SECTION 213: OBLITERATING OLD ROAD
213.1 Description
This Work consists of obliterating old Road.
213.2 MATERIALS—Reserved
213.3 Construction Requirements
After the old Road is no longer needed for traffic, the Contrac tor shall remove and stockpile existing surfacing Materials to Subgrade in an enviro nmentally Acceptable manner. The Contractor shall fill ditches , rough grade the Road (to ble nd with the surrounding terrain) and form natural rounded slopes (approved by the Proje ct Manager). Next, the Contractor shall scarify or plow (to thoroughly mix the remaini ng surfacing Material with earth), harrow, and smooth the Roadbed.
213.4 Method of Measurement
The Department will measure obliterating old road along the centerline of the old Road.
213.5 Basis of Payment
Pay Item Pay Unit Obliterating Old Road Mile
213.5.1 Work Included in Payment
The Department will consider as included in the payment for th e pay item(s) listed in this section and will not measure or pay separately for the followin g Work: 1. Removing, hauling, and stockpiling existing surfacing Materi als; and 2. Grading, scarifying, and plowing. Division: 300 Page 127 DIVISION 300 – BASES
Division C — ontents
302: Processing, Placing, and Compacting Existing Pavement .... . 128 303: Base Course .............................................. ............................. 130 306: Portland Cement or Lime Treated Subgrade ................. ........ 135 Division: 300 Page 127 DIVISION 300 – BASES
Division C — ontents
302: Processing, Placing, and Compacting Existing Pavement .... . 128 303: Base Course .............................................. ............................. 130 306: Portland Cement or Lime Treated Subgrade ................. ........ 135 Section 302: Processing, Placing, and Compacting Existing Pavem ent Page 128