B
HomeLibrariesCode AISearchProjectsBookmarksAddress
FeedbackHelp Desk
Libraries
Code LibraryDiagramsAssembliesProductsCalculatorsChecklistsCSI MasterFormat SpecificationsPermitsAddress ReportDOT SpecsModel CodesTransportationRailroadFire SafetyAccessibilityStructuralTransit SpecsUSACE
Other Jurisdictions
Transportation
MUTCDFHWA FP-14
Accessibility
ADA StandardsPROWAG
PricingLog in

AlaskaAnchorage

Retaining wall permit checklist — Anchorage, Alaska

Assembled from Anchorage’s own published permit rules. Every line below is quoted from a city document and linked to it. Nothing here is generated, estimated, or inferred from another jurisdiction.

Do you need a permit?

Anchorage requires a permit for a retaining wall.

When a permit is not required

AMC 23.10.104.2.1, item D, lets a standalone retaining wall go up without a building permit. Two dimensions govern: the retained height — footing base up to where the held soil meets the wall face — must come in at 4 feet or under, and no more than one foot of wall may stick up past that soil. Terraced walls that together exceed 4 feet still qualify, provided the gap between the lower wall's back face and the upper wall's front face measures more than twice the soil height the lower wall retains. Items on the building permit exemption list still draw separate plumbing, electrical and mechanical permits unless the code exempts those too.

Loading the full checklist…

Sources

Other permits Anchorage publishes rules for

Listed because the city publishes a separate rule for each type — not because this project necessarily triggers one. Whether it does depends on your scope of work.

All Anchorage permit requirementsAnchorage permit costsApply with the city ↗

BuildSpec is a reference, not the authority having jurisdiction. Confirm requirements with Anchorage before you build.

Retaining wall permit checklist — Anchorage, Alaska | BuildSpec