Illinois Department of Transportation (IDOT) · Standard Specifications for Road and Bridge Construction

Section 213 — EXPLORATION TRENCH

Illinois Standard Specifications for Road and Bridge Construction, Section 213. Full text, cross-references and related pay items on BuildSpec.

Exploration Trench Art. 213.04 101 additional material to conform to a uniform cross section will not be required. Immediately prior to final inspection, mowing of the right-of-way will be required at locations as directed by the Engineer. 212.06 Basis of Payment. Except for blading off high spots in the existing earth shoulders where the roadway has been resurfaced and for mowing immediately prior to final inspection, this work will not be measured or paid for separately, but shall be considered as included in the contract unit price for the particular type of surface course, base course or…

The rest of Section 213 — EXPLORATION TRENCH is for members

You're reading the opening of Section 213 — EXPLORATION TRENCH. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.

  • Complete section text with subsections and tables
  • Search across every state DOT standard specification
  • Prior editions and related products
  • Ask Copilot about this section, with citations
Unlock Section 213 — EXPLORATION TRENCH — free for 14 daysSign in