Effective with the December 2018 Letting 140 2019 Standard Spec ifications Section 390 Base Patching
390.1Description
mixtures for overlaying with new pavement.
390.2Materials
concrete, grade B, B-FA, B-S , B-IS, B-IP, or B-IT, under 501, except that under the Base Patching Concrete SHES bid item, furnish concrete as specified for SHES concrete repair and replacement in 416.2 . Provide QMP for class II ancillary concrete as specified in 716.
390.3Construction 390.3.1 General
restrict operations to one lane at a time. Perform work to caus e the least possible inconvenience to traffic.
locations the plans show or the engineer directs in the field. Saw the connecting edges as true and perpendicular as possible as specified for sawing pavement in 690. Remove the pavement without injury to the remaining pavement. D ispose of removed material a s specified in 204.3.1.3 .
the thickness of the contiguous pavement, including the existin g asphaltic pavement or surfacing. 390.3.2 Concrete Patching
off and finish flush with adjoining surfaces. The engineer will not require forms un less necessary to provide the required edge, grade, or alignment.
compound conforming to 501.2.9 . Protect as specified for concrete pavement in 415.3.14 . Open to traffic as specified for concrete base in 320.3 . 390.3.3 Asphaltic Patching
the required grade and contour wit h rakes and lutes. Do not rak e dumped material into the patch. The engineer will not require forms unless necessary to provide the required edge, grade, or alignment.
otherwise, compact each layer to a thickness of 6 inches or less. Roll the top layer until flush with the adjacent surface.
390.3.4 Special High Early Strength Concrete Patching
- The contractor may delay removal for up to 14 calendar days after cutting the existing pavement. - Open to traffic as specified for concrete base in 320.3 .
compound conforming to 501.2.9 . Do not apply excess curing com pound that could cause slippery pavement under traffic.
390.4Measurement
completed.
SHES by the square yard acceptably completed.
Effective with the December 2018 Letting 141 2019 Standard Spec ifications 390.5 Payment
items: ITEM NUMBER DESCRIPTION UNIT
390.0103 Base Patching SY
390.0201 Base Patching Asphaltic TON
03 Base Patching Asphaltic SY
390.0303 Base Patching Concrete SY
390.0403 Base Patching Concrete SHES SY
disposing of removed materials ; for preparing the foundation; f or providing, curing, and protecting concrete; and for providing and compacting asphaltic mixture, i ncluding the asphaltic material. Payment includes providing tie bars and dowel bars in unhardened concrete and steel within the patch. For tie bars and dowel bars provided in concrete not pla ced under the contract, the department will pay separately under the Dr illed Tie Bars and Drilled Dowe l Bars bid items a s specified in 416.5 .
Asphaltic includes providing asp haltic material. Base Patching Concrete and Base Patching Concrete SHES include providing concrete.
cylinders and providing test data to the engineer.
Concrete bid item as specified in 690.5 .
with suitable materials, the department will pay for that work either under pertinen t contract bid items, or as extra work.
Effective with the December 2018 Letting 142 2019 Standard Spec ifications Part 4 Pavements
Effective with the December 2018 Letting 143 2019 Standard Spec ifications Section 405 Coloring and Stamping Concrete
405.1Description
items as well as any special materials and special construction techniques associated with using colored concrete. Additional requirements for stamping concrete are in the contract special provisions.
405.2Materials
405.2.1 Coloring Concrete 405.2.1.1 Concrete
- For WisDOT red: use synthetic i ron oxides at a loading of 6 p ercent or more by weigh t of total cementitious material in the mix. Match the c oncrete color in reasonably close conformance with WisDOT red color, which is similar to Federal Standard 595 - FS 31136.
manufacturer instructions to the engineer before producing mate rial for incorporation into the work.
viewing at the department's regional offices.
brand, type, and color of cemen t, supplementary cementitious materials, aggregates, and admixtures for colored concrete throughou t the project. Use constant cemen t content, supplementary cementitious material content, and water/cementitious materials ratio to maintain consistent color.
modifying 405.2.1 specified in an associated Colo ring Concrete Custom contracts pecial provision. 405.2.1.2 Curing Compound
405.2.1.3 Admixtures
calcium chloride or other admixtures containing chlorides. 405.2.1.4 Colored Concrete Mix Approval 405.2.1.4.1 General
engineer will base approval either on a successful performance history or on trial batches. The engineer will evaluate color no ea rlier than 5 days after pouri ng and sealing the test concrete. Upon the engineer's approva l, the submitted sample panel or the test slab will be the visual quality standard for finished work under the contract. 405.2.1.4.2 Performance History
the engineer approved the color t he current contract Coloring C oncrete bid item designates. Ensure that all materials, including admixtures, are of the same type and brand and from the same sources. Provide the following to the engineer for review and approval:
material ratio, air c ontent, and 28-day or earlier compressive strength.
of 2-foot by 2-foot by 1.5-inch. 405.2.1.4.3 Trial Batches
necessary to conform to the contract-required color.
business days in advance, provi de the engineer with the date an d time for test slab construction.
colored concrete test slab using the same methods proposed for contract work. Produce test slabs using the same workers designated to perform the contract work. Retain samples of cements, sands, aggregates, and color additives used in test slabs for comparis on with materials used in contract work.