Extra Work
Defined in the standard specifications of 9 state transportation agencies. Each definition below is the agency’s own text, with the section it comes from — they do not all say the same thing, and on a contract the difference is the point.
Definitions are quoted from state-authored public specification books. This page carries no I-Code-derived terms.
Work not provided for in the Contract as awarded but found by the Engineer to be essential to the satisfactory completion of the Contract within its intended scope.
Section 101 — DEFINITIONS AND TERMS →Any “work” which is required by the Engineer to be performed and which is not otherwise covered or included in the project by the existing Contract Documents, whether it be in the nature of additional work, altered work, deleted work, work due to differing site conditions, or otherwise. This term does not include a “del ay”.
Section 1 — DEFINITIONS AND TERMS →Work not provided for in the contract as awarded, but found essential for satisfactory completion of the contract within its intended scope, as determined by the Engineer. Float (Total Float). The total number of days in the project schedule that a scheduled activity can be delayed and still achieve substantial completion within the contract time.
Section 101 — GENERAL, ABBREVIATIONS, AND DEFINITIONS →Work not provided for in the contract as awarded but found necessary by the Department for satisfactory completion of the contract within its intended scope.
Section 101 — General Information, Definitions, and Terms →Work determined to be essential to the satisfactory completion of the contract but that does not appear in the proposal as a specific pay item and is not included in the price bid for other items in the contract.
Section 101 — Terms, Format, and Definitions →Work not provided for in the contract but considered essential by the Engineer for satisfactory completion of the contract within its intended scope. Falsework. Scaffolding or other temporary structural support for concrete formw ork. Federal-Aid Project. A project that is constructed entirely or partially with federal funds. Field Sampling and Testing Manual. A Department publication that can be found at https://www.dot.nd.gov/divisions/materials/testingmanual.htm Float/Total Float. The number of days by which an activity may be delayed without delaying the project or a milestone. Force Account. Payment for contract revisions per approved costs and additives in accordance with Section 109.03, “Compensation for Contract Revisions.”
Section 101 — ABBREVIATIONS AND DEFINITIONS →An item of work not provided for in the contract as awarded but found essential to the satisfactory completion of the contract within its intended scope.
Section 101 — Terms and Definitions →An item of work not provided for in the Contract as awarded but found essential to the s atisfactory completion of the Contract within its intended scope.
Section 101 — DEFINITIONS AND TERMS →Work within the intended scope of the Contract but beyond or varying from that originally provided for and that the Department later finds essential for satisfactory completion of the project. Extension (in Bid or Pay Items). The arithmetic product of a bid or pay item’s quantity multiplied by the Unit Bid Price. Force Account. A method of payment for work performed by the Contractor at the engineer’s direction; calculated in accordance with Subsection 109.4, Extra and Force