Effective with the December 2018 Letting 79 2019 Standard Speci fications Section 204 Removing or Abandoning Miscellaneous Structures
204.1Description
disposing of the resulting materials, or if required, salvaging and storing designated materials. 204.2 (Vacant)
204.3Construction 204.3.1 General
204.3.1.1 General Requirements
operations. Do not use any equipm ent or devices that might dama ge structures, facilities, or property to be preserved and retained. Complete operations necessary to remove or abandon an existing structure and that might endanger the new construction before c onstructing new work. 204.3.1.2 Backfilling
miscellaneous structures as specified fo r backfilling trenches in 203.3.5.
finished earth subgrade, or finished slopes, as necessary due t o the location of the removed structure. 204.3.1.3 Salvaging or Disposing of Materials
piles outside construction limits but within the right-of-way, at locations the engineer approves. Stockpile materials designated for salvage at locations the eng ineer approves, without contaminating the material with dirt or foreign matter.
disposing of materials under 203.3.4 . 204.3.2 Breaking Down and Removing 204.3.2.1 General
with the new construction as follows: - From within the roadway. - From within the removal limits the plans show. - From within the limits designa ted under the Obliterating Old Road bid item, whether specified or subsequently found necessary and required. - If the contract specifies, also wholly or partially remove st ructural elements occurri ng outside the limits of construction and bey ond the limits of Oblit erating Old Road.
foundations, and similar masonry structures as follows:
existing structure are to remai n in the surface of the finished work, remove the stru cture to an existing joint, or saw and chip the structure to a true line with a face perpendicular to the surface of the existing structure. Remove enou gh of the structure to provide proper gra des and connection to the new work. Maintain drainage as specified for drainage during construction in 205.3.3 .
for its disposal as specified fo r disposing of materials under 204.3.1.3 . 204.3.2.2 Removing Items 204.3.2.2.1 General
driveways, or rigid base including all surfaces or other paveme nts superimposed on them.
construction of butt joints. Remove existing pavement to the de pth the plans show by grinding, planing, chipping, sawing, or other engineer-appr oved methods.
Effective with the December 2018 Letting 80 2019 Standard Speci fications (3) Under the Removing Asphaltic Sur face bid item, remove all types of asphaltic pavement or surfacing not supported on rigid bases, or underlain by proposed excavation, or overlaid by proposed embankment. Also, remove asphalti c overlays of existing concret e pavements, bases, or bridge decks designated to remain in place.
allow the construction of butt joints. Remove existing asphalti c pavements or surfacing to the depth the plans show by grinding, planing, chipping, sawing, or other eng ineer-approved methods.
inch.
smooth, plane surface after removing the slope paving.
appurtenances. Remove concrete f oundation and leave the ballast aggregate in place.
properly reconnect live sewers c onnected with them. Maintain sa tisfactory bypass service during these operations. Plug unused sewers a s specified for abandoning pipes and structures under 204.3.3.1 .
to the WDNR requirements for removal and disposal of these cont ents. Break down and remove the tank, to an elevation not less th an 2 feet below the proposed ground surface, or 2 feet below the finished slopes or natural ground surface, as required due to t he location of the tank. Before backfilling, break a hole in the bo ttom of any remaining portio n of the tank to allow drainage. Backfill as specified for trenches, holes, and pits in 204.3.1.2 . If the septic tank disposal system includes a dry well, remove the dry well to not less than 2 feet below ground surface, and backfill it in the manner specified above for the septic tank.
openings, and clear the site withi n the right-of-way at the loc ations the plans show. Materials removed from building sites under this b id item become the contractor’s property. The contractor may incorporate these materials in the roadway embankment if the en gineer approves. Clear the entire premises of decomposable and combustible refuse, debris, and ma terials resulting from the removals and leave the premises in a neat condition.
with granular backfill conforming to 209.2 . 204.3.2.2.2 Removing As phaltic Surface Milling
surfacing by milling at the location and to the depth the plans show. The contractor may incorporate suitable material into the work or dispose of it outside the pr oject limits.
approved location that will minimize the hauling required to place the material. Prepare the stockpile foundation to minimize contamination. Ensure that the stockpile foundation is free of clods, lumps, or stones larger than 2 inches in any dimension.
material that will remain in place. Provide a uniform milled su rface that is reasonably plane, free of large scarification marks, and has the grade and transverse slo pe the plans show or the engineer directs.
prevent discharging loosened material into adjacent work areas or live traffic lanes. Provide an engineer-approved dust control system.
operation, do not windrow or stor e material on the roadway. Cle ar the roadway of materials and equipment during non-working hours. Grade shoulders adjacent to milled areas by the end of each work day to provide positive drainage of the pavement. Do not a llow abrupt longitudinal differences of 2 inches or more between lanes during non-working hours. The en gineer may waive one or more of these requirements i f the highway is closed to traffic or if a particular operation does not endanger traffic.
Effective with the December 2018 Letting 81 2019 Standard Speci fications 204.3.2.3 Removing Buildings
material and debris resulting from removing buildings, and back fill resulting holes.
unless the contract specifies otherwise. Dispose of unclaimed a nd removed material as specified for disposing of materials in 203.3.4 .
department makes or implies no g uarantee that any building will remain in the condition the bidder finds it in when the bidder prepares its proposal.
operations obstruct streets or alleys.
department of workforce development, applicable ordinances of t he municipality where the building is located, and the WDNR. Pay close attention to the requirements regulating the handling and disposal of asbestos, lead paint, and ot her hazardous su bstances. If cre ating hazardous conditions incident to the contract operations, furnish , erect, and maintain suitable barricades to safeguard the public.
allow them to disconnect and remo ve their facilities from the b uilding.
municipal ordinances or permits specify the manner of sealing a sewer service connection, then perform the work accordingly.
foundation, including any masonry floors, to an elevation not l ess than 2 feet below the ground surface, the proposed finished ea rth subgrade, or finished slope grade, as necessary due to the location of the building.
floor.
percent of the floor area in basement floors to allow drainage. 204.3.3 Abandoning Pipes and Structures 204.3.3.1 General
existing pipe connections with brick or concrete block masonry, or with any grade of concrete specified under 501.3.1.3 , or any engineer-approved commer cial grade of concrete. Unless the plans show otherwise, remove the walls o f the structures as follows:
204.3.3.2 Abandoning, Closing, and Sealing Items
204.3.3.1 .
closing culverts in 203.3.3 .
with brick, concrete block, or any grade of concrete specified under 501.3.1.3 . 204.3.3.3 Abandoning Wells
as follows: For monitoring wells .............................................................................................................................. .... NR 141 For community wells or high capacit y wells .................... ............................................................... ........... NR 811 For private water supply wells ............................................................................................... ................... NR 812
204.4Measurement
removed structures. If the contract does not include bid items for removing the listed miscellaneous
Effective with the December 2018 Letting 82 2019 Standard Speci fications structures from withi n the roadway, the department will measure the excavation for those removals as common excavation. The department will determine the volume of excavation for removing concrete structures as the area of the structure times the depth removed .
Asphaltic Surface, and Removing As phaltic Surface Butt Joints b y the square yard acceptably complete regardless of the depth or number of courses encountered. The department will measure Removing Asphaltic Surface Milli ng by the square yard, or by th e ton acceptably completed.
department will measure removing t hese structures by the square yard acceptably completed, under the Removing Pavement bid item . If removing a rigid base with a n asphaltic surface extending beyond the lateral limits of the rigid base, as in a widened pavement, the department will measure only the area occupied by the rigid base under the Removing Pavement bid item. The department will measure the portion of the asphaltic su rfacing beyond the rigid base re moved under the Excavation bid items or the Obliterating Old Road bid item. The department will make no deductions for any opening in the removed pavement having an area of 3 square yards or less.
for pavement removed under the Removing Pavement bid item.
removing pavement, the departmen t will measure Removing Curb, R emoving Gutter, and Removing Curb & Gutter by the foot accept ably completed, measured along the flow line of gutter for gutter, or curb & gutter, and along face of curb for curb.
The department will include steps based on the area of the hori zontal projection of the steps.
including end sections or anchorages, and Removing Fence by the linear foot acceptably completed.
completed, measured in the plane of the removal surface.
marker acceptably completed.
completed.
completed.
measured along single track lines, tracks with 2 rails.
completed, including attached parts and connections.
each individual manhole, catch basin, or inlet acceptably compl eted, including attached parts and connections.
completed, including any dry we lls in the tank's disposal syste m.
building acceptably completed . The department will measure the Removing Building bid items as a single lump sum unit for all buildings within the specified par cel acceptably completed.
parcel acceptably completed.
completed, measured along the centerline of the pipe.
Inlets, and Abandoning Wells bid items as each individual unit acceptably completed.
each individual pipe acceptably completed, having both ends plu gged.
Effective with the December 2018 Letting 83 2019 Standard Speci fications 204.5 Payment 204.5.1 General
items: ITEM NUMBER DESCRIPTION UNIT
204.0100 Removing Pavement SY
05 Removing Pavement Butt Joints SY
10 Removing Asphaltic Surface SY
15 Removing Asphalti c Surface Butt Joints SY
20 Removing Asphaltic Surface Milling SY
25 Removing Asphaltic Surface Milling TON
30 Removing Curb LF
40 Removing Gutter LF
50 Removing Curb & Gutter LF
55 Removing Concrete Sidewalk SY
57 Removing Concrete Barrier LF
60 Removing Lip Curb LF
65 Removing Guardrail LF
70 Removing Fence LF
75 Removing Concrete Slope Paving SY
80 Removing Delineat ors and Markers EACH
85 Removing Masonry CY
90 Removing Surface Drains EACH
95 Removing Concrete Bases EACH
204.0200 Removing Railroad Track LF
05 Removing Utility Poles EACH
10 Removing Manholes EACH
15 Removing Catch Basins EACH
20 Removing Inlets EACH
25 Removing Septic Tanks EACH
30 Removing Building (station) LS
35 Removing Building (parcel) LS
40 Site Clearance (parcel) LS
45 Removing Storm Sewer (size) LF
50 Abandoning Manholes EACH
55 Abandoning Catch Basins EACH
60 Abandoning Inlets EACH
65 Abandoning Wells EACH
70 Abandoning Culvert Pipes EACH
75 Closing Culvert Pipes EACH
80 Sealing Pipes EACH
removing, closing, plugging, or sealing; for removing and dispo sing of headwalls; for obtaining any required work permits ; for hauling and disp osing of materials; for providing any required bentonite, soil, brick, concrete block, or concrete; for restorin g the roadway c ross-section; and, unless the contract specifies granular backfill, for backfilling.
separately for that backfilling under the Backfill Granular bid items as specified in 209.5 .
structures from within the r oadway, the department will pay for excavating these removals under the Excavation Common bid item. The department will pay for excavation for removing concrete structures exceeding one cubic yard, that were not specified for removal i n the contract, at 5 times the unit price bid for Excavation Common under the Removing Miscellaneous Conc rete Structures administrative
Effective with the December 2018 Letting 84 2019 Standard Speci fications item. Other work involved in removing or abandoning miscellaneo us structures within the roadway is incidental to the work.
miscellaneous structures listed above from within the limits of Obliterating Old Road, all work involved in the removal thereof, whether specified or subsequently found necessary and required, is incidental to Obliterating Old Road.
miscellaneous structures listed above from beyond the roadway and outside the limits of Obliterating Old Road, all work involved in the removal, if the removal is s pecified in the contract, is incidental to other bid items of work. If this removal is not specified but l ater found necessary and required, the department will pay for all work involved in this removal as ex tra work. 204.5.2 Storm Sewer
Removing Storm Sewer bid item, the department will pay for that removal as extra work.
Effective with the December 2018 Letting 85 2019 Standard Speci fications Section 205 Roadway and Drainage Excavation
205.1Description
project construction.
excavation for structures, or ot her excavation that separate bid items and specific measurement and payment are specified elsewhere in the specifications and contract.
205.2Materials
205.2.1 Classification
excavation. If the contract contai ns the Excavation Common and Excavation Rock bid items, the engineer will classify that excavation as either common or rock , based on unfrozen material, as the contractor performs the work.
205.2.2 Common Excavation
stone fences, or marsh excavati on. For contracts without the Ex cavation Rock bid item, remove boulders having volumes of one c ubic yard or more under the Exc avation Common bid item. 205.2.3 Rock Excavation
unstratified masses, and conglom erate deposits or any other material so firmly cemented they present the characteristics of solid rock, and the engineer determines it is impracticable to excavate this material without blasting or using rippers. Rock excavationals o includes removing rock boulders having a volume of one cubic yard or more.
courses, or to concrete ba se or surface courses. 205.2.4 Stone Piles and Stone Fences
boulders, and rock fragments f ound assembled on the right-of-wa y in piles so that the engineer can make collective measurements by volume of the weight. If the contract includes a bid for this bid item, the classification applies to portions of the piles or assemble d stone masses found on the right-of-way that are removed and disposed of as specified. This applies reg ardless of whether this material occurs entirely above or partially below the ground surface. Do not cl assify stones in groups or piles of less than one cubic yard in volume under stone piles and stone fences. 205.2.5 Marsh Excavation
marshes and swamps underlying proposed embankments, within the limits indicated on the plans or as the engineer determines, and necessary or desirable to ensur e a stable foundation for embankment or to accelerate the subsidence of unstable material under embankment load. If old road embankment cores are encountered in areas involving marsh excav ation, salvage the portions of old road cores as designated on the pl ans and use them in the const ruction of embankments. This bid item also includes material of whatever nature encountered below the original ground elevations in areas designated for this work, exclusive of portions of old ro ad cores designated for salvage and used in construction of embankments.
the plans but encountered during construction as marsh excavati on if the engineer orders removing these areas.
205.3Construction
205.3.1 General
excavated material in the work to the extent practicable. Use e xcavated material with suitable engineering properties to constr uct the roadway, roadbed, emban kments, earth subgrade and shoulders, intersections, side ditches and dikes, channels, and waterways. Dispose of surplus or unsuitable material as specified in 205.3.12.