698CONSTRUCTION FUEL COST

AL · 2022 Standard Specifications✓ Full text on BuildSpecBook pages 585–0 Save this section

Ask about Section 698

Get a cited answer from the section text. Click the citation to check it.

One cited answer a day is free. Start a 14-day trial for unlimited, no card required.

583

CONSTRUCTION FUEL COST

698.01Description

This Section shall cover the cost of construction fuel for the equipment necessary for the performance of the required work except for the production of Hot Mix Asphalt (HMA).

698.02Bidding

The bidder shall enter an amount from zero dollars up to the maximum dollar amount shown in the pay item description for fuel on the proposal form. The Contractor signifies that this amount represents a reasonable estimate of the fuel costs isolated from all other costs of completing the required work except for the production of HMA. If a proposal contains an amount greater than the maximum amount shown in the pay item description, the amount bid for Construction Fuel will be assigned a value that is the maximum amount.

698.03Method of Determining Partial Payments and Cost Adjustments

(a)Partial Payments.

Partial payments for construction fuel will be based on the lump sum bid price for Construction Fuel and the Work Performed ("Work Performed" is defined in Section 101). This component will be calculated as follows. WP ce - WPpe P = CF OC – PBPI 2

Where, P = Amount of Partial Payment. (Dollars) (The total sum of partial payments may be less than or exceed the original contract amount for Construction Fuel.) CF = Lump Sum Contract Amount of "Construction Fuel". (Dollars) WP ce = "Work Performed" (as defined in Article 101.01) at the time of the current estimate or partial payment. (Dollars) WP pe = "Work Performed" (as defined in Article 101.01) at the time of the prior estimate for partial payment. (Dollars) OC = Original Contract Amount. (Dollars) PBPI2 = Original Bid Price for Mobilization, Geometric Controls, and Construction Fuel. (Dollars) The decimal value derived by the term "(WPce – WPpe) / (OC- PBPI2)" rounded to the nearest hundredth will be the decimal amount of the lump sum contract amount for construction fuel. WP is the "Work Performed" (as defined in Article 101.01).

(b)Cost Adjustments.

The Department will determine and publish a monthly "Fuel Index" utilizing the average area terminal price reports for regular unleaded gasoline and No. 2 fuel of the "Platts Oilgram Price Report" published during the week in which the first day of the month occurs. The Base Fuel Index (BFI) for the project will be the monthly fuel index published for the month in which the bids were opened for the project. The Current Fuel Index (CFI) for the project will be the monthly fuel index published for the previous month if the estimate is finalized on any day from the 1st through the 10th day of the month. The Current Fuel Index (CFI) for the project will be the monthly fuel index published for the month in which the estimate is finalized if the estimate is finalized on any day between the 11th and the last day of the month. A cost adjustment for construction fuel will be calculated as follows:

TRAFFIC STRIPE 584

CFI CA = P - 1 BFI

Where, CA = Amount of Cost Adjustment (Dollars) P = Amount of Partial Payment Based on Amount of Work Performed (Dollars) CFI = Current Fuel Index (the current month’s CFI is defined above) BFI = Base Fuel Index After the expiration of contract time (plus approved time extensions) two calculations of a potential cost adjustment will be made. The first calculation will be made using the current index (CFI) and the base index (BFI) as noted in the preceding formula. The second calculation will be made using the index during the month that contract time (plus approved time extensions) expired and the base index. The smallest amount of cost adjustment resulting from these two calculations will be made for the current estimate period.

(c)Payments and Adjustments for Contracts with More Than One Project.

When more than one project is included in one contract, the amount of payment to be made will be based on the "Work Performed", as defined in Section 101, on the entire contract, not on each individual project. Once the amount of partial payment and cost adjustment is determined, this amount will then be prepared for payment on each individual project based on the fraction of the entire contract of which the project is a part.

698.04Basis of Payment

(a)Unit Price Coverage.

The amount designated for construction fuel, shall be full compensation, after all applicable cost adjustments, for the furnishing of fuel for equipment used on the project, except for the fuel for the production of HMA, and for all materials, equipment, tools, labor, transportation and incidentals necessary for its use. Partial payments for the item of Construction Fuel will be made in accordance with Article

. At the completion of work, the sum of partial payments may exceed or be less than the original

contract lump sum unit price bid. The final quantity may be more or less than 1.0 due to contract overruns or underruns.

(b)Payment will be made under Item No.:

698-A Construction Fuel (max. bid limited to $ ) - per Lump Sum

DIVISION 700 — TRAFFIC CONTROL DEVICES — AND HIGHWAY LIGHTING — TRAFFIC STRIPE

701.01Description

This Section shall cover the work of placing a permanent or temporary traffic stripe at the locations shown on the plans or where directed by the Engineer. This Section shall also cover the removal of existing or temporary traffic stripe.

701.02Materials

Materials shall be furnished in accordance with the requirements given in Sections 856 and 857. The required dimensions, color, class, retro reflectivity and type of stripe will be shown on the plans. The required type of material will be designated by "Class" in accordance with the following. TRAFFIC STRIPE 585

CLASS OF TRAFFIC STRIPE CLASS MATERIAL 1 Paint 1H High Build Paint 2 Standard Thermoplastic Material 2T Thin Film Spray Applied Thermoplastic Material 3 Tape W Warranted Traffic Marking Material The required reflectivity will be designated by "Type" in accordance with the following. TYPE OF TRAFFIC STRIPE TYPE REFLECTIVITY A Reflective B Non-reflective Class 1H, Class 2, and Class 2T materials shall be in compliance with the formulations given in the tables in Section 856 for each class. Class 1, Class 3, Class W, and Drop On Glass Beads shall be one of the materials shown on List V-3, Temporary Traffic Marking Materials, and List V-4, Permanent Traffic Marking Materials. These lists are in the Department’s MSDSARS Information concerning these lists is given in Subarticle 106.01(f) and ALDOT-355.

701.03Construction Requirements

(a)Acceptance Program for Traffic Marking Materials.

The guidelines for the evaluation and acceptance of traffic marking materials are given in the procedure ALDOT-420 "Acceptance Program for Traffic Marking Materials". These guidelines shall be followed in the furnishing and placement of stripe.

(b)Temporary Traffic Stripe.
1.Requirement for Use.

A roadway shall not be opened to traffic without a traffic stripe unless approved otherwise by the Engineer. Lane lines shall be maintained at all times when traffic is required to pass through the areas of construction. Existing lane lines covered by paving operations shall be replaced with temporary stripe. Temporary edge lines will not be required unless shown to be required on the plans or required by the Engineer.

2.Allowable Material.

Temporary traffic stripe shall be reflective and shall be:  Permanent Traffic Marking Materials (Class 1, LIST V-4) or;  Removable Tape (List V-3).

3.Weather Conditions for Application.

Temporary striping may be placed without regard to the weather conditions if allowed by the Engineer.

4.Configuration.

A broken line of temporary stripe shall consist of 4 inch {100 mm} wide by 8 foot {2.4 m} long markings placed on 40 foot {12 m} centers. A solid line of temporary stripe shall be a continuous 4 inch {100 mm} wide stripe. Other width stripes may be required as shown on the plans.

5.Temporary Traffic Marking Tape.

Temporary traffic marking tape shall be applied as recommended by the tape manufacturer or as directed by the Engineer. Any failure of traffic marking tape shall be repaired immediately.

6.Removal.

A temporary solid line stripe of marking tape used on an underlying pavement layer, or any type temporary stripe of marking tape used on a wearing surface shall be removed. A temporary solid or broken line stripe of paint used on a wearing surface shall be removed if it is not to be completely covered with a Class 1H or 2 permanent stripe. TRAFFIC STRIPE 586

Other types of temporary stripe may remain in place if the temporary stripe will be covered by the placement of paving layers or permanent stripe.

(c)Class 1 Paint.
1.Usage.

Class 1 paint shall be used for temporary striping unless shown otherwise on the plans. Class 1 paint shall not be applied to concrete surfaces.

2.Surface Preparation.

Areas to be striped shall be thoroughly cleaned of all dirt, oil and other debris in a way that will not damage the pavement surface. Striping shall not begin until the Engineer has inspected the pavement surface and has informed the Contractor that striping may begin.

3.Weather Conditions for Application.

Class 1 paint may be placed without regard to the weather conditions if allowed by the Engineer.

4.Equipment for Application.

Equipment for the application of Class 1 paint shall be designed to place the paint and reflective beads when required. The equipment shall be capable of placing the materials at the required rates of placement and within the allowable placement tolerances.

5.Rate of Placement.

Class 1 paint for temporary applications shall be placed at the rate of 10 gallons per mile for a 4 inch wide solid stripe {24 L/km for a 100 mm wide solid stripe} except for the following circumstances. The rate of placement for temporary applications shall be 18 gallons per mile for a 4 inch wide solid stripe {43 L/km for a 100 mm wide solid stripe} on rough pavement surfaces such as Open Graded Friction Course (OGFC), milled surfaces, or when used as a temporary stripe that will not be covered within 60 calendar days. Class 1 paint for permanent applications shall be placed at the rate of 22.5 gallons per mile for a 5 inch wide solid stripe {53.8 L/km for a 125 mm wide solid stripe} except for the following circumstances. The rate of placement for permanent applications shall be 27.5 gallons per mile for a 5 inch wide solid stripe {65.0 L/km for a 125 mm wide solid stripe} on rough pavement surfaces such as Open Graded Friction Course (OGFC) and milled surfaces. The rates of placement for other widths of stripe and for broken stripe shall be the prorated rates of placement determined from the placement rates given for 5 inch {125 mm} solid stripe. Paint stripe that is placed at a rate that is not greater than 95 % of the required rate shall be replaced if the stripe is not accepted by the Engineer with an approved price reduction.

6.Placement of Reflective Beads.

Type 1 glass beads shall be placed at a rate of 146.3 pounds per mile for a solid 5 inch wide stripe {41.3 kg/km for 125 mm wide solid stripe}. Prorated rates of application shall be made other widths of stripe and for broken stripe. Beads shall be applied before the final set of the paint has occurred to ensure that the beads will adhere to the paint.

(d)Class 1H, High Build Paint.
1.Usage.

Class 1H paint shall be used for State maintenance operations only. Class 1H paint may be applied to asphalt and concrete surfaces. Asphalt pavement shall be allowed to cure for a period of 14 calendar days before the application of the Class 1 H paint. Concrete pavement shall be allowed to cure for a period of 30 calendar days before the application of the Class 1 H paint.

2.Surface Preparation.

Areas to be striped shall be thoroughly cleaned of all dirt, oil and other debris in a way that will not damage the pavement surface. Striping shall not begin until the Engineer has inspected the pavement surface and has informed the Contractor that striping may begin. Curing compound on concrete surfaces shall be removed by grinding, wire brushing, sand blasting or other effective means.

3.Weather Conditions for Application.

Permanent Class 1H paint shall not be placed during rain or mist or if the pavement surface is wet. Class 1H paint shall only be placed when the pavement temperature is 45 ºF {7 ºC} and rising. TRAFFIC STRIPE 587

4.Equipment for Application.

Equipment for the application of Class 1H paint shall be designed to place the paint, and reflective beads when required, at the required rates of placement and within the allowable placement tolerances.

5.Rate of Placement.

Class 1H paint shall be placed at the rate given in the following table. Rough pavement surfaces are such surfaces as Open Graded Friction Course (OGFC) and milled surfaces. Class 1H paint shall be placed at the rate of 34.3 gallons per mile for a 5 inch wide solid stripe {81.8 L/km for a 125 mm wide solid stripe} except for the following circumstances. The rate of placement for permanent applications shall be 40.5 gallons per mile for a 5 inch wide solid stripe {96.8 L/km for a 125 mm wide solid stripe} on rough pavement surfaces such as Open Graded Friction Course (OGFC) and milled surfaces. The rates of placement for other widths of stripe and for broken stripe shall be prorated rates determined from the placement rates given for 5 inch {125 mm} solid stripe. Class 1H paint stripe that is placed at a rate that is not greater than 95 % of the required rate shall be replaced if the stripe is not accepted by the Engineer with an approved price reduction. The required width of the stripe will be shown on the plans.

6.Placement of Reflective Beads.

Type 3 glass beads shall be placed on the Class 1H paint at a rate of 220 pounds per mile for a 5 inch solid wide stripe {93.7 kg/km for 125 mm wide solid stripe}. The rates of placement for other widths of stripe and for broken stripe shall be prorated rates determined from the placement rates given for 5 inch {125 mm} solid stripe.

7.Retro Reflectivity.

The target retro reflectivity shall be 300 mcd/lux/sq m for white stripe and 200 mcd/lux/sq m for yellow stripe. The Engineer will measure the retro reflectivity of edge lines for each color at 3random locations throughout the project selected in accordance with the requirements given in ALDOT Procedure 210, "Selecting Samples by the Random Numbers Method" and ALDOT Procedure 422. If the average of the 3 retro reflectivity measurements is 85 % of the target retro reflectivity, or greater, the sublot will be accepted without a price adjustment for retro reflectivity. If the average of the 3 retro reflectivity measurements is less than 85 % and greater than 50 % of the target retro reflectivity, the sublot will be paid for at a percentage equal to the percentage determined from the measurements. For example, if the average of the measurements is 65 % of the target retro reflectivity, payment for the stripe will be 65 % of the contract unit price. If the average of the 3 retro reflectivity measurements is 50 % of the target retro reflectivity, or less, the sublot shall be removed and replaced without extra compensation. Any portion of the stripe that is determined by the Engineer to be noticeably inconsistent with the overall striping and measures less than 50 % of the target retro reflectivity shall be removed and replaced without extra compensation. Retro reflectivity measurements will be made in accordance with the requirements given in ALDOT-422 "Method of Retro Reflectivity Measurement of Traffic Marking Materials" with the exception of the sampling frequency. Measurements will be made between 7 and 30 calendar days after the completion of the placement of all stripe.

8.Color and Luminance Factors.

The color and luminance factors shall meet the requirements given in Section 856.

(e)Class 2, Standard Thermoplastic.
1.Usage.

Class 2 thermoplastic shall be used for permanent striping, and for other circumstances designated by the Engineer. Class 2 thermoplastic may be applied to asphalt and concrete surfaces. Asphalt pavement shall be allowed to cure for a period of 14 calendar days before the application of the thermoplastic. Concrete pavement shall be allowed to cure for a period of 30 calendar days before the application of the thermoplastic.

2.Surface Preparation.

Areas to be striped shall be thoroughly cleaned of all dirt, oil and other debris in a way that will not damage the pavement surface. TRAFFIC STRIPE 588

Curing compound on concrete surfaces shall be removed by grinding, wire brushing, sand blasting or other effective means. A primer, sealer or surface preparation adhesive of the type recommended by the manufacturer of the Class 2 thermoplastic shall be applied to concrete surfaces (concrete pavement and bridge decks) before the application of the thermoplastic. Longitudinal stripes shall be offset at least 2 inches {50 mm} from longitudinal joints in concrete surfaces. Striping shall not begin until the Engineer has inspected the pavement surface and has informed the Contractor that striping may begin.

3.Weather Conditions for Application.

Class 2 thermoplastic shall not be placed during rain or mist or if the pavement surface is wet. The pavement surface temperature shall be at least 50 °F {10 °C} and rising before application will be allowed to asphalt pavement surfaces. The pavement surface temperature shall be at least 60 °F {16 °C} and rising before application will be allowed to concrete pavement surfaces.

4.Equipment for Application.

The equipment shall be capable of placing thermoplastic and beads at the required rates of placement and within the allowable placement tolerances. The equipment shall have the capacity to maintain the thermoplastic at temperatures greater than 390 °F {200 °C}. The temperature of the thermoplastic shall be greater than 390 °F {200 °C} at the point of application. The equipment shall be capable of applying glass beads to the surface of the stripe by a double drop application. The bead dispenser for the first bead drop shall be attached to the striping machine so that the beads are dispensed closely behind the thermoplastic material. The second bead dispenser shall be attached to the striping machine so that the beads are dispensed immediately after the first bead drop application. The bead dispensers shall be equipped with an automatic cut-off control that is synchronized with the cut-off of the thermoplastic material. The dispensers shall apply the glass beads to produce a uniform appearance on the entire surface of the stripe and 50 % embedment of the beads. The Engineer will make the determination of the acceptability of the bead embedment by visual inspection.

5.Required Thickness and Width.

Class 2 thermoplastic shall be placed to a target uniform thickness of 0.100 inches {2.5 mm. The required width of the stripe will be shown on the plans. The Engineer will measure the thickness and width of all edge lines and center lines for each color at 3 locations per sublot selected in accordance with the requirements given in ALDOT Procedure 210 and ALDOT Procedure 423. Measurements will be made between 7 and 30 calendar days after the completion of the placement of all stripe. If the average of the 3 thickness measurements is 85 % of the target thickness, or greater, the sublot will be accepted without a price adjustment for thickness. If the average of the 3 thickness measurements is less than 85 % and greater than 50 % of the target thickness, the sublot will be paid for at a percentage equal to the percentage determined from the measurements. For example, if the average of the measurements is 65 % of the target thickness, payment for the sublot will be 65 % of the contract unit price. If the average of the 3 thickness measurements is 50 % of the target thickness, or less, the sublot shall be removed and replaced without extra compensation. Any portion of the stripe that is determined by the Engineer to be noticeably inconsistent with the overall striping and measures less than 50 % of the target thickness shall be removed and replaced without extra compensation. Acceptance of sublots based on stripe width will be made by comparing the average of the 3 width measurements to the criteria stated in Subarticle 701.03(k).

6.Placement of Reflective Beads.

The Contractor shall use either one of the optional double drop bead systems shown in the following tables.

TRAFFIC STRIPE 589

OPTION 1 > AASHTO TYPE 4 BEADS AND AASHTO TYPE 1 BEADS Type of Reflective Beads AASHTO Type 4 AASHTO Type 1 Order of Placement First Second Minimum Rate of Placement 6 pounds per 100 sq ft {2.7 kg per 9.3 m2} 8 pounds per 100 sq ft {3.6 kg per 9.3 m2}

OPTION 2 > 3M "REFLECTIVE ELEMENTS" AND AASHTO TYPE 3 BEADS Type of Reflective Beads 3M "Reflective Elements" AASHTO Type 3 Order of Placement First Second Minimum Rate of Placement 6.6 pounds per 100 sq ft {3.0 kg per 9.3 m2} 10 pounds per 100 sq ft {4.5 kg per 9.3 m2}

7.Retro reflectivity.

The target retro reflectivity shall be 450 mcd/lux/sq m for white stripe and 300 mcd/lux/sq m for yellow stripe. The Engineer will measure the retro reflectivity of all edge lines and center lines for each color at 3 locations per sublot selected in accordance with the requirements given in ALDOT Procedure 210 and ALDOT Procedure 422. Measurements will be made between 7 and 30 calendar days after the completion of the placement of all stripe. If the average of the 3 retro reflectivity measurements is 85 % of the target retro reflectivity, or greater, the sublot will be accepted without a price adjustment for retro reflectivity. If the average of the 3 retro reflectivity measurements is less than 85 % and greater than 50 % of the target retro reflectivity, the stripe will be paid for at a percentage equal to the percentage determined from the measurements. For example, if the average of the measurements is 65 % of the target retro reflectivity, payment for the stripe will be 65 % of the contract unit price. If the average of the 3 retro reflectivity measurements is 50 % of the target retro reflectivity, or less, the sublot shall be removed and replaced without extra compensation. Any portion of the stripe that is determined by the Engineer to be noticeably inconsistent with the overall striping and measures less than 50 % of the target retro reflectivity shall be removed and replaced without extra compensation.

8.Color and Luminance Factors.

The color and luminance factors shall meet the requirements given in Section 856. Referee Testing The Contractor may request that Referee Testing be performed. Referee Testing will be performed by the Contractor with the Department’s device and under the supervision of the Department’s inspector or project manager. The results of any Referee Testing will be the final measurements used for payment, regardless of whether or not the measurements are greater than or less than the original measurements performed by the Department.

(f)Class 2T, Thin Film Spray Applied Thermoplastic.
1.Usage.

Class 2T thermoplastic shall be used for permanent striping, and for other circumstances designated by the Engineer. Class 2T thermoplastic may be applied to asphalt and concrete surfaces. Asphalt pavement shall be allowed to cure for a period of 14 calendar days before the application of the thermoplastic. Concrete pavement shall be allowed to cure for a period of 30 calendar days before the application of the thermoplastic.

2.Surface Preparation.

Areas to be striped shall be thoroughly cleaned of all dirt, oil and other debris in a way that will not damage the pavement surface. Curing compound on concrete surfaces shall be removed by grinding, wire brushing, sand blasting or other effective means. TRAFFIC STRIPE 590

A primer, sealer or surface preparation adhesive of the type recommended by the manufacturer of the Class 2T thermoplastic shall be applied to concrete surfaces (concrete pavement and bridge decks) before the application of the thermoplastic. Longitudinal stripes shall be offset at least 2 inches {50 mm} from longitudinal joints in concrete surfaces. Striping shall not begin until the Engineer has inspected the pavement surface and has informed the Contractor that striping may begin.

3.Weather Conditions for Application.

Class 2T thermoplastic shall not be placed during rain or mist or if the pavement surface is wet. The pavement surface temperature shall be at least 50 °F {10 °C} and rising before application will be allowed to asphalt pavement surfaces. The pavement surface temperature shall be at least 60 °F {16 °C} and rising before application will be allowed to concrete pavement surfaces.

4.Equipment for Application.

Equipment for the application of Class 2T thermoplastic shall be designed to place the thermoplastic and beads at the required rates of placement and within the allowable placement tolerances. The equipment shall have the capacity to maintain the thermoplastic at temperatures greater than 390 °F {200 °C}. The temperature of the thermoplastic shall be greater than 390 °F {200 °C} at the point of application.

5.Required Thickness and Width.

Class 2T thermoplastic shall be placed to a target uniform thickness of 0.060 inches {1.5 mm}. The required width of the stripe will be shown on the plans. The Engineer will measure the thickness and width of all edge lines and center lines for each color at 3 locations per sublot selected in accordance with the requirements given in ALDOT Procedure 210 and ALDOT Procedure 423. Measurements will be made between 7 and 30 calendar days after the completion of the placement of all stripe. If the average of the 3 thickness measurements is 85 % of the target thickness, or greater, the sublot will be accepted without a price adjustment for thickness. If the average of the 3 thickness measurements is less than 85 % and greater than 50 % of the target thickness, the sublot will be paid for at a percentage equal to the percentage determined from the measurements. For example, if the average of the measurements is 65 % of the target thickness, payment for the stripe will be 65 % of the contract unit price. If the average of the 3 thickness measurements is 50 % of the target thickness, or less, the sublot shall be removed and replaced without extra compensation. Any portion of the stripe that is determined by the Engineer to be noticeably inconsistent with the overall striping and measures less than 50 % of the target thickness shall be removed and replaced without extra compensation. Acceptance of sublots based on stripe width will be made by comparing the average of the 3 width measurements to the criteria stated in Subarticle 701.03(k).

6.Placement of Reflective Beads.

Type 1 glass beads shall be placed on the Class 2T thermoplastic at a rate of 220 pounds per mile for a 5 inch solid wide stripe {93.8 kg/km for 125 mm wide solid stripe}. The rates of placement for other widths of stripe and for broken stripe shall be prorated rates determined from the placement rates given for 5 inch {125 mm} solid stripe.

7.Retro reflectivity.

The target retro reflectivity shall be 250 mcd/lux/sq m for white stripe and 175 mcd/lux/sq m for yellow stripe. The Engineer will measure the retro reflectivity of all edge lines and center linesfor each color at 3 locations per sublot selected in accordance with the requirements given in ALDOT Procedure 210 and ALDOT Procedure 422.. Measurements will be made between 7 and 30 calendar days after the completion of the placement of all stripe. If the average of the 3 retro reflectivity measurements is 85 % of the target retro reflectivity, or greater, the sublot will be accepted without a price adjustment for retro reflectivity. If the average of the 3 retro reflectivity measurements is less than 85 % and greater than 50 % of the target retro reflectivity, the sublot will be paid for at a percentage equal to the percentage determined from the measurements. For example, if the average of the measurements is 65 % of the target retro reflectivity, payment for the stripe will be 65 % of the contract unit price. TRAFFIC STRIPE 591

If the average of the 3 retro reflectivity measurements is 50 % of the target retro reflectivity, or less, the sublot shall be removed and replaced without extra compensation. Any portion of the stripe that is determined by the Engineer to be noticeably inconsistent with the overall striping and measures less than 50 % of the target retro reflectivity shall be removed and replaced without extra compensation.

8.Color and Luminance Factors.

The color and luminance factors shall meet the requirements given in Section 856.

9.Referee Testing

The Contractor may request that Referee Testing be performed. Referee Testing will be performed by the Contractor with the Department’s device and under the supervision of the Department’s inspector or project manager. The results of any Referee Testing will be the final measurements used for payment, regardless of whether or not the measurements are greater than or less than the original measurements performed by the Department.

(g)Class 3, Tape.

Class 3 Tape shall be used for permanent striping, and for other circumstances designated by the Engineer. Class 3 tape shall be applied in accordance with the procedures recommended by the manufacturer. Tape shall not be placed when the pavement temperature is below 60 °F {16 °C}. Tape may be placed at lower temperatures if shown in the manufacturer's recommendations for placement and allowed by the Engineer. The target retro reflectivity of the Class 3 tape shall be 450 mcd/lux/sq m for white tape and 350 mcd/lux/sq m for yellow tape. The Engineer will measure the retro reflectivity of all edge lines and center lines for each color at 3 locations per sublot selected in accordance with the requirements given in ALDOT Procedure 210 and ALDOT Procedure 422. Measurements will be made between 7 and 30 calendar days after the completion of the placement of all tape. If the average of the 3 retro reflectivity measurements is 85 % of the target retro reflectivity, or greater, the sublot will be accepted without a price adjustment for retro reflectivity. If the average of the 3 retro reflectivity measurements is less than 85 % and greater than 50 % of the target retro reflectivity, the sublot will be paid for at a percentage equal to the percentage determined from the measurements. For example, if the average of the measurements is 65 % of the target retro reflectivity, payment for the tape will be 65 % of the contract unit price. If the average of the 3 retro reflectivity measurements is 50 % of the target retro reflectivity, or less, the sublot shall be removed and replaced without extra compensation. Any portion of the tape that is determined by the Engineer to be noticeably inconsistent with the overall striping and measures less than 50 % of the target retro reflectivity shall be removed and replaced without extra compensation. The Contractor may request that Referee Testing be performed. Referee Testing will be performed by the Contractor with the Department’s device and under the supervision of the Department’s inspector or project manager. The results of any Referee Testing will be the final measurements used for payment, regardless of whether or not the measurements are greater than or less than the original measurements performed by the Department.

(h)Class W, Warranted Traffic Marking Materials.

Class W traffic marking materials shall be used for permanent striping, and for other circumstances designated by the Engineer. Class W traffic marking materials shall be applied in accordance with the procedures recommended by the manufacturer. The initial target retro reflectivity of the striping shall be 450 mcd/lux/sq m for white stripe and 350 mcd/lux/sq m for yellow stripe. The Engineer will measure the retro reflectivity of all edge lines and center lines for each color at 3 locations per sublot selected in accordance with the requirements given in ALDOT Procedure 210 and ALDOT Procedure 422. Measurements will be made between 7 and 30 calendar days after the completion of the placement of all stripe. If the average of the 3 retro reflectivity measurements is 85 % of the target retro reflectivity, or greater, the sublot will be accepted without a price adjustment for retro reflectivity. If the average of the 3 retro reflectivity measurements is less than 85 % and greater than 50 % of the target retro reflectivity, the sublot will be paid for at a percentage equal to the percentage TRAFFIC STRIPE 592

determined from the measurements. For example, if the average of the measurements is 65 % of the target retro reflectivity, payment for the striping will be 65 % of the contract unit price. If the average of the 3 retro reflectivity measurements is 50 % of the target retro reflectivity, or less, the sublot shall be removed and replaced without extra compensation. Any portion of the striping that is determined by the Engineer to be noticeably inconsistent with the overall striping and measures less than 50 % of the target retro reflectivity shall be removed and replaced without extra compensation. The Contractor may request that Referee Testing be performed. Referee Testing will be performed by the Contractor with the Department’s device and under the supervision of the Department’s inspector or project manager. The results of any Referee Testing will be the final measurements used for payment, regardless of whether or not the measurements are greater than or less than the original measurements performed by the Department. Warranty requirements for Class W marking materials are included in MSDSAR manual, List V-4.

(i)Removing Stripe and Markers.

Existing traffic stripe (permanent or temporary), markers and adhesive shall be removed by a method that will not damage or disfigure the appearance of pavement surfaces that will be visible at the completion of construction. Burning the old stripe will not be permitted. Hiding the old stripe by covering it with a striping material that is colored to match the appearance of the pavement surface will only be allowed if approved in writing by the Engineer. Covering the old stripe will only be considered for hiding what may remain of the stripe on rough pavement surfaces like Open Graded Friction Course after other methods of removal have failed to adequately remove the old stripe. The Contractor shall propose the type, color and application rate the striping material for review and approval by the Engineer. There will be no extra compensation given for furnishing and applying striping material to hide an existing stripe. Removal of traffic stripe, existing or temporary, will be paid for as a separate item of work.

(j)Placement Location.

The Engineer will set the limits of no-passing zones. The Contractor shall provide all other controls required to place the stripe in accordance with the details shown on the plans or as directed by the Engineer. The Contractor shall mark the surfaces prior to the placement of the stripe to insure that the stripe will be installed in the required location. The Contractor may be required to adjust the operation of the striping equipment to cover the width and length of existing stripe.

(k)Width and Length Placement Tolerances.
1.Permanent Striping.

A tolerance of 1/2 of an inch {13 mm} over or 1/8 of an inch {3 mm} under the required width will be allowed, provided the variation is gradual and does not detract from the general appearance. Segments of broken line may vary up to 1 foot {0.3 m} from the required length. Segments shall have neat edges without mist or drip. Variations from the control guide up to 1 inch {25 mm} will be allowed provided the variation does not increase or decrease at a rate of more than 1/2 of an inch {13 mm} in 20 feet {7.5 m}. Lines that do not meet these tolerances shall be removed and replaced, without additional compensation. Establishment of tolerances does not relieve the Contractor of responsibility to construct as closely as practicable to exact plan dimensions.

2.Temporary Stripe.

The width of the temporary stripe shall not exceed4 inches {100 mm}, but shall have a 1/2 inch {13 mm} under tolerance. Traffic marking tape shall have a nominal 4 inch {100 mm} width. The tolerance for the lengths of the temporary broken stripe sections shall be 1 foot {0.3 m} under and 1 foot {0.3 m} over the length specified in Subitem 701.03(e)5.a. Strict compliance to alignment on underlying surfaces will not be required provided a reasonable straight line of markings is obtained. The tolerances for placement on a wearing surface shall be the same as those for permanent striping.

3.Failure to Meet Width and Length Placement Tolerances.

Permanent or temporary striping placed on a final wearing surface that does not meet the tolerances specified shall be removed and replaced without compensation. This includes areas where the permanent striping does not match the alignment, spacing, etc. of the temporary stripe, leaving the temporary stripe exposed.

Referenced in this section

Get an email when 698 changes

Alabama revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: Alabama Standard Specifications for Highway Construction, 2022 Edition. Pages 585–0 of 934. View official source ↗

Ask about this section

Scoped to Alabama 2022 Standard Specifications for Highway Construction, Section 698 — CONSTRUCTION FUEL COST. Every answer cites the section it came from, with a verification date — don’t trust a percentage, click the citation.