B
HomeLibrariesCode AISearchProjectsBookmarksAddress
FeedbackHelp Desk
Libraries
Code LibraryDiagramsAssembliesProductsCalculatorsChecklistsCSI MasterFormat SpecificationsPermitsAddress ReportDOT SpecsModel CodesTransportationRailroadFire SafetyAccessibilityStructuralTransit SpecsUSACE
Other Jurisdictions
Transportation
MUTCDFHWA FP-14
Accessibility
ADA StandardsPROWAG
PricingLog in

WashingtonSeattle

General building work permit checklist — Seattle, Washington

Assembled from Seattle’s own published permit rules. Every line below is quoted from a city document and linked to it. Nothing here is generated, estimated, or inferred from another jurisdiction.

Do you need a permit?

Seattle requires a permit for general building work.

When a permit is not required

A permit is not required for minor repairs or alterations that cost $6,000 or less in any 6-month period, measured by the fair market value of labor and parts even when the owner does the work. A one-story detached accessory building such as a greenhouse, tool or storage shed, or playhouse is exempt when the projected roof area is less than 120 square feet and the foundation is only a slab on the ground.

Loading the full checklist…

Sources

Other permits Seattle publishes rules for

Listed because the city publishes a separate rule for each type — not because this project necessarily triggers one. Whether it does depends on your scope of work.

All Seattle permit requirementsSeattle permit costsApply with the city ↗

BuildSpec is a reference, not the authority having jurisdiction. Confirm requirements with Seattle before you build.

General building work permit checklist — Seattle, Washington | BuildSpec