Effective with the December 2018 Letting 101 2019 Standard Spec ifications Section 208 Borrow
208.1Description
earthwork summary the plans show for borro w. If the contract specifies moving material from one division to another, that material is not borrow.
208.2Materials
208.2.1 Quality
soil, stone, gravel, or other acc eptable materials, of a charac ter and quality satisfactory for the purpose intended. Use material free from sod, stumps, logs, and other p erishable and deleterious matter.
contract. 208.2.2 Source
4.1Material from within the right-of-way limits but outside e xcavation limits that the contract does not
already designate as excavation.
4.2Surplus excavation from other contracts.
4.3Material from old road fills, removed as specified in 214.
items to reduce the quantity of borrow required in that divisio n.
from whom the contractor proposes to obtain borrow material.
create or enlarge an area of open water if the contractor submi ts a written request. Include with that request written evidence that the following conditions are met:
water and that plan complies with all applicable ordinances or regulations.
department's bureau of aeronautics have been contacted and conf irm receipt of the following: - Contractor and landowner names and contact information including phone numbers. - Scale map showing the locati on of the proposed site in relati on to the airport. - Detailed reclamation plans showing the location, size, and ou tline of proposed new open water; slopes of the impoundment area; proposed re-vegetation plan; an d other requested information.
208.3Construction
excavation. Remove sod or other p erishable or unsuitable material from the proposed borrow source area. Excavate borrow sites in a way that allows the engineer t o accurately measure the material excavated and incorporated in the work.
specified in 205.3.12 .
in borrow site areas as specified in 201.3 .
overlying the borrow site. Stock pile the topsoil in sufficient quantities to cover all surfaces of excavated areas from 4 to 6 inches deep . If the topsoil overlying the bor row site is less than 4 inches deep, replace the topsoil to the original depth. After trimming and finishing the site, spread the salvaged
Effective with the December 2018 Letting 102 2019 Standard Spec ifications material uniformly over excavated areas of the borrow site, unl ess the engineer authorizes otherwise in writing.
as follows:
630.3.3.4 .
this, it shall obtain the engineer’s written approval covering the quality and sources of the proposed material and the proposed construction methods before proceeding.
208.4Measurement
208.4.1 General
Except when the contract specif ies otherwise, the department will not measure material obtained under other contract bid items a s borrow. Borrow measurement ex cludes material from sources that include but are not limited to the following:
208.4.2 Measurement in Original Position
location. The department will com pute this volume by the method of average end areas, with no correction for curvature, or if the engineer elects, by the met hod of truncated pris ms. The engineer and contractor may agree to an alternate calculation method.
engineer has time to accurately measure the borrow source. The department will not measure sod or other unsuitable material removed, or material salvaged from bo rrow sources and used for covering surfaces of the excavated areas within the borrow source. The e ngineer may require the contractor to remove topsoil or other unsuitable materials from the surface o f the borrow area before taking original cross-sections of the source ar ea and, upon completing the exca vation, to smooth or trim the site, as required, to allow taking accurate final measurements of the ar ea before replacing the topsoil. The department will not measure any material excavated before the engineer staked out and cross- sectioned the borrow source, and material excavated in excess o f that required for, or not incorporated in the work. 208.4.3 Measurement in Vehicles
measure all or part of the Borrow or Select Borrow bid item by the cubic yard in the vehicle. The engineer will determine the capacity of each vehicle used for h auling the material to the nearest 1/10 cubic yard and adjust for material expansion in the vehicle. 208.4.4 Measurement in Final Position
the department will measure Borrow or Select Borrow by the cubic yard of compacted embankment acceptably completed, measured by the method of average end are as, with no correction for curvature. The department will determine the end areas from pre construction cross-sections of the area being covered by the proposed embankment and from cross-se ctions of the completed work. The department will not make allowances for shrinkage, subsidence, lateral movement of the material, or for material in excess of that required for work the plans show or the engineer orders.
208.5Payment
items: ITEM NUMBER DESCRIPTION UNIT
208.0100 Borrow CY
208.1100 Select Borrow CY
grubbing, excavating, sloping, s haping, trimming, loading, hauling, placing; compacting; disposing of
Effective with the December 2018 Letting 103 2019 Standard Spec ifications surplus and unsuitable material; and for salvaging, stockpiling , rehandling, and spreading salvaged material for covering the surfaces of excavated areas within bo rrow sites.
project excavation limits, furnished under 208.2.2 , at a price determined under 109.4 .
bid item, the department will pays eparately for compaction and dust control water under 624.5 .
areas separately as specified fo r borrow sites and material dis posal sites under 628.5.1 .
Effective with the December 2018 Letting 104 2019 Standard Spec ifications Section 209 Granular Backfill
209.1Description
as follows:
209.2Materials
209.2.1 General
particles or sand-sized particles mixed with gravel, crushed gr avel, or crushed stone. Do not use crushed concrete or reclaimed asphalt.
than or equal to 6. The contractor may substitute grade 1 for grade 2 material. 209.2.2 Gradation
- For the entire sample, conform to the following gradation lim its: PERCENT PASSING BY WEIGHT SIEVE GRADE 1 GRADE 2 6-inch 100 100 3-inch 85 - 100 85 - 100 No. 4 25 - 100 25 - 100 - For the portion of the sample passing the No. 4 sieve, confor m to the following gradation limits: PERCENT PASSING BY WEIGHT SIEVE GRADE 1 GRADE 2 No. 4 100 100 No. 40 0 - 75 ___ No. 100 0 - 15 0 - 30 No. 200 0 - 8.0 0 - 15.0 209.2.3 Sampling and Testing
Sampling[1] ............................................................................................................................. ........... AASHTO T2 Percent passing t he 200 sieve ................................. ............................................................... ........ AASHTO T11 Gradation[1] ............................................................................................................................. ........ AASHTO T27 Liquid l imit .................................................. ............................................................... ...................... AASHT O T89 Plasticity index and plastic limit ............................ ............................................................... ........... AASHTO T90 [1] As modified in CMM 8-60. 209.2.4 Source
responsible for negotiating with property owners to obtain gran ular material.
material disposal under 104.9 and 208.3 .
passing the No. 200 sieve before excavating the granular material.
after removing overburden and bef ore removing granular material to allow taking accurate measurements. After removing the required quantity of granular material, repeat trimming and shaping of the areas to allow taking accurate measurements.
are neatly constructed.