 oz/ft2 Minimum grab tensile strength ASTM D4632 80 lb Minimum apparent breaking elongation ASTM D4632 45% Minimum puncture strength ASTM D4833 35 lb Minimum trapezoid tear strength ASTM D4533 27 lb Maximum apparent opening size ASTM D4751 No. 40 sieve Minimum permittivity,s-1 ASTM D4491 1 . 9 7

(2)The geotextile, if specified, con sists of a material that allows moisture and air permeability, but

prevents the growth of weeds and grasses. The fabric shall cons ist of non-woven polyester, polypropylene, stabilized nylon, polyethylene, or polyvinyliden e chloride. All shall have the minimum strength values in the weakest principal direction.

(3)The contractor shall not use a needle punched non-woven geotex tile.

Effective with the December 2018 Letting 407 2019 Standard Spec ifications 632.2.15 Equipment

(1)The contractor shall provide sufficient watering equipment, in cluding tanks, pumps, hoses, and

accessories to fully perform all the watering required for care in 632.3.19 . The contractor shall determine the capacity and adequ acy of this equipment based on supplying approximately 20 gallons of water per large tree, 10 gallo ns per small tr ee, 5 gallons p er shrub, and 2 1/2 gallons per vine or sumac plant for each required wate ring. Provide a source of water capable of supplying the required volume of water.

632.3Construction

632.3.1 General

(1)The normal spring planting seas on for all plants shall extend to June 1. The normal fall planting

season for all plants except evergreens begins on October 1. Perform fall evergreen planting between September 1 and Octobe r 1. Unless approved otherwise, the contr actor shall not plant if the ground is frozen or if the soil is unsatis factory for planting. The contr actor shall not plant if the temperature is below freezing unless protecting the plant roots to prevent damage.

(2)Do not drag, lift, or pull balled and burlapped plants by the trunk, branches, or fo liage. Do not drop or

handle in any manner that damages the ball or the plant. 632.3.2 Delivery and Temporary Storage

(1)At least 3 days before each deliv ery of plant material to the holding or project site, the contractor shall

notify the engineer of this delivery.

(2)If possible, plant the plants on the day of delivery at the pr oject site. If this is not possible, temporarily

store the plant stock by heeling- in or by placing in a well-ven tilated, cool, moist storage place and adequately protect against drying by using moist sphagnum moss, straw, or other suitable covering around the roots of BR stock and the balls of B&B stock.

(3)Space all plants growing in pots or containers to provide for air circulation and re asonably unrestricted

top spread. Water and otherwise c are for potted and container-g rown plants as necessary to keep them in a healthy growing condition while in storage.

(4)If heeling-in, place bare root p lants in a spade depth trench, fully cover their roots with damp topsoil,

and protect from the sun and wind . The contractor shall properl y care for all heeled-in plants. Plants shall not remain heeled-in from one planting season until the n ext. 632.3.3 Layout of Planting

(1)Unless specified otherwise, t he engineer will stake out the lo cation of plant holes or beds.

632.3.4 Excavation of Plant Holes

(1)Center the plant holes at the lo cation stake, unless the engin eer allows otherwise.
(2)Excavate the plant hole, except for MT stock, to at least the minimum dimensions the plant data chart

included in the plans show or as the engineer directs. However, the minimum diameter of the plant hole must be at least twenty-four inches greater than the diameter of the ball, container, or roots, for the full depth of the plant hol e. The depth of hole shall equal the height of the ball, pot, or container, so that the plant root collar is at ground level when the plant is in its final position and resting on undisturbed ground. Except, if placing the plant in heavy soils , then make the hole deep enough so that the plant root collar is 2 inches above the ground level after planting.

(3)Unless soil conditions make it impossible, dig the planting holes for MT plants by the tree-moving

machine and make them approximat ely the same size and shape as the soil mass containing the root system of the machine moved plant.

(4)Keep the sod and topsoil suitabl e for backfilling separate from the excavated subsoil.
(5)If planting on a slope, measu re the minimum depth of the plant hole from the downward side of the

slope at the hole.

(6)If it is necessary to suspend planting operations until the fo llowing planting season, backfill any open

plant holes before suspending the work. 632.3.5 Pruning

(1)Perform pruning according to ANSI A300 standard practices for tree care operations-tree, shrub, and

other woody plant maintenance. P rune so that the plant retains its natural form. Make all cuts immediately above the bark ridge and branch collar to leave the ridge and collar intact for healing. The contractor shall not prune everg reen plants except to remove de ad or broken branches, or multiple leaders. Treat cut surfaces on oak trees as specified for cut s urfaces and abrasions in 201.3 .

Effective with the December 2018 Letting 408 2019 Standard Spec ifications (2) Cut off smoothly the bruised or broken parts of large or flesh y roots and branches dead, broken, or damaged otherwise, before planti ng. Perform all other pruning n ear the end of the plant establishment period in mid-to-late August, bu t before the final inspection. Unless specified otherwise, or the engineer directs, prune deciduous trees by removing branches th at compete with the dominant central leader, and thin all deciduous plants as necessary to improve t he branch structure of the plant. 632.3.6 Anti-Desiccant

(1)If specified, apply anti-desiccant to evergreen plants before or at the time of planting, and to BRP

plants before shipping from the storage place. Apply it to plan ts being transplanted before they are transplanted. Apply the emulsion at the rate and method the man ufacturer recommends. 632.3.7 Planting

(1)Plant all BR, B&B, BRP, B&P, CG , and MT plants, unless directe d otherwise, according to the method

specified below. If possible, protect BR plants against drying by keeping the roots covered with a canvas or other suitable covering until planted.

(2)Place the plant in the plant hole with its most desirable face towards the most prominent view and hold

it in a vertical position. Spread the roots of BR plants to the ir approximate natural position and prune as required. Place B&B plants wh ile in their wrapped ball. Move and handle only by the ball. Set the plant so that, after settling, the plant root collar is at or 2 inches above the surrounding ground level, as specified above in 632.3.4 .

(3)Unless specified otherwise, ba ckfill the plant hole with topso il composed of 6 parts soil to one part

compost by volume. Place this so il compost mixture in layers around the roots or ball. Carefully tamp each layer in place in a way tha t avoids injuring the roots or ball or disturbing the plant position. Remove the burlap and other wrapping materials from the top one -half of B&B plants. Once approximately 2/3 of the plant hole is backfilled, fill the hol e with water and allow the soil to settle around the roots. After the water is absorbed, fill the plant h ole with topsoil and tamp lightly to grade. Bring any settlement to grade with the topsoil.

(4)Fill holes made for MT plants to about 1/2 the hole depth with slurry made from a 1:1 mixture of water

and compost by volume. Place the sl urry in the hole just before placing the tree in the hole. After removing the machine, backfill any voids remaining with topsoil . To facilitate watering, auger vertical holes around the perip hery of the tree just inside the ball lim its. Space the holes equally a maximum of 4 feet apart. Make each hole dee p enough and large enough to ac cept a perforated pipe 42 inches long with a 2 inch inside diame ter. Insert the per forated pipes into the holes immediately after augering. Make the top of the pi pe flush with the top of the mulch once in its final position. Leave the pipes in place after the tree is established.

(5)After the plantings are in place at least 2 days, but not more than 5, inspect the plantings. Adjust plant

depth and plumb as necessary, and place all additional required backfill. During the inspection period, thoroughly water all inspected plants and remove all twine or r ope and labels attached to trunks or branches. 632.3.8 Fertilizing

(1)Use fertilizer, if spec ified, as follows:

632.3.8.1 Fertilizer for Planting Mixtures

(1)Add fertilizer to the planting mixtures in a way that uniforml y incorporates it at t he rate of 4 pounds of

fertilizer per cubic yard of mixture. 632.3.8.2 Fertilizer for Plant Holes

(1)Uniformly space the number of packets specified on the plans i n each plant hole around the outside of

the plant hole during backfilling. Place the packets as the planting detail sheet shows after partially completing the backfilling. Place them at least 6 inches below the final grade of t he backfill material.

(2)If specified for MT plants, equally space the packets around the hole in niches dug into the plant hole

wall between 9 and 18 inches below the soil surface. 632.3.8.3 Fertilizer for Wood Chip Mulch

(1)If specified, uniformly spread fertilizer for wood chip mulch over the mulch, or soil surfaces to be

mulched, at the rate of 4 pounds per 1000 square feet. 632.3.9 Mulching

(1)Place approximately 3 inches of mulch, if specified, over the backfilled plant hole or plant bed within

the specified area after performing all necessary backfilling a nd adjustment, unless specified otherwise. Pull mulch back 3 to 6 inches from tree trunk. Place mulching material within 5 days of the

Effective with the December 2018 Letting 409 2019 Standard Spec ifications second watering required for planting under 632.3.7. Ensure areas receiving mulch are free of living weeds and grasses bef ore applying mulch. 632.3.10 Vegetation Control Herbicide

(1)If specified, apply vegetation co ntrol herbicide according to manufacturer’s instructions to unwanted

weeds and grasses and in plant bed areas as the plans designate . Allow a minimum of 10 days between the application and seeding or digging. The engineer ma y require mowing the areas before treating, or may vary the above requirements to obtain the best results if in the engineer’s judgment temperature, rainfall, and other conditions warrant this action. The contractor may use the herbicide to control or destroy weeds and gras ses in other mulched areas at the contractor’s discretion with the engineer’s approval. 632.3.11 Selective Pre-Emergence Herbicide

(1)Apply selective pre-emergence herbicide, if specified, accordi ng to manufacturer’s instructions for

surface application to plant bed areas the plans show just befo re applying the mulch. 632.3.12 Wrapping

(1)If wrapping is specified, wrap the tree trunks with wrapping m aterial overlapping 1 1/2 inches, wound

from the ground line to the lowes t main branches. Secure the wr apping in at least 3 places, including the top, middle, and bottom, with a biodegradable tie or tape. Wrapping plants as soon as practicable after planting. 632.3.13 Rodent Protection

(1)If required, apply the materials specified in 632.2.8 for rodent protection to the plants. Place rodent

protection material around each tree trunk, with the bottom of the material resting on the soil surface, and the top a minimum of 4 feet above the surrounding earth sur face, or up to the lowest branches on small trees. Wrap the rodent pro tection loosely around the tree trunk and staple to itself with 3 rows of staples. Space the staples within each row at maximum 6 inch in tervals along the seam. 632.3.14 Bracing

(1)If specified, brace trees with a stake driven into the ground near the base of the tree to a depth of 2 or

3 feet, or until sufficiently solid to support the tree. Stakes shall extend upward to about 6 inches below the lowest main branches. Fast en the tree to the stake using a soft rope or strap in a way that avoids injuring the tree. Allow 1 to 3 i nches of movement by the trunk . 632.3.15 Guying

(1)If specified, guy the trees with 3 wires whose upper ends are attached to soft ropes or straps that

encircle the tree trunk, just abov e the lowest main branches of deciduous trees and at a point above the ground line of 2/3 the heigh t of evergreen trees. Anchor th e lower ends to stakes set in the ground around the tree, equal distance apart and at a distance from th e tree of approximately 3/4 the distance from the ground to t he upper point of fastening. Notch the anch or stakes to prevent the wire from slipping and drive them into the ground, at a slight angle away from the tree, to a dept h of 18 inches or more until solid. Stakes shall extend 3 inches above the ground .

(2)Draw the wires taut to equal t ension by twisting or using turn buckles, and fasten securely, with the

trunk of the tree remaining in a vertical position. Allow 1 to 3 inches of movement by the trunk. 632.3.16 Disposal of Excess and Waste Material

(1)Remove and dispose of all exce ss excavation, waste materials, or other debris.

632.3.17 Weed Barrier Fabric

(1)Place geotextile on areas the plans show or the engineer desig nates before placing the mulch. Lay the

fabric flat on the smoothed soil and fit as close to the plants as possible. Provide a 4-inch overlap at adjoining sheets. On all slopes, s ecure the fabric with T-shape d steel pin anchors sufficiently long to prevent the fabric from moving. 632.3.18 Establishing an d Replacing Plants 632.3.18.1 Plant Establishment Period 632.3.18.1.1 General

(1)A plant establishment period of 2 years shall follow the compl etion of planting, unless the special

provisions specify a one-year period. 632.3.18.1.2 Two Growing Season Plant Establishment Period

(1)The plant establishment period shall extend until October 15 o f the second full growing season.

Effective with the December 2018 Letting 410 2019 Standard Spec ifications 632.3.18.1.3 One Growing Season Plant Establishment Period

(1)The plant establishment period for material planted in the spring shall extend unt il October 15 of the

same year. If planting in the fa ll, extend this period until Oc tober 15 of the succeeding year. 632.3.19 Landscape Planting Surveillance and Care 632.3.19.1 General

(1)Properly care for all plants fr om the time of planting until f inal acceptance of the work.
(2)Proper care of plants consists of watering, weeding, cultivati ng, pruning, spraying, tightening braces

and guys, retying wrapping, re-mu lching, and other work necessa ry to keep the plants in a neat appearance and healthy growing condition. Between May 15 and Oc tober 15, in addition to watering required for planting under 632.3.7 , water completely at a 10-day to 14-day interval defined as a care cycle. Care cycle length can be extended beyond 14 days if weat her and soil moisture conditions allow. The engineer may order additional watering at any time d uring the plant establishment period if conditions require.

(3)Water each plant hole sufficiently at each watering to keep th e topsoil backfill material in a moist

condition and to keep the plant in a healthy growing condition.

(4)Remove and dispose of all evergreens and deciduous trees that die during the course of the plant

establishment period as their dead condition becomes evident.

(5)Keep all mulched areas free of a ll vegetation, except the specified plants, by hoeing, hand weeding, or

by using herbicides if the engineer approves.

(6)String all vines to fences and direct runners toward retaining walls or structures during the plant

establishment period.

(7)Apply pesticides as required to c ontrol insects and diseases a nd to keep the plants in a healthy

condition.

(8)Replace all plants that die or sh ow evidence of dying during t he plant establishment period at the

earliest appropriate planting ti me after this condition becomes apparent. The engineer will allow replacements until June 1 of the year in which making the final inspection.

(9)Remove and dispose of all braci ng and guying materials after the final inspection of the plantings.
(10)Provide one person, called the care specialist, responsible fo r inspecting and performing the required

care. Also provide other pers onnel, vehicles, equipment, tools, and materials needed to accomplish the inspection and care. Have the care specialist do the following:

1.Perform care requirements to the satisfaction of the engineer a minimum of once every two weeks.
2.Notify the engineer at least two days before the beginning of each care cycle.
3.Submit a written report to t he engineer after each care cycle. Ensure that the report documents the work

performed during the care cycle; the number, type, and location of each plant that was removed or marginal; and other inf ormation the engineer or the specialist deems appropriate. 632.3.19.2 Damages for Failing to Perform

(1)If the care specialist fails to perform any of the required ca re cycles as specified 632.3.19.1 , the

department will assess daily damages in an amoun t the special p rovisions specify to cover the cost of performing the work with other forces. The department will asse ss these damages for each day the requirements of the care cycle r emain incomplete, except when the engineer extends the required time period. 632.3.20 Acceptance or Replacement of Plant Material

(1)Near the end of the applicable plant establishment period, but not later than September 15, the

engineer will make final inspecti on of the planting and approve only those plants in a healthy growing condition and conforming to the following minimum requirements: - Plant sizes and standards shall adhere to the American Standa rds for Nursery Stock. - All plants are the species specified unless the engineer appr oves changes. Conform to 632.3.19 , for proper care of plants. - Deciduous trees shall exceed the minimum size of the specifie d size range and shall have fully matured, average-sized, health y leaves distributed throughout the branch system as is typica l of the species. - Deciduous shrubs shall exceed the requirements of the specified size range and have mature, average- sized leaves typically distributed throughout the branch system . - Deciduous vines shall have the required number of runners, ea ch exceeding the minimum required length. - Evergreens shall exceed the minimum size of the specified siz e range and all coni ferous types shall have fully developed, mature needles , and average-sized buds on curr ent season’s growth.

Effective with the December 2018 Letting 411 2019 Standard Spec ifications (2) Remove and replace plants not conforming to the above requirements with satisfactory plants during the current fall planting season or, the engineer may allow the m to remain in place. Use the same materials and method of replacement planting specified for the original planting.

(3)Replacing plant materials shall not extend the plant establishment period.

632.3.21 Contract Time

(1)The department will not charge c ontract time during the plant establishment period or when making

replacements, unless other contra ct operations are in progress during the same period.

632.4Measurement

(1)The department will measure the Trees, Shrubs, and Vines bid i tems by the number of plants of each

species, variety, and size acceptably completed.

(2)The department will measure Land scape Planting Surveillance an d Care Cycles as each individual

care cycle acceptably completed.

632.5Payment

632.5.1 General

(1)The department will pay for measured quantities at the contrac t unit price under the following bid

items: ITEM NUMBER DESCRIPTION UNIT

632.0101 Trees (species, root, size) EACH

632.0201 Shrubs (species, root, size) EACH

632.0301 Vines (species, root, size) EACH

632.9101 Landscape Planting Surveillance and Care Cycles EACH

(2)Payment for the Trees, Shrubs, a nd Vines bid items is full com pensation for providing, transporting,

handling, storing, pruning, placing, and replacing plant materials; for excavating all plant holes, salvaging topsoil, mixing, and backfilling; for providing and applying all required fertilizer, weed barrier fabric, mulch, water, wrapping, guys and braces, rodent protection, herbicides and anti-desiccant spray; for removing guys and braces; and for disposing of all e xcess and waste materials. Payment for the Topsoil bid item used in p lanting will be as specified in 625. The department will pay for substituting larger plants, if allowed under 632.2.2.4 , at the contract price fo r the specified size.

(3)Payment for Landscape Planting Surveillance and Care Cycles is full compensation for all the work

required under this bid item. T he department will assess damages under the Failing to Perform Landscape Surveillance administrative item for failing to perfo rm the required surveillance and care as specified in 632.3.19.2 . 632.5.2 Payment Schedule

(1)The department will pay the cont ract value of the work to the contractor according to the following

schedule:

1.Each time an item or portion of an item is acceptably compl eted, except for care as specified in 632.3.19 ,

the department will pa y 65 percent of the contract value of the work for contracts c ontaining a 2 growing season plant establishment period; and the department will pay for 80 percent of the contract value of the work for contracts containing a one growing season plant establ ishment period.

2.For contracts with a 2 gro wing season establishment period, each time an item o r portion of an item

acceptably completes one growin g season, inclu ding care, and is satisfactory otherwise, the department will pay an additional 15 perce nt of the contract value of the work. If an item or portion of an item completes the second g rowing season, includi ng care, and is sat isfactory otherwise, the department will pay the final 20 percent of the contract value of this work.

3.For contracts with a one growing season establishment perio d, each time an item o r portion of an item

completes the growing season, including care, and is satisfacto ry otherwise, the department will pay the final 20 percent of the cont ract value of this work.

(2)The department will make final payments upon final acceptance and completion of all work required

under the contract. 632.5.3 Reduced Payment

(1)The department will pay for plants that do not conform to 632.3.20 but that the engineer allows to

remain in place, at 65 percent o f the contract unit price for c ontracts containing a 2 growing season plant establishment period, and at 80 percent of the contract u nit price for contracts containing a one growing season plant establishment period.

Effective with the December 2018 Letting 412 2019 Standard Spec ifications Section 633 Delineators and Markers

633.1Description

(1)This section describes providi ng roadway delineators and marke rs including culvert makers and right-

of-way markers.

633.2Materials

633.2.1 Steel Posts

(1)Furnish a flanged channel section post weighing 1.12 pounds pe r linear foot or more before zinc

coating, and made of steel with the following properties: Minimum tensil e strength ...................................... ............................................................... ....................... 50 ksi Minimum tensile yield st rength ................................ ............................................................... .................... 36 ksi Minimum elongation ............................................................... ........................................... 5.0 percent in 2 in ches

(2)Furnish posts the length, and with mounting holes the size and spacing the plans show. Ensure the

posts are symmetrical, well rolled, and free from defects that impair their strength or appearance.

(3)Hot-dip zinc coat the posts afte r completing forming, cutting, and punching or drilling. Perform zinc

coating according to ASTM A123. 633.2.2 Flexible Delineators and Markers

(1)Furnish flexible delineators or markers from the department's APL for the application the bid item

indicates. If the contract requires reflective sheeting, furnis h posts with shop-applied reboundable type H reflective sheeting from the department's APL and of the size plan details show. 633.2.3 Hardware

(1)Furnish galvanized steel soil anchors, nuts, bolts, washers, a nd other metal parts unless the contract

specifies otherwise. 633.2.4 Delineator Brackets

(1)Furnish aluminum for surface-mounted delineators conforming to ASTM B221, alloy 6061-T6 with type

SH reflective sheeting from the department's APL . Furnish stainless steel st ud bolts, self-locking nuts, and washers conforming to 513.2.1 . 633.2.5 Delineator Reflectors

(1)Fabricate reflectors as the plans show using sheet aluminum co nforming to 637.2.1.3 covered with

type SH reflective sheeting from the department's APL. 633.2.6 Right-of-Way Marker Plaques

(1)Use department-furnished R/W ma rker plaques and survey marker informative plaques.

633.3Construction 633.3.1 General

(1)Erect posts to a true vertical position and at the locations t he plans show.
(2)Install flexible delineators and markers conforming to manufac turer's recommendations for the

application the bid item indicates unless the plans show otherw ise. Ensure that the curved side of single curvature posts has the required marking and faces traff ic.

(3)Install steel posts by drivi ng using equipment that does not d amage the post. Replace posts bent or

otherwise damaged by con tractor operations. 633.3.2 Delineators

(1)Install steel delineator posts to support delineator reflectors. Use aluminum delineator brackets on

concrete barriers or other structures. Set posts and brackets i n the locations and at the offsets the plans show or the engineer directs.

(2)Attach each reflector securely to the supporting steel post.

633.3.3 Temporary Delineators

(1)Provide temporary delineators conforming to the requirements for permanent installations except, if

the engineer approves, the contractor may furnish serviceable u sed posts. Maintain during construction by replacing damaged materials. Remove and dispose of temporary delineators when no longer needed.

(2)Upon contract completion, tem porary delineator components beco me the contractor's property.
Source: Wisconsin Standard Specifications for Highway and Structure Construction, 2019 Edition. Pages 412420 of 601.