Illinois Department of Transportation (IDOT) · Standard Specifications for Road and Bridge Construction

Section 661 — HOT-MIX ASPHALT SHOULDER CURB

Illinois Standard Specifications for Road and Bridge Construction, Section 661. Full text, cross-references and related pay items on BuildSpec.

Concrete Shoulder Curb Art. 662.04 575 661.03 General. The temperature of the base on which the curb is placed shall not be less than 40 °F (4 °C) at the time the curb is placed. Prior to placing the curb, the base shall be cleaned and then primed with bituminous material at a rate of 0.05 to 0.1 gal/sq yd (0.2 to 0.5 L/sq m). The HMA shoulder curb shall be constructed with a mechanical curb laying machine of a type approved by the Engineer. Prior to constructing the curb, additional shoulder shall be constructed according to the details shown on the plans. All exposed curb surfaces shall be…

The rest of Section 661 — HOT-MIX ASPHALT SHOULDER CURB is for members

You're reading the opening of Section 661 — HOT-MIX ASPHALT SHOULDER CURB. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.

  • Complete section text with subsections and tables
  • Search across every state DOT standard specification
  • Prior editions and related products
  • Ask Copilot about this section, with citations
Unlock Section 661 — HOT-MIX ASPHALT SHOULDER CURB — free for 14 daysSign in