B
HomeLibrariesCode AISearchProjectsBookmarksAddress
FeedbackHelp Desk
Libraries
Code LibraryDiagramsAssembliesProductsCalculatorsChecklistsCSI MasterFormat SpecificationsPermitsAddress ReportDOT SpecsModel CodesTransportationRailroadFire SafetyAccessibilityStructuralTransit SpecsUSACE
Other Jurisdictions
Transportation
MUTCDFHWA FP-14
Accessibility
ADA StandardsPROWAG
PricingLog in

OregonPortland

Retaining wall permit checklist — Portland, Oregon

Assembled from Portland’s own published permit rules. Every line below is quoted from a city document and linked to it. Nothing here is generated, estimated, or inferred from another jurisdiction.

Do you need a permit?

Portland requires a permit for a retaining wall.

When a permit is not required

Portland requires a building permit once a retaining wall passes four feet, sized from the footing base to the wall's highest point. A permit is also required at any height where the wall carries a surcharge — that is, a load on the retained soil over and above the weight of level earth backfill. Shorter walls can still trigger a zoning permit, and a Site Development permit may apply on difficult sites or where the work stabilizes a slope.

Loading the full checklist…

Sources

Other permits Portland publishes rules for

Listed because the city publishes a separate rule for each type — not because this project necessarily triggers one. Whether it does depends on your scope of work.

All Portland permit requirementsPortland permit costsApply with the city ↗

BuildSpec is a reference, not the authority having jurisdiction. Confirm requirements with Portland before you build.

Retaining wall permit checklist — Portland, Oregon | BuildSpec