Effective with the December 2018 Letting 112 2019 Standard Spec ifications Section 213 Finishing Roadway
213.1Description
contract, cleaning out material deposited in existing structures as a result of construction operations, removing and disposing of litter and debris, and final trimming and dressing required to neatly and satisfactorily restore and comp lete the entire roadway for any project or portion o f a project where grading and drainage or structures are a part of the contract.
the final shaping, finishing, tr imming and dressing of shoulders, shoulder slopes and other portions of the roadway disturbed by contractor operations, on contracts for constructing base, or surface course, on any project or portions of a p roject where grading and roadw ay construction was or will be substantially completed under other contracts. 213.2 (Vacant)
213.3Construction
for damage caused by its operations to the seeded areas or the vegetative covering within the right-of- way. Replace topsoil that was lost or contaminated with other m aterials, and reseed or restore areas damaged by the contract or’s operations.
equipment, supplemented by hand work , if necessary, to produce smooth surfaces and slopes and uniform cross-sections. For graded roadbed without surfacing, t rim and dress the entire roadbed in the same manner.
roadway and ground surface with in areas of the clearing and gru bbing limits.
one-inch sieve from topsoiled areas.
by other means and prevent the weed plants from maturing to the bloom or flower stage. The term “noxious weeds” as defined her e consists of Canada thistle, lea fy spurge, field bindweed, and other weeds that the governi ng body of the county or municipality whe re the project is located declares noxious, according to section 66. 0407, Noxious Weeds, of the Wi sconsin statutes. http://docs.legis.wi.gov /statutes/statutes/66
soil, silt, or debris, and fully r estore the waterways of drain age installations and structures constructed under the contract. Remove materials deposited or lodged in the waterways of other drainage installations or structures d ue to contractor’s operations.
established or specified lines and grades. Clear ditches and ch annels of debris and obstructions, and trim slopes and beds to true line and grade. Remove, shape, tri m, and leave in a neat condition excess earth, debris, spoil banks, o r other waste material next to culverts, bridges, ditches, channels, poles, posts, trees, or other objects. Remove stones, roots, or other waste mater ials exposed on embankment or excavation slopes t hat may become loosened and di slodged. Dispose of slash and debris from clearing and grubbing operations, and leave the ent ire roadway in a neat condition. Fill holes and depressions that appear o n the surface within the grubbing limits, caused by grubbing operations, with suitable material.
213.4Measurement
213.5Payment
item: ITEM NUMBER DESCRIPTION UNIT
213.0100 Finishing Roadway (project) EACH
Payment includes restoring areas, seeded under a previous contr act, damaged by the contractor’s operations.
Effective with the December 2018 Letting 113 2019 Standard Spec ifications (3) The department will pay separately for additional material fro m excavation required and furnished incidental to the repair of wash outs under pertinent contract b id items or as extra work.
section is incidental to the gradi ng, subbase, base, structures , or surface course bid items.
Effective with the December 2018 Letting 114 2019 Standard Spec ifications Section 214 Obliterating Old Road
214.1Description
scarifying or plowing areas of the old roadway. The work under this section applies only to those portions of the old roadway, des ignated for obliteration, located outside the slope limits of the grading for the new roadway. 214.2 (Vacant)
214.3Construction
of the new construction as require d, to obliterate the old road way.
obliterate the old road. Remove and dispose of or salvage misce llaneous structures from within the limits designated for obliteration. Topsoil, fertilize, and seed the area within the limits designated for obliteration.
approximately restore the original contour of the ground or to produce a contour that merges with the contour of the adjoining land. If possible, place waste materia l from the new construction in cuts on the old road. If the engineer allows, i n writing, the contractor ma y obtain borrow or sel ect borrow required for the new construction from fills on the old road.
provision for disposal is included in the contract, as specifie d for their removal under 203, except, leave no parts of the structures within 2 feet of the finished surface.
disposal in the contract, and that occur within 2 feet of the p roposed finished surface into pieces no larger than one square foot befor e covering. Break down and rem ove pavements, curb, gutter, and similar rigid structures if occ urring within one foot of the pr oposed finished surface as specified for removing or abandoning miscellaneous structures under 204.
less than one foot, that have no separate contract provision fo r salvage or disposal, , to effectively mix the material with soil. If possibl e, blade the surfacing material into the old ditches and cover with suitable soil.
roadway and drainage excavation under 205. Place stones larger than 6 inches at least 6 inches below the proposed finished sur face. If the obliterated area is suitable for cultivation keep stone to a reasonable minimum in the upper 18 inches of completed embankme nt and place no structure or pavement concrete or other debris within 2 feet of the finished grade.
road the plans designate, the co ntract specifies, or the engineer directs. After completing necessary topsoiling, harrow, smooth, fe rtilize, and seed the entire area of the obliterated old roadway as specified for fertilizer and seeding in 629 and 630, unless the engineer approves otherwise.
damage, and place in neat piles on the right-of-way at locations the engineer designates.
214.4Measurement
the nearest 1/10 station along t he old road centerline or reference line of those portions of the old roadway, designated for obliteration, located outside the slope limits of the grading for the new roadway. The department will excl ude areas of the old road from which the contractor has obtained material under the Borrow or Select Borrow bid items. 214.5 Payment
item: ITEM NUMBER DESCRIPTION UNIT
214.0100 Obliterating Old Road STA
removing non-rigid pavement surfa cing; and for the other work r equired under this section except as follows: