B
HomeLibrariesCode AISearchProjectsBookmarksAddress
FeedbackHelp Desk
Libraries
Code LibraryDiagramsAssembliesProductsCalculatorsChecklistsCSI MasterFormat SpecificationsPermitsAddress ReportDOT SpecsModel CodesTransportationRailroadFire SafetyAccessibilityStructuralTransit SpecsUSACE
Other Jurisdictions
Transportation
MUTCDFHWA FP-14
Accessibility
ADA StandardsPROWAG
PricingLog in

CaliforniaLos Angeles County

Retaining wall permit checklist — Los Angeles County, California

Assembled from Los Angeles County’s own published permit rules. Every line below is quoted from a city document and linked to it. Nothing here is generated, estimated, or inferred from another jurisdiction.

Do you need a permit?

Los Angeles County requires a permit for a retaining wall.

When a permit is not required

No building permit is needed for a retaining wall that stays at or under the 4-foot limit — the County measures wall height from footing bottom to wall top — provided nothing bears on the soil behind it. Any surcharge defeats the exemption at any height: sloping backfill, a driveway, a pool, or a structure footing all count. This is the same threshold the State uses, not a local tightening. On unincorporated hillside parcels the exemption rarely helps in practice, since sloping backfill is itself a surcharge and moving earth for the wall triggers grading review under the County grading fee schedule in addition to the building permit.

Loading the full checklist…

Sources

Other permits Los Angeles County publishes rules for

Listed because the city publishes a separate rule for each type — not because this project necessarily triggers one. Whether it does depends on your scope of work.

All Los Angeles County permit requirementsLos Angeles County permit costsApply with the city ↗

BuildSpec is a reference, not the authority having jurisdiction. Confirm requirements with Los Angeles County before you build.

Retaining wall permit checklist — Los Angeles County, California | BuildSpec