B
HomeLibrariesCode AISearchProjectsBookmarksAddress
FeedbackHelp Desk
Libraries
Code LibraryDiagramsAssembliesProductsCalculatorsChecklistsCSI MasterFormat SpecificationsPermitsAddress ReportDOT SpecsModel CodesTransportationRailroadFire SafetyAccessibilityStructuralTransit SpecsUSACE
Other Jurisdictions
Transportation
MUTCDFHWA FP-14
Accessibility
ADA StandardsPROWAG
PricingLog in

OregonPortland

Deck permit checklist — Portland, Oregon

Assembled from Portland’s own published permit rules. Every line below is quoted from a city document and linked to it. Nothing here is generated, estimated, or inferred from another jurisdiction.

Do you need a permit?

Portland requires a permit for a deck.

When a permit is not required

A building permit is required when the walking surface is more than 30 inches above the adjacent grade, measured 36 inches from the edge of the deck. Decks with a walking surface 30 inches or less above the adjacent grade do not need a building permit, though a zoning permit may be required in environmental, greenway or river overlay zones. Covered decks are subject to additional zoning requirements regardless of height. All structures must meet zoning requirements whether or not a building permit is required.

Loading the full checklist…

Sources

Other permits Portland publishes rules for

Listed because the city publishes a separate rule for each type — not because this project necessarily triggers one. Whether it does depends on your scope of work.

All Portland permit requirementsPortland permit costsApply with the city ↗

BuildSpec is a reference, not the authority having jurisdiction. Confirm requirements with Portland before you build.

Deck permit checklist — Portland, Oregon | BuildSpec