Illinois Department of Transportation (IDOT) · Standard Specifications for Road and Bridge Construction
Section 205 — EMBANKMENT
Illinois Standard Specifications for Road and Bridge Construction, Section 205. Full text, cross-references and related pay items on BuildSpec.
Embankment Art. 205.02 87 the difference between the existing ground line shown on the plans and the new ground line established from the settlement platforms. (b) Measured Quantities. Furnished excavation will be computed for payment in cubic yards (cubic meters) as follows. Furnished Ex. = Embankment - [Excavation x (1 - Shrinkage Factor)] Where: Embankment = the volume of fill in its final position computed by the method of average end areas and based upon the existing ground line as shown on the plans, except as noted in (1) and (2) below; Excavation = suitable and/or restricted-use…
The rest of Section 205 — EMBANKMENT is for members
You're reading the opening of Section 205 — EMBANKMENT. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.
- Complete section text with subsections and tables
- Search across every state DOT standard specification
- Prior editions and related products
- Ask Copilot about this section, with citations