Effective with the December 2018 Letting 114 2019 Standard Spec ifications Section 214 Obliterating Old Road
214.1Description
scarifying or plowing areas of the old roadway. The work under this section applies only to those portions of the old roadway, des ignated for obliteration, located outside the slope limits of the grading for the new roadway. 214.2 (Vacant)
214.3Construction
of the new construction as require d, to obliterate the old road way.
obliterate the old road. Remove and dispose of or salvage misce llaneous structures from within the limits designated for obliteration. Topsoil, fertilize, and seed the area within the limits designated for obliteration.
approximately restore the original contour of the ground or to produce a contour that merges with the contour of the adjoining land. If possible, place waste materia l from the new construction in cuts on the old road. If the engineer allows, i n writing, the contractor ma y obtain borrow or sel ect borrow required for the new construction from fills on the old road.
provision for disposal is included in the contract, as specifie d for their removal under 203, except, leave no parts of the structures within 2 feet of the finished surface.
disposal in the contract, and that occur within 2 feet of the p roposed finished surface into pieces no larger than one square foot befor e covering. Break down and rem ove pavements, curb, gutter, and similar rigid structures if occ urring within one foot of the pr oposed finished surface as specified for removing or abandoning miscellaneous structures under 204.
less than one foot, that have no separate contract provision fo r salvage or disposal, , to effectively mix the material with soil. If possibl e, blade the surfacing material into the old ditches and cover with suitable soil.
roadway and drainage excavation under 205. Place stones larger than 6 inches at least 6 inches below the proposed finished sur face. If the obliterated area is suitable for cultivation keep stone to a reasonable minimum in the upper 18 inches of completed embankme nt and place no structure or pavement concrete or other debris within 2 feet of the finished grade.
road the plans designate, the co ntract specifies, or the engineer directs. After completing necessary topsoiling, harrow, smooth, fe rtilize, and seed the entire area of the obliterated old roadway as specified for fertilizer and seeding in 629 and 630, unless the engineer approves otherwise.
damage, and place in neat piles on the right-of-way at locations the engineer designates.
214.4Measurement
the nearest 1/10 station along t he old road centerline or reference line of those portions of the old roadway, designated for obliteration, located outside the slope limits of the grading for the new roadway. The department will excl ude areas of the old road from which the contractor has obtained material under the Borrow or Select Borrow bid items. 214.5 Payment
item: ITEM NUMBER DESCRIPTION UNIT
214.0100 Obliterating Old Road STA
removing non-rigid pavement surfa cing; and for the other work r equired under this section except as follows:
Effective with the December 2018 Letting 115 2019 Standard Spec ifications 1. The department will pay separ ately for clearing and grubbin g under the Clearing and Grubbing bid items as specified in 201.5 .
lying partly within the lateral grading limits of the new const ruction under the Exca vation bid items as specified in 205.5 .
roadway, if obtained from the ol d road, under the Borrow or Select Borrow bid items as specified in 208.5 .
old road and used in the constr uction of the new road, as calle d for on the plans or ordered, separately.
concrete pavement, brick pavemen t, and rigid base, from within the limits designated for obliteration, under the Removing Pavement bid item as specified in 204.5 .
limits designated for obliteration, the depar tment will pay sep arately for these removals under the 204 bid items specified under 204.5 .
in 203.5 .
specified in 625.5 .
Effective with the December 2018 Letting 116 2019 Standard Spec ifications Part 3 Bases, Subbases, and Subgrade Aggregates
Effective with the December 2018 Letting 117 2019 Standard Spec ifications Section 301 Base, Subbase, and Subgrade Aggregate
301.1Description
additional requirements are specified in those sections.
301.2Materials
301.2.1 General
301.2.2 Definitions
Aggregate A composite mixture o f hard, durable mineral materials that ha ve been mechanically processed. Breaker run Aggregate resulting from the mechanical crushing of quarrieds tone or concrete not screened or proce ssed after primary crushing. Crushed gravel Crushed angular particles of gravel retained on a No. 10 sieve. Crushed stone Crushed angular particles of quarried rock retained on a No. 1 0 sieve. Fractured face An angular, rough, or broken parti cle surface with sharp edges . Gravel Naturally occurring rounded part icles of rock that will be ret ained on a No. 10 sieve. Pit run Unprocessed aggregate, with pred ominately 1 1/2- inch or larger sized particles, obtained from a gravel pit. Natural material Material that is excavated, mined, quarried, or originates fro m a pit or quarry; reclaimed asphalt or crushed concrete are not natura l materials within part 3. Reclaimed asphalt Crushed or processed asphaltic pavement or surfacing Reprocessed material Waste material for which a commercially demonstrated process uses the material as a raw material. Sand Granular material having at lea st 90 percent passing the No. 4 sieve and predominantly retained on the No. 200 sieve. Select crushed material Crushed and screened aggregate with particles predominately la rger than 1 1/2 inches. Virgin materials Mineral materials in a native o r raw form, not previously-used . 301.2.3 Sampling and Testing
Sampling[1] ............................................................................................................................. ........... AASHTO T2 Percent passing t he 200 sieve ................................. ............................................................... ........ AASHTO T11 Gradation[1] ............................................................................................................................. ........ AASHTO T27 Gradation of extra cted aggr egate .............................. ............................................................... ...... AASHTO T30 Moisture content[1] .............................................................. .......................................................... AASH TO T255 Liquid l imit .................................................. ............................................................... ...................... AASHT O T89 Plasticity index .............................................. ............................................................... ................... AASHTO T90 Wear .......................................................... ............................................................... ...................... AASHT O T96 Sodium sulfate soundness (R-4, 5 cycles) ............................................................... ..................... AASHT O T104 Freeze/thaw soundness ............................................................... ................................................. AASHT O T103 Deleterious materials ......................................... ............................................................... ............ AASHT O T113 Fracture ...................................................... ............................................ ASTM D5821 as modified in CMM 8-60 Moisture/density[1] .............................................................. ............................. AASHT O T99 and AASHTO T180 In-place density[1] .............................................................. ............................................................ AA SHTO T191 Asphaltic materia l extraction ................................. ................................... CMM 8-36 WisDOT Test Method 1560 [1] As modified in CMM chapter 8 .
contractor will jointly obtain the sample. The sampler must be HTCP certified to sample aggregates. Do not place base until the engi neer tests and approves the mat erial, except as allowed in 106.1 .