301.1Description.
This work consists of constructing GABC on a prepared subgrade or subbase.
301.2Materials.
301.3Construction.
compactors.
uncompacted inches to prevent segregation and with a maximum surface deviation of 1/2-inch in 10-feet.
sheepsfoot roller to the satisfaction of the engineer.
stockpiles. The contractor and engineer must agree on placement limits when the contractor plans to use multiple material sources. Ensure that each area of base course constructed is from a single source for full depth placement within agreed limits.
301.4Method of Measurement.
cubic yards or tons of GABC placed and accepted. The Department will determine weight in accordance with Section 109.1.
to tons for the respective material.
301.5Basis of Payment.
or ton for preparing, providing, placing, and compacting all materials. The Department will make no additional payment for work performed to bring recycled concrete aggregate or bituminous concrete millings into compliance with requirements specified in Section 1005.
the contract, the Department will make payments under the milling or excavating items and the GABC item. ITEM DESCRIPTION UNIT 301001 GABC CY 301002 GABC PATCHING CY 301003 GABC TON 301004 GABC PATCHING TON 301005 RECYCLED CONCRETE AGGREGATE CY 301006 RECYCLED ASPHALT PAVEMENT CY 301007 RECYCLED CONCRETE AGGREGATE TON 301008 RECYCLED ASPHALT PAVEMENT TON