Art. 610.09 Treatment of Existing Field Tile Systems
610.09 Basis of Payment. Inlet boxes, complete in place, will be paid for at
the contract unit price per each for TYPE E INLET BOX, STANDARD 610001; TYPE F INLET BOX, STANDARD 610001; or TYPE G INLET BOX, STANDARD 610001. Pipe drains will be measured and paid for according to Section 601. End sections will be measured and paid for according to Section 542. Thrust blocks will be paid for at the contract unit price per each for CONCRETE THRUST BLOCKS. The portland cement concrete slab will not be paid for separately but shall be considered as included in the cost of the inlet box. Shoulder curb will be measured and paid for according to Section 661 or Section 662. SECTION 611. TREATMENT OF EXISTING FIELD TILE SYSTEMS
611.01 Description. This work shall consist of locating and treating existing
field tile systems within the limits of the right-of-way. CONSTRUCTION REQUIREMENTS
611.02 Locating Existing Field Tile. Existing field tile in those areas where
they are reported or suspected to exist shall be located by constructing an exploration trench according to Section 213.
611.03 Existing Field Tile Intercepted by Backslopes. Existing field tile
which are intercepted by the backslopes of the roadway after the ditches have been cut shall have the upstream ends tightly sealed with Class SI concrete or brick and mortar. If specified on the plans, the existing field tile within the limits of the pavement and paved shoulders shall be removed or crushed. Removing or crushing existing field tile shall be accomplished by constructing exploration trench along the line of the tile. All trenches cut for the purpose of removing or crushing existing tile within the limits of 2 ft (600 mm) outside the proposed pavement and paved shoulders shall be backfilled to the existing ground line in fill sections and to the elevation of the earth subgrade in cut sections with trench backfill according to Section 208 and compacted according to Article 550.07. Pipe drains, according to the applicable portions of Section 601, shall be used for the terminal 10 ft (3 m) of the existing field tile where it is outletted into the roadway ditch. The pipe drain shall be a single length section of a diameter equal to the diameter of the existing field tile plus 2 in. (50 mm), but not less than 6 in. (150 mm). Pipe drains outletting into a roadway ditch shall have a concrete headwall constructed at the outlet end according to the details shown on the plans. The Treatment of Existing Field Tile Systems Art. 611.07 headwall shall be constructed of Class SI concrete according to the applicable portion of Section 503.
611.04 Field Tile Not Intercepted by Backslopes. Storm sewer shall be
used to replace existing field tile within the right-of-way at locations where the existing tile crosses under the roadway and below the roadway ditches, and shall be constructed according to Section 550. Storm sewer protected shall be used to replace existing field tile within the right- of-way at locations where the existing tile crosses under the roadway and below the roadway ditch. The kinds of material permitted for storm sewer protected shall be Class A according to Article 550.03. Additional protection shall be provided for the storm sewer at roadway ditches by constructing a concrete slab or paved ditch section over the pipe according to the details shown on the plans. The concrete slab shall be used whenever the cover over the slab at the bottom of the ditch is 4 in. (100 mm) or more. The paved ditch section shall be used when the cover is less than 4 in. (100 mm). The concrete slab and paved ditch section shall be constructed of Class SI concrete according to the applicable portions of Section 503. Storm sewer (special) shall be used to replace existing field tile within the right- of-way at locations where the existing tile does not cross under the roadway and is not outlet into the roadway ditch. The kinds of material permitted for storm sewer (special) shall be according to Article 550.03 for storm sewers, Type 2. Storm sewer (special) shall be constructed according to Section 550, except that in lieu of the sand bedding the pipe may be installed according to Article 601.03 and joints between pipe sections shall not be sealed. At locations where storm sewer (special) is outletted into a headwall according to
Article 601 — 05 for pipe drains shall be constructed at the outlet end.
611.05 Field Tile Junction Vaults. Field tile junction vaults, shall be used at
locations where two or more drain lines intersect, where a sharp directional change of flow is required, or where storm sewer or storm sewer (special) connects to existing field tile. Field tile junction vaults shall be constructed according to the details shown on the plans and the applicable portions of Section 602. When required, a sand cushion shall be placed as shown on the plans. Frame and grate, when required, shall be cast iron. All junctions between pipes and vault shall be sealed with mortar consisting of one part portland cement to two parts sand.
611.06 Method of Measurement. Exploration trench for locating existing field
tile and for removing or crushing existing field tile will be measured for payment in feet (meters) of actual trench constructed. Storm sewers protected and storm sewers (special) of the various diameters will be measured for payment in place in feet (meters). Concrete headwalls, concrete slabs, and paved ditch sections will be measured for payment in place and the volume computed in cubic yards (cubic meters).
611.07 Basis of Payment. Locating existing field tile and removing or
crushing existing field tile will be paid for at the contract unit price per foot (meter) for EXPLORATION TRENCH 52 IN. (1.3 M) DEPTH. Art. 611.07 Steel Plate Beam Guardrail Pipe drains will be measured and paid for according to Section 601. Storm sewer protected will be paid for at the contract unit price per foot (meter) for STORM SEWERS PROTECTED, CLASS A, of the type and diameter specified. Storm sewer (special) will be paid for at the contract unit price per foot (meter) for STORM SEWERS (SPECIAL), of the diameter specified. Concrete headwalls, concrete slabs, and paved ditch sections required for this work will be paid for at the contract unit price per cubic yard (cubic meter) for MISCELLANEOUS CONCRETE. Field tile junction vaults will be paid for at the contract unit price per each for FIELD TILE JUNCTION VAULTS, of the diameter specified. Trench backfill will be measured and paid for according to Section 208. Excavation in rock will be measured and paid for according to Section 502. Removal and replacement of unsuitable material below bedding grade will be paid for according to Article 109.04. Sealing the ends of existing field tile will not be paid for as a separate item, but shall be considered as included in the unit prices bid for the various pay items of work involved. SAFETY RELATED ITEMS SECTION 630. STEEL PLATE BEAM GUARDRAIL
630.01 Description. This work shall consist of furnishing and erecting steel
plate beam guardrail and posts.
630.02 Materials. Materials shall be according to the following.
Item Article/Section
Get an email when 611 changes
Illinois revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.