B
HomeLibrariesCode AISearchProjectsBookmarksAddress
FeedbackHelp Desk
Libraries
Code LibraryDiagramsAssembliesProductsCalculatorsChecklistsCSI MasterFormat SpecificationsPermitsAddress ReportDOT SpecsModel CodesTransportationRailroadFire SafetyAccessibilityStructuralTransit SpecsUSACE
Other Jurisdictions
Transportation
MUTCDFHWA FP-14
Accessibility
ADA StandardsPROWAG
PricingLog in

LouisianaShreveport

Deck permit checklist — Shreveport, Louisiana

Assembled from Shreveport’s own published permit rules. Every line below is quoted from a city document and linked to it. Nothing here is generated, estimated, or inferred from another jurisdiction.

Do you need a permit?

Shreveport requires a permit for a deck.

When a permit is not required

The City's Guide to Building Permits & Inspections, following Section R105.2 of the 2021 International Residential Code, lists as exempt from a building permit small detached decks that are 200 square feet or less, no higher than 30 inches above grade, not attached to the dwelling, and not serving the required exit door.

Loading the full checklist…

Sources

Other permits Shreveport publishes rules for

Listed because the city publishes a separate rule for each type — not because this project necessarily triggers one. Whether it does depends on your scope of work.

All Shreveport permit requirementsShreveport permit costsApply with the city ↗

BuildSpec is a reference, not the authority having jurisdiction. Confirm requirements with Shreveport before you build.

Deck permit checklist — Shreveport, Louisiana | BuildSpec