Shed permit checklist — Eagle Mountain, Utah

Assembled from Eagle Mountain’s own published permit rules. Every line below is quoted from a city document and linked to it. Nothing here is generated, estimated, or inferred from another jurisdiction.

Do you need a permit?

Eagle Mountain requires a permit for a shed.

When a permit is not required

One-story detached accessory structures of 200 square feet or smaller (except storm shelters) sit on the exemption list of the city's "What Requires a Building Permit" handout (August 2026 edition); accessory structures with multiple stories or a single story greater than 200 square feet (sheds, workshops, playhouses) need a permit under the same handout. The superseded October 2024 edition of the handout had also called for a permit for sheds with electric or plumbing at any size; the current edition drops that line and instead covers electrical and plumbing work through its general electrical and plumbing permit lists, so wiring or plumbing a shed still takes the applicable trade permit even where the structure itself is exempt.

What Eagle Mountain publishes for this permit

  • 4 submittal documents to include with the application
  • 1 process step from application to final
  • 1 published fee line from the city's fee schedule
  • Checked against Eagle Mountain's documents on November 4, 2026

Loading the full checklist…

Sources

Other permits Eagle Mountain publishes rules for

Listed because the city publishes a separate rule for each type — not because this project necessarily triggers one. Whether it does depends on your scope of work.

All Eagle Mountain permit requirementsEagle Mountain permit costsApply with the city ↗

BuildSpec is a reference, not the authority having jurisdiction. Confirm requirements with Eagle Mountain before you build.