Division 500 — Structures

507Prestressed Concrete Bridge Members

GA · 2021 Standard Specifications✓ Full text on BuildSpecBook pages 724–729 Save this section

Ask about Section 507

Get a cited answer from the section text. Click the citation to check it.

One cited answer a day is free. Start a 14-day trial for unlimited, no card required.

SECTION 507 — Prestressed Concrete Bridge Members

507.1General Description

This work consists of furnishing prestressed concrete bridge members, complete in place, except as noted for piling in this specification. The work includes all items and work necessary to complete the erection according to the plans and specifications. All prestressed concrete bridge member nominal lengths shown on the plans are horizontal dimensions. The contractor will be responsible for adjusting the lengths, as necessary, to account for the final erected position of the member. Fabricate the ends of all members to be vertical in the final erected position. Slope bearing assemblies to accommodate the erected position of the member. 507.1.01 Definitions PSC: Prestressed concrete. Prestressed concrete may be designated “PSC” in Specifications and on Plans and other documents. 507.1.02 Related References

A.Standard Specifications
SECTION 109 — Measurement and Payment
SECTION 500 — Concrete Structures
SECTION 501 — Steel Structures
SECTION 506 — Expanded Mortar
SECTION 520 — Piling
SECTION 865 — Manufacture of Prestressed Concrete Bridge Members
B.Referenced Documents

General Provisions 101 through 150. 507.1.03 Submittals

A.Erection Drawings

Furnish erection drawings to the Department only when the units are not interchangeable with respect to the following: • Transverse placement within a span • Longitudinal reversal within a span The drawings shall cover superstructure unit placement, including bearing components.

B.Shop Drawings

Submit shop drawings to the Department on standard Plan size 22 in. x 36 in. (550 mm x 900 mm) sheets showing complete beam details of the following: • Non-prestressed reinforcement • The method of retaining depressed strands in place • Calculations for determining the strand elongation required to produce the specified pre-tensioning force • Detensioning schedule • Increased length of beam due to vertical alignment As an option, shop drawings may be submitted on plan sheet sizes of 12 in. x 18 in. (305 mm x 457 mm) or 11 in. x 17 in. (279 mm x 432 mm) for review and approval. Information contained on these sheets must be legible. 714 714 714 714 714 714

SECTION 507 — Prestressed Concrete Bridge Members

After shop drawings have been approved, submit an electronic file that is compatible with Bentley Microstation J (Version 7) Cadd operating system, or an electronic file in Adobe Acrobat Portable Document Format (.pdf) to the Engineer. For bridges carrying railroads only, after shop drawings have been approved, submit one full size set of reproducible drawings to the Department.

507.2Materials

All materials and manufacturing methods shall meet the requirements of Section 865. Reference is also made to the following: Material Section Plain Steel Bars—Threaded Ends 853.2.05 Anchor Bolts 852.2.02 Bronze Bushings, Bearings, and Expansion Plates 857 Structural Steel 851.2.01 Elastomeric Pads 885.2.01 Plain Cotton Duck 881.2.01 Rubber Impregnated Cotton Duck 881.2.02 Paint 870 Substitute materials according to Subsection 865.2.01.B.3, Substitution of Reinforcement and Subsection 865.2.01.B.4, Substitution of Strands. 507.2.01 Delivery, Storage, and Handling

A.General Delivery, Storage, and Handling

See Subsection 865.2.01, Prestressed Concrete Bridge Members. Replace members damaged in handling or storage (at no additional expense to the Department) unless the Engineer determines that the member is usable.

B.Handling PSC Beams

In handling PSC beams, the Contractor shall ensure that beams maintain an upright position at all times and shall pick up beams at their pickup and support points (see Subsection 865.2.01.B.14.e, Beams). Disregarding this requirement could cause a bridge member to collapse.

507.3Construction Requirements

507.3.01 Personnel General Provisions 101 through 150. 507.3.02 Equipment General Provisions 101 through 150. 507.3.03 Preparation General Provisions 101 through 150. 507.3.04 Fabrication See Subsection 865.2.01.B, Fabrication. 715 715 715 715 715 715

SECTION 507 — Prestressed Concrete Bridge Members

507.3.05 Construction

A.Prepare Bearing Areas

Requirements for preparing steel bearing areas for PSC bridge members will be the same as those specified in Section 501 for Steel Structures, listed below. Other requirements are also noted below:

1.Steel on Concrete

See Subsection 501.3.05.C.1, Steel on Concrete.

2.Steel on Steel

See Subsection 501.3.05.C.2, Steel on Steel.

3.Steel on Self-Lubricating Bronze Plates

See Subsection 501.3.05.C.3, Steel on Self-lubricating Bronze Plates.

4.Steel on Elastomeric Pads

See Subsection 501.3.05.C.4, Steel on Elastomeric Pads.

5.Concrete on Concrete

For concrete caps that PSC deck units will bear directly on, prepare bearing areas as follows:

a.Finish the concrete caps with the Type IV—Floated Surface Finish specified in Subsection 500.3.05. AB.5,

Type IV—Floated Surface Finish.

b.Cover the caps with asphalt-saturated felt as noted on the plans.

The Contractor may use felt of a lighter weight than that required on the Plans by increasing the number of layers proportionally.

6.Concrete on Timber Piling

For treated timber piles that will support PSC caps, prepare bearing areas as follows:

a.Cut off the pile heads.
b.Have the piles field treated as specified in Subsection 520.3.05.J, Repair and Treat Timber Piling.
c.Protect the piles according to the applicable specifications.
B.Erecting PSC Bridge Members

Erect bridge members according to the handling requirements in Subsection 507.2.01, Delivery, Storage, and Handling, and as follows. Refer questions concerning structural requirements to the Engineer.

1.Beams

Erect beams as follows:

a.Erect beams in conformity with true longitudinal alignment and transverse placement as shown on the

Plans or as directed by the Engineer.

b.Ensure that the locations of fixed and expansion ends are as shown on the Plans or as directed by the

Engineer.

c.Do not weld in place structural steel bearing devices that will rest directly upon elastomeric pads while the

devices are bearing against the pads.

2.Caps

Erect PSC caps as follows:

a.Align and grade the caps according to the plans.
b.Drift the caps to the timber pile heads according to the plans.
c.Proportion and mix expanding mortar according to Section 506.

An approved mortar may be substituted for the expanded mortar as long as it is non-shrinking and commercially produced.

d.Fill the drift pin holes with the expanding mortar according to Section 506.

716 716 716 716 716 716

SECTION 507 — Prestressed Concrete Bridge Members
3.Deck Units

Erect PSC deck units (such as flat slabs and double tees) that will bear directly on caps so that all sections have a smooth, uniform bearing on the caps.

a.Aligning Deck Units. Base the final deck unit alignments on the alignment of the traffic faces of the

exterior section curbs.

b.Shimming. If shimming is necessary to achieve proper riding surface, grade, or proper bearing uniformity,

use steel shims and cut them to the following dimensions: The same shape as the area to be shimmed The thickness required to produce the required elevation and load distribution

c.Restrictions. If the Engineer approves deck erection procedures that involve placing heavy lifting

equipment on the decks, do not place the equipment until the cap drift pin mortar reaches 3000 psi (20 MPa).

4.Shear Keys

Pour expanding mortar into shear keys between deck units as follows. The mortar shall meet the requirements of Section 506.

a.Erect the entire bridge.
b.Ensure that all units are in final alignment.
c.Pour the mortar in the shear keys.
d.Continuously moist cure the keys for at least three days.
e.Keep traffic off the structure for at least 5 days.
5.Anchor Bolts and Nut Adjustment

Place anchor bolts and adjust nuts according to Subsection 501.3.05.B.3, Place Anchor Bolts and Adjust Nuts.

6.Deck Grading

Make sure PSC bridge members are 45 days old before grading the bridge deck for screeding.

C.Tighten Diaphragm Bars

Tighten diaphragm bars as follows:

1.Bring the diaphragm bar nuts to a snug fit against the beams.
2.Pour the diaphragm.
3.Allow the diaphragm concrete to age at least 5 days and reach at least 1,500 psi (10 MPa).
4.Tighten the nuts fully.
5.Cut off the excess bar length.
6.Place an approved grout in the recessed area provided for the bar’s nut and washer.
D.Concrete Finish

Use the Type III—Special Surface Coating Finish on PSC bridge members according to Subsection 500.3.05.AB and as follows: • Beams -- Outside faces of certain exterior beams as indicated on the table of Bridge Areas Bridge Areas Requiring a Type III Finish, in Subsection 500.3.05.AB. • Deck Units -- Traffic and top faces of curbs on exterior units and the outside faces of certain exterior beams as specified in the table of Bridge Areas Requiring a Type III Finish, in Subsection 500.3.05. AB. 507.3.06 Quality Acceptance General Provisions 101 through 150. 717 717 717 717 717 717

SECTION 507 — Prestressed Concrete Bridge Members

507.3.07 Contractor Warranty and Maintenance General Provisions 101 through 150.

507.4Measurement

A.Prestressed Concrete Piling

Prestressed concrete piling shall be furnished, driven, and measured as a Pay Item under Section 520.

B.Beams

Accepted PSC beams will be measured in linear feet (meters) of each different type designation of beam. Linear measurements will be the nominal lengths shown on the Plans. Beam type designations will be shown on the Plans and will be related to any of the following: • Cross sectional area and prestress tendons • AASHTO type • Special design

C.Deck Units

Accepted PSC deck units (such as flat slabs and double tees) will be measured for payment per span of each different nominal span length.

D.Caps

Accepted PSC caps will be measured for payment per each cap.

E.Prestressed Concrete Box Beams

PSC box beams will be measured for payment by the linear foot (meter) of beam of each vertical depth and by the number of strands in the beam. 507.4.01 Limits No separate measurement will be made for any of the following: • Painting, rubbing, anchor, and bearing components, as well as diaphragm bar assemblies on accepted PSC beams • Individual deck units on which curb sections are located • Material used in anchor components, shear key pours, and construction expansion joints • Drifting components, anchor components, and asphalt-saturated felt for PSC caps • Grouting between PSC box beams • Furnishing and installation of diaphragm bar assemblies and anchor and bearing components

507.5Payment

Payment will be made under: Item No. 507 PSC Beam (Type) Per linear foot (meter) Item No. 507 Box Beam (Depth/Strands) Per linear foot (meter) Item No. 507 PSC Deck Units_____ foot (meter) span Per span Item No. 507 PSC Caps Per each 718 718 718 718 718 718

SECTION 507 — Prestressed Concrete Bridge Members
A.Beams

The quantity of beams, determined as provided in Subsection 507.4, Measurement, will be paid for at the Contract Price per linear foot (meter) of each different type designation, complete in place.

B.PSC Box Beams

The quantity of PSC box beams will be paid for at the Contract Unit Price bid per linear foot (meter). Payment shall be full compensation for furnishing and erecting the beam.

C.Deck Units

The quantity of deck units will be paid for at the Contract Price per span of each different nominal span length, complete in place.

D.Caps

The quantity of caps will be paid for at the Contract Price per each, complete in place.

E.Partial Payments

Material allowance payments for bridge beams will be determined and paid for according to the requirements of

Subsection 109.07, Partial Payments.

507.5.01 Adjustments

Upon completion of the erection in its final manner and position, 95 percent of the Contract Price will be paid on the

next statement.

If there is no field rubbing or painting required, the 95 percent may be increased to 100 percent of the Contract Price.

If this work is required, the remaining 5 percent will be included on the next statement after the Contractor

satisfactorily completes the work.. 719 719 719 719 719 719

Get an email when 507 changes

Georgia revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: Standard Specifications for Construction of Transportation Systems, 2021 Edition. Pages 724–729 of 2,050. View official source ↗

Ask about this section

Scoped to Georgia 2021 Standard Specifications, Section 507 — Prestressed Concrete Bridge Members. Every answer cites the section it came from, with a verification date — don’t trust a percentage, click the citation.