B
HomeLibrariesCode AISearchProjectsBookmarksAddress
FeedbackHelp Desk
Libraries
Code LibraryDiagramsAssembliesProductsCalculatorsChecklistsCSI MasterFormat SpecificationsPermitsAddress ReportDOT SpecsModel CodesTransportationRailroadFire SafetyAccessibilityStructuralTransit SpecsUSACE
Other Jurisdictions
Transportation
MUTCDFHWA FP-14
Accessibility
ADA StandardsPROWAG
PricingLog in

UtahMillcreek

Shed permit checklist — Millcreek, Utah

Assembled from Millcreek’s own published permit rules. Every line below is quoted from a city document and linked to it. Nothing here is generated, estimated, or inferred from another jurisdiction.

Do you need a permit?

Millcreek requires a permit for a shed.

When a permit is not required

One-story detached accessory structures other than storm shelters are exempt from a building permit where the floor area does not exceed 200 square feet residential or 120 square feet commercial, but all accessory structures regardless of size require Planning and Zoning approval.

Loading the full checklist…

Sources

Other permits Millcreek publishes rules for

Listed because the city publishes a separate rule for each type — not because this project necessarily triggers one. Whether it does depends on your scope of work.

All Millcreek permit requirementsMillcreek permit costsApply with the city ↗

BuildSpec is a reference, not the authority having jurisdiction. Confirm requirements with Millcreek before you build.

Shed permit checklist — Millcreek, Utah | BuildSpec