General building work permit checklist — Eagle Mountain, Utah
Assembled from Eagle Mountain’s own published permit rules. Every line below is quoted from a city document and linked to it. Nothing here is generated, estimated, or inferred from another jurisdiction.
Do you need a permit?
Eagle Mountain requires a permit for general building work.
The city's handout "What Requires a Building Permit" (August 2026 edition) lists the work that requires a permit rather than publishing a single exemption list. Structural work it names as requiring a permit includes new houses, home additions, garages, carports, porches, balconies, decks (unless no higher than 30 inches over the ground at every spot and not requiring guardrails - height taken 36 inches out horizontally from the deck edge, then down to grade), roof structure modifications (re-roof), load-bearing wall changes, foundation and footing work, basement finishing, attic conversions, new rooms, structural repairs, demolition, moving a structure, and converting a garage into living space. Site structures requiring a permit include accessory structures with multiple stories or a single story greater than 200 square feet (sheds, workshops, playhouses), Conex boxes greater than 350 square feet or connected to additional Conex boxes, retaining walls over 24 inches supporting a surcharge or greater than 48 inches without a surcharge (tiered walls treated as supporting a surcharge), permanent or above-ground pools greater than 24 inches in height, and permanent in-ground spas and hot tubs; mechanical, plumbing, electrical and gas work carry their own permit lists. The handout's exemption list includes one-story detached accessory structures of 200 square feet or smaller (except storm shelters), fences 7 feet or less in height, and certain retaining walls 4 feet or less that do not support a surcharge. This edition replaced the October 2024 handout "What Requires a Building Permit & Why", which had additionally listed sheds with electric or plumbing (any size), solar panels, and any structure attached to a home; solar guidance now lives in the city's separate Solar PV checklist.
What Eagle Mountain publishes for this permit
- 11 required inspections, in the city's published order
- 1 process step from application to final
- 1 published fee line from the city's fee schedule
- Checked against Eagle Mountain's documents on November 10, 2026
Loading the full checklist…
Sources
- building — permit rules ↗verified November 2026
- building — fee schedule ↗verified November 2026
Other permits Eagle Mountain publishes rules for
Listed because the city publishes a separate rule for each type — not because this project necessarily triggers one. Whether it does depends on your scope of work.
- Deck permit checklist
- Fence permit checklist
- Shed permit checklist
- Water heater permit checklist
- Re-roof permit checklist
- Retaining wall permit checklist
BuildSpec is a reference, not the authority having jurisdiction. Confirm requirements with Eagle Mountain before you build.