Effective with the December 2018 Letting 130 2019 Standard Spec ifications Section 315 Asphaltic Base
315.1Description
315.2Materials
material and mixture requirements specified for asphaltic surface in 465.
315.3Construction
315.3.1 General
here in 315.3. Place the mixture in 4-inch or thinner compacted layers unless the engineer directs otherwise. 315.3.2 Asphaltic Base Widening
asphaltic base, reconstruct the shoulder and slope to the grade and cross-section the plans show. Unless the engineer directs other wise, reconstruct using the pr eviously excavated material. Dispose of unused material as specified in 205.3.12 .
widening precludes using trench rollers and other conventional equipment, prepare and compact the foundation using engineer- approved hand methods.
surfacing, unless the contract specifies otherwise. Construct i n successive layers until the top surface is flush with the adjacent pavement surface. Before allowing th e asphaltic mixture to cool; place, spread, strike off, and compact the material.
base widening precludes using the equipment specified in 450.
315.4Measurement
completed as specified for asphaltic pavement in 450.4 .
separately. 315.5 Payment
items: ITEM NUMBER DESCRIPTION UNIT
315.0100 Asphaltic Base TON
315.0200 Asphaltic Base Widening TON
design, when required; for providing and placing the mixture, including reclaime d asphalt; and for compacting the mixture.
disposing of surplus or unsuitable excavated material.
Effective with the December 2018 Letting 131 2019 Standard Spec ifications Section 320 Concrete Base
320.1Description
320.2Materials
B-IP, or B-IT concrete as specified in 501. Provide QMP for class II ancilla ry concrete as specified in 716.
320.3Construction
320.3.1 General
320.3.1.1 Consolidating, Finishing, and Curing
require tining under 415.3.8.3 , or surface testing and correction under 415.3.10.
conforming to 501.2.9 . 320.3.1.2 Opening Concrete to Traffic
pavement under 415.3.15. If the contractor prevents l oading within 6 inches of a free edge or an edge abutting aggregate:
traffic after 3 equivalent curing days expire. 320.3.1.3 Thickness Tolerance
provisions specified for concrete pavement under 415.3.16. 320.3.2 Concrete Base 320.3.2.1 General
foundation as specified in 211. 320.3.2.2 Joints
longitudinal joints on the centerline for 2-lane concrete base or at the edges of the traffic lanes parallel to the centerline of the roadway for multilane concrete base.
1/2-inch diameter or larger tie bars, 24 inches long or longer, at 3 foot spacing.
415.3.7 .
320.4Measurement
completed. The department will m easure fillets for widened sections or fillets at drain basins and similar locations if placed mono lithic with the concrete base. The department will no t deduct for fixtures located within the limits of the concrete base. 320.5 Payment
items: ITEM NUMBER DESCRIPTION UNIT
320.0100 - 0199 Concrete Base (inch) SY
320.0300 - 0399 Concrete Base HES (inch) SY
concrete; and for providing tie bars and dowel bars in unhardened concrete. For tie bars and dowel bars provided in concrete not p laced under the contract, the department will pay sep arately under the Drilled Tie Bars and Drilled Dowe l Bars bid items as specified in 416.5 .