B
HomeLibrariesCode AISearchProjectsBookmarksAddress
FeedbackHelp Desk
Libraries
Code LibraryDiagramsAssembliesProductsCalculatorsChecklistsCSI MasterFormat SpecificationsPermitsAddress ReportDOT SpecsModel CodesTransportationRailroadFire SafetyAccessibilityStructuralTransit SpecsUSACE
Other Jurisdictions
Transportation
MUTCDFHWA FP-14
Accessibility
ADA StandardsPROWAG
PricingLog in

UtahSalt Lake City

Retaining wall permit checklist — Salt Lake City, Utah

Assembled from Salt Lake City’s own published permit rules. Every line below is quoted from a city document and linked to it. Nothing here is generated, estimated, or inferred from another jurisdiction.

Do you need a permit?

Salt Lake City requires a permit for a retaining wall.

When a permit is not required

A retaining wall of four feet or less, sized from the footing base to the wall's highest point, is exempt so long as nothing adds load behind it and no flammable liquid is held back.

Loading the full checklist…

Sources

Other permits Salt Lake City publishes rules for

Listed because the city publishes a separate rule for each type — not because this project necessarily triggers one. Whether it does depends on your scope of work.

All Salt Lake City permit requirementsSalt Lake City permit costsApply with the city ↗

BuildSpec is a reference, not the authority having jurisdiction. Confirm requirements with Salt Lake City before you build.

Retaining wall permit checklist — Salt Lake City, Utah | BuildSpec