Effective with the December 2018 Letting 525 2019 Standard Spec ifications Section 710 General Concrete QMP
710.1Description
- 715 for class I concrete used in structures and pavement. - 716 for class II and class III concret e used in ancillary applications.
710.2Small Quantities
QMP provisions, modify the requirements of 710 as follows:
710.3Certification Requirements
project site, prepared and equipped to perform required samplin g and testing whenever placing concrete.
710.4Concrete Mixes
conform to 501 unless the engineer allows or specific QMP provisions provide otherwise. Include the following:
material ratio, and air content.
required, and air correction fact or. Also include proposed grad ation, including P200, limits if using a combined gradation as allowed under 715.2.2.
reducing retarders from the department's APL, without conforming to the following: - Obtain the engineer’s approval in advance. - Document, by independent laboratory test reports, that the ad mixture conforms to AASHTO M194.
modified mix. Modifications requiring the engineer’s approval i nclude changes in:
slump do not require engineer review or approval.
following: - Add at least 95 pounds but no more than 280 pounds of cement per cubic yard to a previously accepted mix along with enough water to maintain workability without rai sing the w/cm. - Substitute regular grade C for grade A or A2 high early stren gth concrete. - Substitute regular grade A for grade B high early strength co ncrete.
710.5Sampling and Testing
710.5.1 Sampling
710.5.2 Slump
for concrete placed by slip-for m methods unless the engineer re quests. For other placement methods, test slump whenever an air cont ent test is performed, cylinders are made, and as the engineer directs.
Effective with the December 2018 Letting 526 2019 Standard Spec ifications 710.5.3 Air Content
test each mix design at start- up and as frequently as practicable until concrete is conforming and concrete production is under c ontrol. Subsequently, test at the QC testing frequency specified in specific contract QMP provisions and as the engineer directs.
subsequent loads until the air content is conforming. 710.5.4 Concrete Temperature
along with the air content. 710.5.5 Compressive Strength
cylinders from a single truckload of concrete. Mark each cylinder to identify the lot and sublot or location on the project it represents.
to the specimens in the range of 60 to 80 F and prevent moisture loss. Between 24 and 48 hours after casting, transport the specimens to a department-qualified labo ratory for standard curing until testing at 28 days.
compression machine that automatically records the date, time, rate of loading, and maximum load of each cylinder. Provide a print out of this information for each cylinder tested. 710.5.6 Aggregate Testing 710.5.6.1 General
stockpiles at the conc rete production location. If aggregate wa s stockpiled before the contract, and test records from production or sto ckpiling are not available or not acceptable to the engineer, test during concrete production.
limits for the coarse and fine agg regate fractions as specified in the contractor's quality control plan. For testing performed during con crete production, conform to combined gradation limits submitted in the contractor's quality control plan. 710.5.6.2 Gradation Testing Du ring Aggregate Production or Sto ckpiling
aggregates. Test each stockpile for each component aggregate du ring aggregate production or stockpiling as follows: TABLE 710-1 AGGREGATE PRODUCTION AND STOCKPILING GRADATION TESTING FREQUENCY
DAILY AGGREGATE PRODUCTION MIN IMUM FREQUENCY PER STOCKPILE 1000 tons or less One test per cumulative total of 1000 tons more than 1000 tons through 2000 tons Two tests per day more than 2000 tons Three tests per day
combined P200 during concrete pro duction. Ensure that the combi ned P200 is 2.3 percent or less. Use a washed analysis for both fine and coarse aggregates. Rand omly, test at least once for each 50 cubic yards of concrete. For da ily production greater than 50 c ubic yards, one test per day is sufficient for constant mix conditions. The engineer may allow testing to be reduced to a minimum of once per 5 days of concrete production afte r 5 consecutive tests show that the combined P200 is less than or equal to 1.8 percent. 710.5.6.3 Gradation Testing During Concrete Production
aggregates. Test each stockpile for each component aggregate as follows:
Effective with the December 2018 Letting 527 2019 Standard Spec ifications TABLE 710-2 CONCRETE PRODUCTION GRADATION TESTING FREQUENCY
DAILY CONCRETE PRODUCTION MINI MUM FREQUENCY PER STOCKPILE 250 cubic yards or less One tes t per cumulative total of 250 cu bic yards more than 250 cubic yards throug h 1000 cubic yards One test per day more than 1000 cubic yards Two tests per day
Effective with the December 2018 Letting 528 2019 Standard Spec ifications Section 715 QMP Concrete Pavement and Structures
715.1Description
concrete pavement, and concrete structures. 715.1.1 Quality Control Program 715.1.1.1 General
QMP provisions for class I concret e specified here in section 7 15. The department defines class I concrete as cast-n-place concrete used in pavement or structure applications where all of the following apply: - Mix design requires review by the engineer. - The contract definess pec limits for strength. - The contractor may earn statis tically based incentives for superior concrete strength. [1] [1] HES and SHES concrete are not eligible for 28-day strength inc entives. 715.1.1.2 Small Quantities
under 710.2 , as follows: - Less than 150 cubic yards of structure concrete placed under a single bid item. - Less than 2500 cubic yards of s lip-formed pavement placed using a single mix design. - Less than 1000 cubic yards of non-slip-formed pavement placed using a single mix design. 715.1.1.3 Pre-Pour Meetings for Structure Concrete
schedule, personnel r oles and responsibilit ies, testing and qua lity control, and how test results will be communicated. Schedule the first m eeting before placing any con crete and the second before placing any bridge deck concrete. Ensure that representatives from all parties involved with concrete work, including contractor, sub-contr actor, ready-mix supplier, teste rs, and the project manager, attend these meetings. 715.1.1.4 Quality Control Plan
701.1.2.2 and include additional concrete mix information as follows:
well as the name, title, and phone number of the person developing the mix design.
715.2Materials
715.2.1 General
methods: - Have a HTCP-certified PCC te chnician II develop new concrete mixes qualified based on the results of mix development tests performed by a d epartment-qualified laborator y. - Submit previously-used depar tment-approved mixes qualified ba sed on field performance.
provide routine 28-day compressi ve strength tests during placement for high early strength concrete.
submit 2 copies of a concrete mix report at least 3 business da ys before producing concrete. For lab- qualified mixes, include strength data, test dates, and the nam e and location of the laboratory that performed mix development testing . For field-qualified mixes, i nclude historical dat a that demonstrate acceptable strength and field performance.
developer and the engineer. Have the mix developer sign and dat e each copy attesting that all information in the report is accurate. The engineer will sign a nd date each copy of the report. The engineer’s signature verifies t hat the engineer had the opportu nity to review the mix report, to check that it meets the concrete mix r equirements, and to comment. Th e engineer will return a signed copy to the contractor within 3 busine ss days of receiving the repor t.