454.05 Basis of Payment.
454.05 Basis of Payment.
455.01 Description.
This Section shall cover the work of grinding Portland Cement Concrete pavement at locations shown on the plans or directed by the Engineer. The primary locations will be th e right -hand lane, or truck lane, of each roadway, but may include other locations. Said grinding is intended to substantially correct joint faulting, surface drainage, skid resistance, riding characteristics and/or removal of excessive surface material.
455.02 Materials.
N/A
455.03 Construction Requirements.
455.04 Method of Measurement.
455.04 Method of Measurement.
The grinding of pavement ordered and accepted will be measured in square yards {square meters} computed from surface measurements taken to the nearest 0.1 of a foot {0.1 m} on the processed pavement. Those areas of pavement requiring corrective action due to inappropriate or unacceptable work or negligence on the part of the Contractor will be excluded from measurement for payment.
455.05 Basis of Payment.
455.05 Basis of Payment.
490.01 Description.
This Section shall cover the work of applying Thin Polymer Overlays (TPO) and crack sealing to waterproof and provide a skid resistant riding surface.