Home / Calculators / Building Permit Fee Calculator

Tampa, Florida Building Permit Cost Calculator

Estimates permit cost in Tampa from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.

217 jurisdictions with fee schedules on file

Total cost of work, labor and materials

Used by cities that price per square foot

Fences and retaining walls

Electrical permits priced by the ampere

Building Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

Custom home (occupancy R-3A), construction type VA or VB, 1,500 sq ft threshold
$1,621.00 base plus $14.00 for each additional 100 sf
see rule
Custom home (occupancy R-3A), construction type VA or VB, 2,500 sq ft threshold
$1,762.00 base plus $23.00 for each additional 100 sf
see rule
Custom home (occupancy R-3A), construction type VA or VB, 3,500 sq ft threshold
$2,004.00 base plus $22.00 for each additional 100 sf
see rule
Custom home (occupancy R-3A), construction type VA or VB, 4,500 sq ft threshold
$2,226.00 base
see rule
Model home, first master plan (occupancy R-3B), construction type VA or VB, 1,500 sq ft threshold
$1,613.00 base plus $14.00 for each additional 100 sf
see rule
Production phase of master plan (occupancy R-3C), construction type VA or VB, 1,500 sq ft threshold
$1,454.00 base plus $13.00 for each additional 100 sf
see rule
Custom home (occupancy R-3A), construction type IA or IB
No base fee published; the city fee estimator returns the $4.00 surcharge minimum alone
see rule
Florida Building Permit Surcharge · add-on
2.5% of permit value or $4.00 minimum — select the permit fee line above to calculate
see rule
How this jurisdiction calculates the fee

New residential construction fees are set by occupancy classification, construction type and project size, charged as a base amount at the applicable size threshold plus an amount for each additional 100 square feet, inclusive of all trades (building, fire, electrical, plumbing, gas, mechanical). SOURCING GAP CLOSED 2026-09-29 (lane B run 1809 / pipeline run 99) AFTER FOURTEEN CONSECUTIVE HELD PASSES. tampa.gov/construction-services/info/fee-schedule still links only five documents (Miscellaneous Project Permit, Trade Permit, General and Administrative, each "Updated 5-31-20", plus Fire Line Connection Fee and Hillsborough County School Impact Fees "Updated 6-5-2020"), none of which prices new residential construction; that is unchanged from every prior pass. What IS new this pass is that the Construction Permit Fee Estimator the page directs users to for new complete building projects, https://apps.tampagov.net/csd_fee_estimator_webapp/, was REACHABLE for the first time (HTTP 200; earlier passes recorded the agent proxy refusing it) and was driven directly. METHOD, SO THE NEXT PASS CAN REPRODUCE IT EXACTLY: the estimator is an ASP.NET WebForms app driven by __VIEWSTATE/__EVENTVALIDATION postbacks. Sequence: rblProjType=R, then ddlProjectCategory=B1000 (NEW COMPLETE CONSTRUCTION FEE), then ddlOccupancyClass (R-3A Dwellings-Custom Homes, R-3B Dwellings-Models First Master Plan, R-3C Dwellings-Production Phase Master Plan, U-2 Accessory-Private Garage), then ddlConstructionType (1A 1B 2A 2B 3A 3B 4 5A 5B XX), then txtSquareFootage, then btnEstimateFee. The app returns Estimated Plan Review Cost + Estimated Remaining Cost = Estimated Permit Fee, and THAT DISPLAYED TOTAL INCLUDES THE 2.5% FLORIDA SURCHARGE: dividing every one of 20 probe results by 1.025 yields an exact whole-dollar base, which is how the base amounts below were read. RESULT: ALL FOUR STORED BASE AMOUNTS RE-CONFIRMED EXACTLY ($1,621.00 / $1,762.00 / $2,004.00 custom; $1,613.00 model first master plan; $1,454.00 production phase). THREE STORED PER-100-SQUARE-FOOT INCREMENTS WERE EACH EXACTLY $1.00 TOO HIGH AND HAVE BEEN CORRECTED: custom-home 1,500 sq ft band $15.00 -> $14.00; 2,500 sq ft band $24.00 -> $23.00; 3,500 sq ft band $23.00 -> $22.00. Model first master plan $15.00 -> $14.00 and production phase $14.00 -> $13.00 were corrected on the same evidence. Derivation, all at construction type 5A (5B returns identical results, confirming the VA/VB grouping): 1500=1621, 1700=1649, 2000=1691, 2400=1747 (1621 + 9 x 14 = 1747, so $14.00/100sf); 2500=1762, 2700=1808, 3000=1877, 3400=1969 (1762 + 9 x 23 = 1969, so $23.00/100sf); 3500=2004, 3800=2070, 4000=2114, 4400=2202 (2004 + 9 x 22 = 2202, so $22.00/100sf). A FURTHER BAND BOUNDARY EXISTS AT 4,500 SQ FT (base $2,226.00), not previously recorded and not yet carried as an example. ONE STORED LINE WAS REMOVED RATHER THAN REWRITTEN: the former "Custom home, construction type IA or IB, 1,500 sq ft threshold = $2,432.00 base plus $22.00 for each additional 100 sf". The estimator prices NO base fee for occupancy R-3A at construction type 1A or 1B - it returns a total of $4.00, i.e. the Florida surcharge minimum alone, at 1,500 and at 2,500 square feet for both 1A and 1B. That is an affirmative result from the agency tool, not a truncated read, but because it is an absence rather than a figure the line was deleted and recorded here rather than replaced with an invented amount. If a Type I residential base fee is wanted, it needs a human ruling, not another automated pass. The Florida Building Permit Surcharge (2.5% of permit value, $4.00 minimum) continues to verify on the Miscellaneous Project Permit Fee Schedule and is now corroborated by the estimator arithmetic above. Row stamped for the first time since 2026-08-03; it was the oldest row in the table and the sole driver of max_age.

Source: published fee schedule · Verified 9/29/2026

Deck Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Accessory Structure (gazebo, deck, pergola, shed), residential
Flat fee $177.00
$177.00
○Site: driveway, patio slab, deck, residential
Flat fee $214.00
$214.00
○Aluminum Screen Room / Pool Cage / Porch, residential
Flat fee $316.00
$316.00
○Aluminum Sun Room / Carport, residential
Flat fee $510.00
$510.00
Florida Building Permit Surcharge · add-on
2.5% of permit value or $4.00 minimum — select the permit fee line above to calculate
see rule
How this jurisdiction calculates the fee

Decks are permitted as miscellaneous projects at a flat fee, and the Miscellaneous Projects Permit Fee Schedule lists decks under two separate line items depending on how the work is classified.

Source: published fee schedule · Verified 11/10/2026

Electrical Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Electrical trade permit, residential
Flat fee $120.00
$120.00
○Service Upgrade, residential
Flat fee $120.00
$120.00
○Photovoltaic cells, residential
Flat fee $120.00
$120.00
○Generator, residential
Flat fee $291.00
$291.00
Florida Building Permit Surcharge · add-on
2.5% of permit value or $4.00 minimum — select the permit fee line above to calculate
see rule
How this jurisdiction calculates the fee

Electrical work is issued as a trade permit at a flat fee.

Source: published fee schedule · Verified 11/10/2026

Reroof Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Roofing, residential
Flat fee $177.00
$177.00
○Roofing, commercial
Flat fee $220.00
$220.00
○Skylight
Flat fee $120.00
$120.00
Florida Building Permit Surcharge · add-on
2.5% of permit value or $4.00 minimum — select the permit fee line above to calculate
see rule
How this jurisdiction calculates the fee

Roofing is issued as a trade permit at a flat fee.

Source: published fee schedule · Verified 11/10/2026

Retaining Wall Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Privacy/Retaining Wall, residential
Flat fee $475.00
$475.00
○Privacy/Retaining Wall, commercial
Flat fee $589.00
$589.00
○Seawall, residential
Flat fee $494.00
$494.00
Florida Building Permit Surcharge · add-on
2.5% of permit value or $4.00 minimum — select the permit fee line above to calculate
see rule
How this jurisdiction calculates the fee

Privacy and retaining walls are permitted as miscellaneous projects at a flat fee.

Source: published fee schedule · Verified 11/10/2026

Shed Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Accessory Structure (gazebo, deck, pergola, shed), residential
Flat fee $177.00
$177.00
○Accessory Structure (gazebo, deck, pergola, shed), commercial
Flat fee $287.00
$287.00
Florida Building Permit Surcharge · add-on
2.5% of permit value or $4.00 minimum — select the permit fee line above to calculate
see rule
How this jurisdiction calculates the fee

Sheds are permitted as miscellaneous accessory structures at a flat fee.

Source: published fee schedule · Verified 11/10/2026

Water Heater Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Plumbing trade permit, residential
Flat fee $120.00
$120.00
○Mechanical trade permit, residential
Flat fee $120.00
$120.00
○Solar Water Heater, residential
Flat fee $120.00
$120.00
○Natural and LP Gas Piping, residential
Flat fee $162.00
$162.00
Florida Building Permit Surcharge · add-on
2.5% of permit value or $4.00 minimum — select the permit fee line above to calculate
see rule
How this jurisdiction calculates the fee

Water heater work is issued as a plumbing or mechanical trade permit at a flat fee.

Source: published fee schedule · Verified 11/10/2026

See the full write-up: Tampa building permit cost

Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.