Retaining wall permit checklist — Fort Collins, Colorado

Assembled from Fort Collins’s own published permit rules. Every line below is quoted from a city document and linked to it. Nothing here is generated, estimated, or inferred from another jurisdiction.

Do you need a permit?

Fort Collins requires a permit for a retaining wall.

When a permit is not required

Retaining walls up to 4 feet, measured from the low side grade to the top, are exempt from a permit unless supporting a surcharge. If there is another retaining wall uphill, the distance between the walls must be at least the full height of the lower wall.

Loading the full checklist…

Sources

Other permits Fort Collins publishes rules for

Listed because the city publishes a separate rule for each type — not because this project necessarily triggers one. Whether it does depends on your scope of work.

All Fort Collins permit requirementsFort Collins permit costsApply with the city ↗

BuildSpec is a reference, not the authority having jurisdiction. Confirm requirements with Fort Collins before you build.