Effective with the December 2018 Letting 131 2019 Standard Spec ifications Section 320 Concrete Base
320.1Description
320.2Materials
B-IP, or B-IT concrete as specified in 501. Provide QMP for class II ancilla ry concrete as specified in 716.
320.3Construction
320.3.1 General
320.3.1.1 Consolidating, Finishing, and Curing
require tining under 415.3.8.3 , or surface testing and correction under 415.3.10.
conforming to 501.2.9 . 320.3.1.2 Opening Concrete to Traffic
pavement under 415.3.15. If the contractor prevents l oading within 6 inches of a free edge or an edge abutting aggregate:
traffic after 3 equivalent curing days expire. 320.3.1.3 Thickness Tolerance
provisions specified for concrete pavement under 415.3.16. 320.3.2 Concrete Base 320.3.2.1 General
foundation as specified in 211. 320.3.2.2 Joints
longitudinal joints on the centerline for 2-lane concrete base or at the edges of the traffic lanes parallel to the centerline of the roadway for multilane concrete base.
1/2-inch diameter or larger tie bars, 24 inches long or longer, at 3 foot spacing.
415.3.7 .
320.4Measurement
completed. The department will m easure fillets for widened sections or fillets at drain basins and similar locations if placed mono lithic with the concrete base. The department will no t deduct for fixtures located within the limits of the concrete base. 320.5 Payment
items: ITEM NUMBER DESCRIPTION UNIT
320.0100 - 0199 Concrete Base (inch) SY
320.0300 - 0399 Concrete Base HES (inch) SY
concrete; and for providing tie bars and dowel bars in unhardened concrete. For tie bars and dowel bars provided in concrete not p laced under the contract, the department will pay sep arately under the Drilled Tie Bars and Drilled Dowe l Bars bid items as specified in 416.5 .
Effective with the December 2018 Letting 132 2019 Standard Spec ifications (3) Payment for the Concrete Base an d Concrete Base HES bid items also includes preparing the foundation except, if the contract contains the Prepare Foundation for Concrete Base bid item, the department will pay separately fo r preparing the foundation under 211.5 .
Effective with the December 2018 Letting 133 2019 Standard Spec ifications Section 325 Pulverized and Re-laid Pavement
325.1Description
portion of the underlying base and relaying the pulverized mate rial to construct a new base. 325.2 (Vacant)
325.3Construction
sieve. Also pulverize the exis ting base to the depth the plans show and mix with the pulverized asphaltic pavement. Windrow mat erial as construction operations dictate.
plans show. If there is insuffici ent material at a given locati on, shape the available material to create a smooth profile and cross slope for a good ride. Eliminate localized bumps, depressions, and ruts. Unless the engineer specifically directs, the contractor is not required to haul material from one location on the project to another.
padfoot roller and second with a v ibratory steel roller. Add water, as required, both before and during compaction. Compact each layer to the extent required for stand ard compaction under 301.3 . Use compaction equipment as follows:
heavier vibratory steel roller.
specified for those lift thicknesses.
between adjacent lanes. Repair surf ace damage caused by interve ning construction or public traffic immediately before paving as ne cessary to provide a good riding pavement.
325.4Measurement
measured using the centerline length and the width from outside to outside of completed base, but limited to the width the plans show or the engineer directs.
325.5Payment
item: ITEM NUMBER DESCRIPTION UNIT
325.0100 Pulverize and Relay SY
compacting. If the engineer requires hauling material from one location on the proj ect to another, the department will pay for that hauling as extra work.
bid item, the department will pays eparately for compaction and dust control water under 624.5 .