Effective with the December 2018 Letting 71 2019 Standard Speci fications Section 201 Clearing and Grubbing
201.1Description
occurring within the clearing lim its; and removing and disposin g of roots, stumps, stubs, logs, and other timber occurring within the grubbing limits. 201.2 (Vacant)
201.3Construction
embankments, channels, ditches, borrow pits, and marsh or waste disposal areas.
or waste disposal.
- Areas designated for occupation by earth embankments 6 feet o r more in height. - Areas used for marsh excavation disposal for which the State has obtained easements.
dispose of other trees, brush, shrubs, or other vegetation occu rring within the clearing limits. Within the grubbing limits, remove debris no t suitable for the roadway fou ndation, stumps and associated roots, logs, timber, brush, and matted roots to the following minimum depths:
authorizes their removal. If clearing where grubbing is not req uired, cut shrubs and brush to within 3 inches of the ground surface. Cut trees as nearly flush with th e ground surface as practicable with tools ordinarily used for these operations.
September 30 by healthy oak trees and saplings with a thorough application of tree paint immediately upon discovering a wound. Betw een these dates, also paint the c ut surfaces of the stumps of healthy oak trees and saplings immediatel y after cutting, whether remai ning in place or grubbed.
traffic or injury to other trees , structures, or property, cut them into sections from the top down.
limbs or branches of trees left i n place and ov erhanging the roadbed to at least 20 feet above the finished grade. Trim using generally accepted horticultural pra ctices.
clearing of right-of-way acquired by the highway authority in f ee simple title, or from clearing of trees acquired by and for the public i n the acquisition of easement of the right-of-way. Set aside logs and timber greater than 4 inches in diameter to the extent feasible for commercial or f uel use. Do not burn or bury this material on the ri ght-of-way or lands adjacent to the right-of-way wit hout first making it available for commercial or fuel use. If it is not possible to dispose of this material for commercial or fuel use, dispose of the salvaged lo gs as specified for waste l ogs in 201.3(10) .
easement or by use have a prio r right to all timber from trees standing or lying, except timber required for construction of the work, and except timber from trees acquired by and for the public in the acquisition of the right-of-way . Consult with the private owners about disposing of trees cut on their land. Remove from the right-of -way and dispose of trees, or portions of trees, claimed by the owners. Ensure that timber disposal sites are neatly constructed.
and grubbing or occurring within the clearing and grubbing limits by burning, chipping, burying, or removing from the right-of-way.
trees or shrubs left in place, c reate a nuisance, pose a hazard to traffic, or damage public or private property. Take care to avoid bur ning poison oak, poison ivy, po ison sumac or other materials posing a health hazard when burned. Obtain burning permits required under local and state fire protection
Effective with the December 2018 Letting 72 2019 Standard Speci fications regulations and provide copies to the engineer before burning. Comply with WDNR rule NR 429 regulating open burning that pr ohibits open burning in the Sout heast Wisconsin Intr astate Air Quality Control Region (Kenosha, Milwaukee, Ozaukee, Racine, Walworth, Washington, and Waukesha counties). Do not use oily substa nces or other materials prohib ited under NR 429 to start or maintain fires. http://docs.legis.wisconsin.gov /code/admin_code/nr/400/429.pdf
engineer-approved locations on the right-of-way outside the con struction limits. Min imize the bulk of the material and cover it with at least one foot of earth. If the engineer approves, the contractor may dispose of the debris from open burning in this same manner.
and use this material as specified for mulch under 627, dispose of it off the right-of-way, or bury it as specified in 201.3(11) .
Obtain written permits for this disposal from the owner of the property where placing the material, unless disposing of this material at a licensed waste disposal operation. Provide copies of permits to the engineer before disposal begins.
stubs, branches, or windfalls w ith adhering bark, and elm bark and debris within clearing and grubbing limits or resulting from clearing and grubbing operations.
and chip, burn, or bury the bark. For clearing and grubbing operations performed between April 1 and September 30, perform final dispo sal of elm wood, bark, or debr is within 30 days. For clearing and grubbing operations performed bet ween October 1 and March 31, p erform final disposal of elm wood, bark, or debris before the succeeding May 1.
intends to burn debris but canno t secure burning permits on schedule, do not delay removing clearing debris from areas affected by other operations. While waiting t o secure burning permits, pile clearing and grubbing debris beyond the limits affected by other work. D o not leave elm debris beyond the limits specified in 201.3(15) .
201.4Measurement
201.4.1 General
square yard, or acre as the contract indicates.
ditches, occurring outside the limits of the roadway clearing and grubbing. If measured by the station, the department will measure along the center line of these channels and ditches.
right-of-way and on easements fu rnished by the State. If measured by the station, the department will measure along the roadway centerline.
work as follows:
or mowing machine.
structure that the contractor can remove with a rooter.
201.4.2 By the Station
measured along the roadway center line or reference line with ea ch full 100-foot station starting and ending at a +00 station. If 2 or more roadways occur, the depar tment will measure along the centerline or reference line of each roadw ay. For divided highways, the de partment will extend measurement units for each roadway, in width , from 5 feet outside the grading limit of that roadway to a line mid-way between the reference lines or centerlines for each roadway.
Effective with the December 2018 Letting 73 2019 Standard Speci fications (2) The department will only include st ations with a total of 12 i nches or more of diameter determined as specified under 201.4.5 . The department will include each station conforming to this c riterion as a full station. 201.4.3 By the Square Yard
the designated limits. The department will calculate the horizontal area bounded by the line of trunks cut or grubbed. The department w ill not measure outside the rig ht-of-way limits or acquired easements. The department will incl ude only areas containing tr ees or stumps with a 3-inch or greater diameter. The department will determine diameters as specified under 201.4.5. 201.4.4 By the Acre
designated limits. The departmen t will calculate the horizontal area bounded by the line of trunks cut or grubbed. The department will not measure outside the right-of-way limits or acquired easements. The department will measure separate areas or isolated stands of less than 1/5 acre as 1/5 acre. The department will include only areas containing trees or stumps w ith a 3-inch or greater diameter. The department will determine diameters as specified under 201.4.5 . 201.4.5 By the Inch of Diameter
The department will determine tree diameter by measuring the ci rcumference approximately 4 1/2 feet above the existing ground level, but above the ground swell, an d dividing by 3. The department will determine stump diameter, for stumps not resulting from the con tractor's clearing operations, by computing the average diameter of the stump top. The department will include only those in-place trees or stumps with a 3-inch o r greater diameter. The department will round circumference measurements and diameters to the nearest inch.
201.5Payment
items: ITEM NUMBER DESCRIPTION UNIT
201.0105 Clearing STA
10 Clearing SY
15 Clearing ACRE
20 Clearing ID
201.0205 Grubbing STA
10 Grubbing SY
15 Grubbing ACRE
20 Grubbing ID
- Clearing and grubbing required under this section and performed within the clearing and grubbing limits, as defined in 201.3(1) . - Handling, hauling, p iling, burning, bur ying, trimming, chippi ng, wound treatment, rehan dling, and disposing of waste and debris. - Excavations made to bury clearing and grubbing material, backfilling these excavati ons, and disposing of excess excavated material.
grubbing limits, as defined in 201.3(1) , at the contract unit price per square yard, acre, or inch of diameter. If the contract does not contain Clearing and Grubbin g bid items using those units, the department will pay for this additi onal clearing and grubbing a s extra work.
of 205 or to other con tract bid items.
Effective with the December 2018 Letting 74 2019 Standard Speci fications Section 202 Roadside Clearing
202.1Description
removing and disposing of windfalls, logs, uprooted stumps, and rubbish; and trimming of selected trees and saplings to be saved; all within the right-of-way lim its but outside the clearing limits defined in 201.3 . 202.2 (Vacant)
202.3Construction
special provisions indicate. If no limits are indicated, perfor m roadside clearing on areas of the right-of- way outside the clearing limits.
beautification purposes unless t he engineer directs otherwise. Do not injure or damage trees and saplings designated for preservation. Remove the dead material and lower branches of preserved trees as directed, to promote uniformity and proper development of shape and appearance. Trim using generally accepted hortic ultural practices.
surface as reasonably possible wit h tools ordinarily used for t hese operations. Avoid harming trees and saplings designated for preservation when felling undesirable trees. If unable to fell trees due to danger to traffic or injury to ot her trees, structures, or prop erty, then cut them into sections from the top down.
of stumps of these trees as spe cified for preventing oak wilt u nder 201.3(4) .
the right-of-way included under r oadside clearing operations.
clearing as specified in 201.3 .
202.4Measurement
202.4.1 By the Station
measured along the roadway center line or reference line with ea ch full 100-foot station starting and ending at a +00 station. If 2 or more roadways occur, the depar tment will measure along the centerline or reference line of each roadway.
department will include each stati on conforming to these criteria as a full station. 202.4.2 By the Square Yard
designated limits as calculated from horizontal measurements. The department will not measure outside the right-of-way limi ts or acquired easements. 202.4.3 By the Acre
designated limits as calculated from horizontal measurements. The department will not measure outside the right-of-way limits o r acquired easements. The department will measure separate areas or isolated stands of less th an 1/5 acre as 1/5 acre.
202.5Payment
items: ITEM NUMBER DESCRIPTION UNIT
202.0105 Roadside Clearing STA
10 Roadside Clearing SY
15 Roadside Clearing ACRE
treatment, and disposal of waste vegetation.