Deck permit checklist — Boise, Idaho

Assembled from Boise’s own published permit rules. Every line below is quoted from a city document and linked to it. Nothing here is generated, estimated, or inferred from another jurisdiction.

Do you need a permit?

Boise requires a permit for a deck.

When a permit is not required

A deck or concrete patio requires a building permit when it is more than 12 inches above grade. Footings must extend a minimum of 24 inches below grade to meet the local frost depth.

What Boise publishes for this permit

  • 3 submittal documents to include with the application
  • 3 required inspections, in the city's published order
  • 1 process step from application to final
  • 1 published fee line from the city's fee schedule
  • Checked against Boise's documents on November 9, 2026

Loading the full checklist…

Sources

Other permits Boise publishes rules for

Listed because the city publishes a separate rule for each type — not because this project necessarily triggers one. Whether it does depends on your scope of work.

All Boise permit requirementsBoise permit costsApply with the city ↗

BuildSpec is a reference, not the authority having jurisdiction. Confirm requirements with Boise before you build.

Deck permit checklist — Boise, Idaho | BuildSpec