Effective with the December 2018 Letting 521 2019 Standard Spec ifications Section 701 General QMP Requirements Rewrite and reorganize section 701 to coordinate with the a ddition of sections 730 and 740 for base aggregate and ride.
701.1 Description
701.1.1 General (1) This section describes contrac tor responsibilities common to Q MPs under part 7 including quality control plans; personnel and laboratory certification; quality control testing; data submission; and record keeping. This section also describes department responsi bilities, common to all QMPs under
Part 7 — , for verification and quality assurance testing. Excepti ons and additional requirements under the
QMP program are specified in the individual QMP provisions. 701.1.2 Quality Control Program 701.1.2.1 General (1) Provide and maintain a quality control program, defined as all contractor activities and documentation of the following:
701.2 (Vacant)
701.3 Testing
701.3.1 General (1)Perform contract required QC tests for samples randomly located according to CMM 8-30. Use the test methods specified in table 701-1 . Effective with the December 2018 Letting 523 2019 Standard Spec ifications Revise table 701-1 to include both testing standards & certifications, add random sampling, add additional aggregate QMP tests, add SAM air void testing, and allow plant personnel to sample. TABLE 701-1 TESTING AND CERTIFICATION STANDARDS TEST TEST STANDARD MINIMUM REQUIRED CERTIFICATION (any one of the certificati ons listed for each test) Random Sampling CMM 8-30.9.2 Transportation Materials Sampling Technician (TMS) Aggregate Technician I (AGGTEC-I) AGGTEC-I Assistant Certified Technician (ACT-AGG) PCC Technician I (PCCTEC-I) PCCTEC-I Assistant Certified Technician (ACT-PCC) Grading Technician I (GRADINGTEC-I) Grading Assistant Certified T echnician (ACT-GRADING) Sampling Aggregates AASHTO T2[1][4] TMS, AGGTECT-1, ACT-AGG Percent passing the No. 200 sieve AASHTO T11[1] AGGTEC-I, ACT-AGG Fine and coarse aggreg ate gradation AASHTO T27[1] Aggregate moisture content AASHTO T255[1] Fractured faces ASTM D5821[1] Liquid limit AASHTO T89 Aggregate Testing for Trans portation Systems (ATTS) GRADINGTEC-I, or ACT-GRADING Plasticity index AASHTO T90[3] Sampling freshly mixed concrete AASHTO R60 PCCTEC-1 ACT-PCC Air content of fresh concrete AASHTO T152[2] Air void system of fresh concrete AASHTO TP118 Concrete slump AASHTO T119[2] Concrete temperature ASTM C1064 Making and curing concrete cylinders AASHTO T23 Moist curing for concrete cylinders AASHTO M201 Concrete compressive strength AASHTO T22 Concrete Strength Tester (CST) CST Assistant Certified Technician (ACT-CST) Concrete flexural strength AASHTO T97 Profiling __ PROFILER [1] As modified in CMM 8-60. [2] As modified in CMM 8-70. [3] A plasticity check, if required und er individual QMP provisions , may be performed by an AGGTEC-I in addition to the certifications listed for liquid limit and plasticity in dex tests. [4] Plant personnel may o perate equipment to obtain samples under t he direct observation of a TMS or higher. 701.3.2 Contractor QC Testing (1) Generate random numbers, determine sample and test locations a ccording to CMM 8-30 , and provide to the engineer before placing material within the corresponding test increment. Perform contract required QC tests at the predetermi ned random location. Also, p erform other tests as necessary to control production and construc tion processes, and additional testing enumerated in the contractor’s quality control plan or t hat the engineer directs. Provide test results to the department’s project materials coordinator within the timeframe specified in the QMP provisions. (2) Notify the engineer when an indi vidual test exceeds a spec lim it. Material from the first out-of-spec test up to, but not including, materia l from the first subsequent in-spec test is nonconforming. The department may reject or otherwise determine the final disposit ion of nonconforming material as specified in 106.5 . (3) The department may periodically observe contractor sampling an d testing, and direct additional contractor sampling and testing for department evaluation. 701.3.3 Department Testing 701.3.3.1 General (1) The department conducts verification testing to validate product quality and independent assurance testing to evaluate sampling and testing. The department will use the same sampling and testing methods required for contractor testing under 701.3.1. The department will provi de the contractor with Effective with the December 2018 Letting 524 2019 Standard Spec ifications a list of names and telephone numbe rs of project verification a nd independent assurance personnel upon approval of the QC plan. (2) The department will provide test r esults to the contractor wit hin the timeframe specified in the individual QMP provisions. (3) Correct department-i dentified deficiencies. If the contractor fails to correct deficiencies or resolve discrepancies, the engineer may suspend production. 701.3.3.2 Quality Verification Testing (1) The department will have an HTCP-certified technician, or ACT working under a certified technician, perform QV sampling and testing . Department QV testing personne l must meet the same certification requirements specified in 701.1.2.4 . (2) The department will sample and test randomly at locations independent of the contractor’s QC tests and use separate equipment and laboratories. The department will notify the contractor before sampling so the contractor can ob serve QV sampling. The departm ent will conduct a minimum of one verification test for each 5 cont ractor QC tests unless specifi c QMP provisions specify otherwise. (3) If verification tests conform to specifications, no further action is required. If verification tests do not conform to specifications, the department will notify the contr actor immediately and the two parties will jointly investigate. The investigation may include additional t esting as well as rev iew and observation of both department and contractor sampling and testing procedur es, equipment, and other documented test results. Both par ties will document investigative work. 701.3.3.3 Independent Assurance Testing (1) The department performs independent assurance testing to evalu ate department verification and contractor’s QC sampling and testing including personnel qualif ications, procedures, and equipment. The department will perform independe nt assurance reviews according to the department’s independent assurance program, which may include one or more of the following:
701.4 (Vacant)
701.5 Payment
(1) Costs for sampling, testing, and documentation under part 7 are incidental to the work. If the contractor fails to perform work required under the contract QM P provisions, the department may reduce the contractor’s pay. The department will administer pay reductions under the Non- performance of QMP administrative item. Effective with the December 2018 Letting 525 2019 Standard Spec ifications Section 710 General Concrete QMP
710.1 Description
(1) This section describes contractor QC testing requirements comm on to all concrete classes under part
710.2 Small Quantities
(1) For contracts with only small quantities of material subject to testing, as defined under specific contract QMP provisions, modify the requirements of 710 as follows:
710.3 Certification Requirements
(1) Have a certified PCC technician I, or ACT-PCC working under a certified technician, present at the project site, prepared and equipped to perform required samplin g and testing whenever placing concrete.
710.4 Concrete Mixes
(1) The contractor is responsible for mix performance. (2) At least 3 business days before producing concrete, provide do cumentation ensuring that materials conform to 501 unless the engineer allows or specific QMP provisions provide otherwise. Include the following:
710.5 Sampling and Testing
710.5.1 Sampling (1) Sample fresh concrete a t the point of placement. 710.5.2 Slump (1) Provide material conforming to the slumps specified in 501.3.7.1 . The contractor need not test slump for concrete placed by slip-for m methods unless the engineer re quests. For other placement methods, test slump whenever an air cont ent test is performed, cylinders are made, and as the engineer directs.